HomeMy WebLinkAbout05-11-83 CCMSPTOI.AL LAKE ELMO COUNCIL MEETING, MAY 11, 1983 Mayor Feder opened the Special Emergency Meeting on Lake Jane Flooding at 6:10 p.m. Allen Dornfeld, President, Valley Branch. Watershed District, introduced Watershed Bagineer, Nels Nelson, who explained the Watershed's request to sandbag the weir on Olson Lake to prevent flooding on Lake Jane. Looking for alternatives, --Noll Nelson - this request is in response to numerous calls about the flooding situation on Lake Jane, Presently is a, threat situation, rather than a flooding situation. Outlined. the varying lake levels. Two suggestions being considered: 1. Temporary - based on the idea that the weir and the pipe on Lake Olson have a greater capacity to permit inflow into Lake Jane than the pump has capability to pump cut, a temporary sandbagging of the weir will permit maintenance of the preseni; levels on Olson avid Demontreville while permitting the pump to catch up with the inflow. The present electric pump can only take cane of 2cfs, Two homes on Lake Jane are threatened, with .flooding. If Olson or Demontreville begin to rise the sandbags will be removed - if Olson or Demontreville fall, more sandbags can be added until Jane is back to a safe level that the pump can handle. Anticipate this process would have to be maintained for a. month before Jane is Stout of the woods". 2.. Long Range Plan - Reduce eon.trol level on weir and/or place a small hole in weir so that water can flow out earlier in the year. This would add water inflow earlier so that the pump could .start pumping earlier, COUNCIL COMMENTS: --Mayor Eder - need to have an awareness that the weir was put in at an elevation that was the settlement of a law suit. Suit involved residents on both sides of the weir, ---Yraser - asked Nelson for a non -technical explainationg calling for this emergency action, --Nets Nelson.- trying to respond to calls and letters received from residents on Lake Jane, Presently there is enough, water on Lake Demontreville to cause flooding on Lake Jane, —Fraser - asked about upstream impact of this proposal.. --Nelson - proposal is to hold the level of Demontreville where it is. Heavy rain would cause minimal problems upstream, No specifics for upstream are available. —Morgan - what plans does VBWD have to get a bigger pump on Jane. --Nelson - currently getting estimates for a larger capacity pump - this will be discussed at the Districts May 12 meeting. Estimates to resat a larger capacity pump are running from $6,000 to $22,000 for 1 to 6 month rental. Also looking into purchasing larger electric pump - estimates running in excess of $259000. Would have to use a diesel now since there is not adequate electric service for a larger capacity electric pump at the present pump site, Can run 2cfs now and can go up to i� oft, but not sure for how long the plastic pipe can handle 2cfs. Considering .replacing the plastic pipe with steel piping up the hill, then continue with plastic. ..-Eder - how long will Demontreville and Olson stay above the weir? --Nelson - under this proposal, one month. Water level has been at weir level for 2-3 weeks. Identified the two homes threatened with flooding - Evanoff & --Eder - know the possibility of damage on one side but not on the other as far as vegetation damage. Lawsuit concerned vegetative damage. 199is being the case would oppose sandbagging and consider only pumping using a larger capacity diesel pump. --Nelson - Demontreville has .fallen I", but Jane is still coming up. --Scotty Lya11, T3irchbard Tr, - should consider impact on threatened homes on windy days where waves would these homes, --Mrs. Evanoff, Jane Rd. N, - presently waves hit bay window of their home on windy days. SPECIAL LASE ELMO COUNCIL MEETING, MAY 119 1983 -2- LAKE J OE FLOODING- Continued - --Eder - District's contingency plan oal]#+for augmenting a deisel pump for emergency situations - this should be -put into effect rather then implementing this suggestion, --Nelson - resident(s) have expressed strong feelings about the diesel pump (against the noise) --Morgan - should do both measures - may damage vegetation, but this is not a threatening situation, Get pump in post-haste to level off Jane, --Gunnar Guidlow - asked about possible storage on upstream latices such as Long or Silver. Also, questioned the holding capacity of City Park Pond. --Nelson - City Park Pond is well below capacity. Chuck Taylor cited present water level and past levels and capacity using the deisel pump. --Nelson - restricting outlet from Long Lake would have little effect, --Taylor - thistime of ,year run-off from Grant Township is significant and increases with every rain. Should check impact from this area. --Ken Sovereign, Olson Lake Tr. N, - Valley Branch has chosen pumping as the means of fretting the water out of Jane - if this means using a larger pump then that what they should do. Disagrees with Engineer Nelson's statement that Olson and. Jane will not flood witl a 6!1�rai.n - f4e1 this was settled as a settlement to a, Lawsuit - appears that if any flooding results from slowing down the natural flow of the water or the judicial flow, which this is, of the water you, have a lawsuit pending. If Valley Branch can keep the level, there is no rain and no flooding nothing will happen. If there is rain and flooding and the pump cannot handle it now, then it cannot handle later. Should check two things- 1. Citys liability if slow drnm the weir 2. VBWD' liability in not installing a. pump large enough to handle capacity. --Nels Nelsen - responded to question from Scotty Lyall concerning drainage from Castle Green. This situation is a concern., but not solely responsible for the flooding on Jane. Also, in response to Mr, Evanoff's question, the District has not made a decision on starting the pump earlier. --Bder - District needs City approval to place sandbags on the weir because the City is the owner of the weir and any alteration of the weir requires City permission as well as DNR approval - City has to decide whether to allow this action by VBWD or not. The weir, its construction and elevation level was a settlement of a lawsuit, with township funds invested in the weir. --Ray Marshall, City Attorney - not familiar with this suit. Would like to review file before making determination as to the settlement stipulations. MVS/ Morgan/Dunn that the City of Lake Elmo strongly urge the Valley Branch Watershed District to install a larger diesel pump (4 cis), on Lake Jane with the capacity to meet the inflow of water into Lake Jane; and, in the interim, until the pump can catch up with the inflow and control the flooding, that the present level of Lakes Olson and Demontreville be maintained by sandbagging the Olson Lake Weir. The level of maintenance shall be the level determined on May 11, 1983, by VBWD. Maximum maintenance time not to exceed two weeks, at this level. The levels on Lakes Olson and Demontreville cannot rise or the sandbages will have to be removed immediately. LAKE ELMO SPECIAL COUNCIL MOETING, MAY 119 1983 -3- LAKE JANE FLOODING: DISCUSSION: --Mazzara - either in this motion or a separate motion would like to see recommendation to slow inflow from Long Lake and Grant Township. Asked how long it will take to implement this action. --Nels Nelson - If BUR permit is secured by Friday, work could start early next weeko --Filer - asked why VB was not prepared for emergency situation this year since they were ready for similar situation last year, --Allen Dornfold - different situation this year- Excessive bank storage created a rapid increase of inflow - discussed situation two weeks ago - plan to take different action in the future. --Eder - concerned about sandbagging the weir, Strongly encourage pumping. If sandbagging has to be, would delay placement of the bags until the pump is in place and operating, --Fraser - supports installation of the pump. This is not something the City controls. Motion provides,the only effective thing the City can do is approve the sandbagging request, Would prefer to let Valley Branch make the decision and hold off sandbagging until the City has an opportunity to pot information on the legal issues. --Morgan -- Motion is only encouraging Valley Branch to go ahead and do something. --Allen Doxnfeld - not only need City permission but Corp of Engineers, Soil and Water Conservation District and the DNR. Thanked the Council for getting the "ball rolling", Also, stated that ponding is not the only solution, still need some type of outletting sytem .for flood control. Motion. carried 3-2. Eder and Fraser opposed. M/S/P Morgan/Mazzara to recomnxendr encourage and insist that Valley Branch Watershed District look into storing more water on Silver Lake and in. Grant Township to slow down run-off into Lake Demontreville, Olson and ultimately Jane. Carried 5-0. --Allen Dornfold - when talking about another area, talking about a project, Cannot do anything without a project and the only way this is accomplished is through the petitioning process. ADJOURW NT: Mayor Elder adjourned the Special Emergency Meeting at 7:05.p.m. LAKE ELMO COUNCIL HEARING ON PROPOSED SEAL COAT PROGRAM, MAY 11, 1983 Mayor Eder opened the hearing at 7:17 p.m. Councillors present: Morgan, Fraser, Dunn and Mazzara Mayor Eder read the Hearing Notice that was mailed to all affected property owners, and, published in .the Washinqton County Review. He outlined the agenda format, then introduced City Engineer Larry Bohrer, who presented the proposed sealcoat program. PROGRAM_ Buhrer explained the necessity of sealcoating and the City's present sealcoat program, He noted that budgeted monies have not been able to keep up with program needs. Adequate monev is not available to do new streets within the City, and the levy limit cannot be raised to cover the costs. On the instruction of -the Council, the Enaineer developed a Feasibility Study and Financina Methods for a 6-year Sea_lcoat Program. Maps of streets in the program and the years they are planned for sealcoatina were reviewed. The proposed program was developed on the present condition of the streets and the time lapsed since they were last sealcoated. He informed the audience that the public hearing is to receive public input on the proposed program. QUESTIONS ON PROGRAM _ --Ji f obin4180 Trvin Circle N. Q. Has the condition -of all the steets been evaluated to determine whether or not sealcoatina will actually increase the life of the streets. A. Streets have been looked at in a General way- some streets are beyond sealcoatina to rejuveniate the surface and need to be over- layed. Explained overlay process - cost is 10 times that of. seal- coatina. By sealcoatina, hope to extend the life of a street and prevent premature overlay to be required. Q. By sealcoating every 5-6 years, will street deterioration be lessened that much to justify the sealcoatina costs to property owners. Will the streets last 25 years by just sealing the cracks. Maybe should leave the streets go and just overlay every 25 years. A. If no sealcoatina is done, overlay will have to -be done more often, at a much greater expense. --Tom Junqman. 8646 42nd St. N. Q. When was the last time any streets in the City were sealcoated: A. There was a $15,000 program in 1981 and a smaller program in 1982. Sealcoating has been done in the City since 1976. Q. Has a traffic survey been done - streets with more traffic would need sealcoating more. A. Weather and traffic have an effect on streets - program is based on need. Q. Do not believe streets only 5-years old need sealcoating. A. This proposed program is based on programs used by similar Cities. --Tom Armstrong, 8291 15th St. N. Q. Asked if this will be a 3-5-or 6 year program. A. 6-year is an -estimated time frame - streets would be sealcoated in 5 to 8 year interims. 5-year program is indicated because sealcoating is proposed for this year. After this year, subsequent years will be done on need which will be evaluated and monitored. If streets are initially constructed adequately they will last longer and sealcoating will extend the life. LAKE ELMO COUNCIL HEARING ON SEALCOATING, MAY 11, 1983 -2- --Loren Barber, 499.5 J'amaca Ave. N. Q. Would like a cost comparison on doing vs not doing and the effect ( on the streets for each example. (will be discussed later in meeting) --Steve Dacio, 5111 Hilltop Ave. N. Q. Asked about a road construction -standard. What type of standard was in effect when Demontreville Highlands was developed in 1978. A• in 1978, developer would have proposed a street standard which was reviewed and aT�nroved by the'City Engineer, at that time. Not aware of any written City requirements for street standards at that time. Current street standard was 'adopted in 1980. Many township roads were incorporated into the City street system when Lake Elmo and East Oakdale merged. These streets had varying degrees of pavement, and construction. Sealcoating helps prevent premature reconstruction. Streets where sealcoating would not help were not included in the program. Q. City responsibility to develop streets so seealcoatina program would not be necessary. --Resident Q. Why is it_necess_ary to sealcoat streets that are used only by the residents along that street - rather than just the streets that have continuous traffic. All construction in her development is complete - no more construction vehicles. A. Heavy traffic is not the only cause of street deterioration. Every street has a useful life - deterioration begins upon construction completion. Weather, earth movement, trash pick-up vehicles, septic pumpers, delivery vehicles, landscape vehicles, etc. all contribute to the deterioration of a street. Explained the seal - coat process. City will 'bake care of maintenance by filling cracks before sealcoating is done. G. Simon, 5885 Highlands Tr. N. Q.. Cracks larges cause of pavement breakup. Believe more benefit in increased crack filling maintenance. A. Labor intensive work.and an important part of the process. Intent is to try and keep up with the drack::_sealing as interim maintenance preservation Ben Friedrich, 11269 31st St. N. Q. Why is 34th Street to be sealcoated - has been done in the past - waste of money to sealcoat. A. Reason this was done in .the past was to respond to complaints about dust. Agrees this street needs a bituminus surface. Q. Asked why maintenance ie, seaicoating, plowing, stopped at the property line and did not into the driveway area that is dedicated r-o-w the length of the property. A. Council will have to address - no sure why this was done the way it was. FINANCING Bo r er expiained the two proposed methods - unit method and front foot method with maximum and minimum rates. Figures for assessment alternatives were outlined in the Engineer's letter of May 6, 1983. Corner lots - for the purpose of the assessment schedulelfront footage on both sides of a corner lot were figured for assessment. LAKE ELMO COUNCIL HEARING ON SEALCOATING, MAY 11, 1983 -3- FINANCING - Continued QUESTIONS James Tobin, ,A180• Irvin Ct. N. Q. Mentioned earlier that monies had been bubgeted in the past - why can't this continue - more streets, but more people living in the City and more money coming in. A. Many developments are not full, but, all the street improvements are in and are being used - many are through streets. Reitterated causes of deterioration. Filling cracks that just keep coming back defeats the purpose. A City has to weigh the cost of not filling cracks and not sealcoating against the consequences of doing nothing to the streets. Believe have to have a sealcoat/maintenance program for street lo4gevity. Filling and sealcoating reduces the amount of water that gets under the pavement and causes damage. Re crack filling - new materials continually being developed, Ben Friedrich, 11269 31st St. Q. When will an assessment determination be made? A. At assessment hearing later in the summer. Assessment hearing on the 1983 Program will be held this summer with the 1984 Program hearing held next year, etc. Tom Armstrong, 8291 15th St, N. Q. Residents in other than the 1983 Program likely will not be at this years hearing. Important that policy adopted at the 1983 hearing is adhered to for succeeding years. City has to adopt an uniform assessment policy. Recommended adopting the Unit Method, Minimum Rate which provides for 20% of the cost to be assessed to affected property owners with an 80% ad valorem tax tgeneral property tax). Because one lives on a street should not beF).required to support the street(sI when all citizens use the street(s). Real question is how to handle this program in a way that is fair to all citizens, not just those living on a City street. I' A. Method proposed would cost 2 mills total or a 2% property tax increaze per individual. The ad valorum 'tax is also deductible, Charles Graves, 5227 Jerome Ct, N. Q. Suggested a combination unit and front foot method. Does not feel it is fair that individuals with small front foot lots should have to pay a share for. individuals with larger front "rootage. Use ad valorum tax to seperate costs out. Bruce Wylie, 409-1 Irvin Circle N. Q, Appears decision is already made - is it definite this is going to be done? How were costs determined? Who else has this program? A. Council has to decide whether to adopt a sealcoat program or not. Have%�to decide by Friday whether or not the City wants to participate in the County''s Seaicoat Program - savings to the City by joining the County program, Mahtomedi adopted a program like one suggested by Tom Armstrong, Cost estimates are based on previous bids for similar work in surrounding communities. estimate is based on the City contracting the work out - savings in joining County program. Bohrer added that the City's Maintenance Budget cannot keep up with the deterioration of the streets. Ben Friedrich, 11269 31st St. 0, Difficult to decide pro or con without knowing the amount,:of the assessment. Would favor unit assessment method over front foot, but do not want to be bleed to death, LAKE ELMO PUBLIC HEARING ON SEALCOATING, MAY 11, 1983 -4- FINANCE QUESTIONS Continued Mary Ann Kl.oetzke, 2415 L&Son Ave, N. Q, Asked how much of individual property taxes go into street maintenance budget, whatdoes it go for - seen street sweeper once in five years - had. poor snow removal this year. A. About 20o goes into the maintenance budget. Bohrer outlined what street maintenance entails. Q. Opposes a Street Sealcoatina Program - not necessary in this area. John Leslie, 11546 20th St, Q. Legal question - homeowners paid entire cost of paving 20th St. understood there would be no additional assessment costs. Asked the legality of this agreement. A. Mayor Eder indicated that 3M Club paid a predetermined amount for this street with the remainder assessed on a front foot basis. Pete Durand, 11332 20th St. Q. A lot of traffic going to Tartan Park. Believes they should pay a larger share of reconstruction or maintenance costs - just finished paving for the original paving of the road. There were no problems before 3M increased the traffic. Tom Armstrong Reitterated the advantages and fairness of his proposal.. Carol Kuettner, aamaca Ct. N. Agrees with Armstrong's suggestion especially the ad valorum tax. City has a responsibility to maintain its streets. Charles Graves, 5227 Jerome Ct. N. Q. Peopl&,,with greater amcunt of frontage have greater potential use and value of their property. Again stressed have to have some form of assessment based on front footage and unit. Tom Armstrong Larger parcels will still pay a larger amount, but this can still be added to taxes through ad valorum tax. Ben Friedrich Re Corner lots - these are not an advantage - this needs to be addressed. This type of lot doe s not inhance the property value. Resident Q. Questioned area in Hidden Bay where 2-3 homes are serviced off a driveway - great inequity if they do not have to pay for improvement to the roadway up to this drive. Area was not noted on any of the proposed maps. A. This was an oversight and will be included and assessed accordingly if the program is approved. Loren Barber Q. Has a cost analysis been.done. A. No. Bohrer explained how evaluation was arrived at. Engineer Bohrer gave his credentials. He went on to explain Mn/DOT's position on up -keep of streets and highways. Mayor Eder submitted letterr• from C. W. Taylor, John Hannar Howard Sprinqborn, and Gordon,Simon, Arlyn Christ, Ron Kuehn and Kay Chevrier into the record. He then closed the public hearing at 8:40 p.m. M/S/P Fraser/Mazzara to continue the meeting for Council discussion. Carried 5-0. LAKE ELMO PUBLIC HEARING ON SEALCOAT PROGRAM -5- COUNCIL'D'ISCU'SS'I'ON Councillor Morgan - If project is ordered and the majority of the assessment is put on the ad valorem tax, it is no different than what is being done now - cost is coming out of the General Fund. Mayor Eder Prevent by law from raising the levy because we are up in the 8% levy increase. This is a way around it. Councillor Fraser - Think the approach of putting as much as possible into the ad valorem tax is the fairest approach and the most fiscally sound approach particularly because it can be an income tax deduction. Fairest because of how the streets are used. Also think it is necessary to implement this program. Streets need it and the way it has been laid out is.it..an unnecessary, superfluous program. This is no more than sound management of the things that we own. Also noted that 1100 notices were mailed to all affected property owners and less than 50 people attended the public hearing. Know that a small percentage, under 4%, of the peopole who received notice attended. Heard a number of residents who attended indicate they do not want the program; also, have a believe that the large majority of the people who chose not to attend, chose not to attend because they do not really want to object - they may not like it, but see it as a reasonable approach. Mayor Eder - regarding the question of cost return - while we do not have specific figures have other standards to parallel. Looking at the 2-3 streets that are presently beyond repair, it is very evident that non -maintenance can be a problem. Related that the street in front of his home has been sealcoated once since 1971, when it was constructed, obVionsl.y needs to be sealed to slow down and prevent noticiable signs'of deterioration. If the unit/ad valorem method is approved, consideration will have to be given to Lanes Demontreville Country Club, Tartan Park, corner lots. Councillor Mazzara - do we want this and where are we going to lean as far as taxes are concerned? Councillor Morgan - agree with Councillor Fraser - should be on a per parcel basis with the maximum put into the ad valorem tax. Councillor Dunn - agrees with Councillor Fraser, also. Advised the residents who oppose a seal coat program to look at the streets that are beyond sealcoating to see what their street could look like in 5-6 years. Thinks the program is good - should go with the unit/ad valorem method Councillor Morgan - for the Assessment Hearing the Engineer should be prepared to be very specific on the life extension provided by sealcoating. Also specifices on parcel costs. M/S/ Dunn/Fraser to adopt R-83-33, a Resolution approving the 1983 Seal Coat Program, as outlined by the Engineer. Discussion - Mayor Eder - Noted that there is a question about future of 34th Street as to whether it should be sealcoated or reconstructed. Motion carried 5-0. Engineer will prepare an assessment role based on a Unit Method, assessing 20$ to affected parcels with the 80% an ad valorem tax. M/S/P Morgan/Dunn to adjourn at 9:50 p.m. RESOLUTIONS: 83-33 - 1983 Sealcoa.ting Program We, the undersigned, object to the proposed method of raising funds for the sealcoating of city streets. We object to an assessment based on a front foot of street, as this method would tax the most those who benefit the least and tax the least those who benefit most. Theoretical Example: A corner lot owner would benefit the least as he lives at the beginning of the street and thus travels the shortest distance on the street, yet he would be taxed the most as he has streets on two sides. The cul-de-sac owner benefits the most as he must travel the full length of the street, yet would be taxed the least as his lot only has a small amount of road frontage. What we propose is a very simple equal assessment per lot in the development or along the street. We further feel that lots located in the same area yet on a county road should not be exempt from pa in their share of the c mmunity maintenance program. I�� � ,�,.�-� a--- ate, ec.�v� s Xir �l� a iiu�j►/Gu,t�. �� �c u 7,tr► '&'k �-} in, �c.� . p t�8 0 /d p 124 � �'i S/_,o%93 aj V�'Oty _5 _f57 a -A, V -zoo! e4�1 V_ se1w.- 'elf 157 I el, r5 %-vim,-,ti,.�/. -v L? 1���-CSC �Lz� �'�% d6n/Lll an, C�.1,? 0 R-83-33 RESOLUTION CITY OF LAKE ELMO WASHINGTON COUNTY, MINNESOTA A RESOLUTION ORDERING THE IMPROVEMENT KNOWN AS THE 1983 SEALCOATING PROGRAM FOR THE CITY OF LAKE ELMO AND DIRECTING THE CITY }ENGINEER TO PREPARE PLANS FOR THAT IMPROVEMENT. WIIEREAS, a Resolution of the City Council adopted April 19, 1983, fixed a date for a Council hearing on the proposed improvement known as the 1983 Sealcoating Program; and WHEREAS, ten days published notice of the hearing through two weekly publications of the required notice was given together with mailed notice to all affected property owners of the hearing; and the hearing was held thereon on the llth day of May, 1983, at which all persons desiring to be heard were given an opportunity to be heard thereon; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lake Elmo as follows: . 1. Such improvement is hereby ordered as proposed by the City Council in their. Resolution of April 19, 1983, known as R-83-29. 2. Toltz, King, Duvall, Anderson and Associates, Incorporated are hereby designated as the Engineers for this improvement.. They shall prepare plans and specifica- tions for the making of such improvement. 3. `.I'he seal.coating work shall be carried out by the Washington County contractor, after bidding, with the County Sealcoating Program. Adopted by the City Council of the City of. Lake Elmo this llth day of May, 1983. ATTEST: Laurence E. Whittaker, City Administrator Mdyna L. Eder., Mayor