HomeMy WebLinkAbout10-04-83 CCMCLAIMS TO BE APPROVED AT OCTOBER 4, 1983 LAKE ELMO COUNCIL MEETING
84148
Husting & Engstrom - Keats Avenue final pmt. $
53,225.09
84149
Verle Thompson -replace lost check (election judge 9/21/82)
26.80
84150
Laurie Waterman - St. Paul evening paper
3.70
84151
Void
-0-
84152
Washington County Treasurer = record deed
1.50
84153
State Treasurer -Social Security Fund Contribution - Sept.
2,621.86
84154
State Bank of Lake Elmo - Sept, federal wh.
2,937.40
84155
Commissioner of Revenue - Sept. State wh.
1,372.00
84156
Patrick Klaers - October expense
50.00
84157
Lake Elmo Associates Ltd. - Oct. rent
1,689.00
84158
L.M.C.I.T. Health Protection Plan = Oct, hosp.
1,137.90
841.59
Minn. Benefit Assn. - Oct. hosp.
52.00
84160
Allied Group Ins. Trust - Oct. disability & life
92.67
84161
James McNamara - September mileage
235.40
84162
Ilene Johnson - 9/20 City Council minutes $ 138.50
9/19 Parks Commission minutes 53.40
9/12 Planning Commission 96.75
288.65
84163
Mary Meyer - 9/29/83 newsletter
200.00
84164
Pegboard Accounting Controls - office supplies
156.46
84165
Washington County Treasurer - 1983 Assessor
7,835.10
84166
Washington County Treasurer - maps
52.54
84167
Lawson, Raleigh & Marshall - General $ 582.00
Prosecutions 310.00
892.00
84168
Eckberg, Lammers - Prosecutions-^
120.00
84169
Gerald Dahlberg - Sept. animal control officer
286.00
84170
Lake Elmo Hardwood Lbr. - Fire Dept. bldg. repairs
13.94
84171
North Star International - Fire Dept. truck repair
187.04
84172
Washington County Treasurer - Sealcoating
50,147.30
84173
Carlson Tractor - Maint. Dept. truck repair
27.06
84174
International Hough - appraise grader
164.34
84175
Paper Calmenson & Co. - snow plow blades
985.53
84176
Vern's GTC - Maint. dept. truck repair
56.51
84177
MacQueen Equip. Co.- Maint dept. truck repair
243.48
84178
Northwestern Bell
283.42
84179
Northern States Power Co.
952.22
84180
Water Products Co. - water dept supplies $ 31.21
Schonstedt Locator. 480.00
511.21
841.81
Twin City Testing - Water dept. - water tank 'p
ainting
287.82
84182
Allied Painting & Renovating - water tower painting final pmt.
4,207.00
84183 thru 34196 October 14th payroll 5,000.00
$-136, 342.94
LAKE ELMO CITY COUNCIL MEETING
OCTOBER 4, 1983
Mayor Eder called the meeting to order at 7:10 P.M. in the City
Hall.
COUNCILLORS PRESENT: Dunn, Mazzara, Morgan, Fraser(arrived at
7:20 p.m.). Also present City Administrator Klaers and
Consultant Whittaker.
1. AGENDA: M/S/P Dunn/Morgan to adopt the agenda as amended.
Add: 8-E Letter from Sally Johnson regarding the landfill
lawsuits, and their representation of the City.
8-F Grading of the ballfield at DeMontreville Park.
8-G Resolution thanking former employees, Kathy Crombie
and Edna Beers, for their services.
8-H Deputy Clerk Position.
(Carried 4-0)
2. MINUTES:
M/S/P Morgan/Mazzara to approve the minutes of the
September 20, 1983 City Council Meeting.
(Carried 4-0)
3. CLAIMS:
M/S/P Dunn/Morgan to approve Claims 84148 thru 84183.
(Carried 4-0)
4. PUBLIC HEARING:
A. Jane Road North (Petition for street improvement)
Pursuant to public notice, this public hearing is to consider the
;petition from the residents for a 22 foot wide street and to hear
the feasibility study prepared by the City Engineer on September
29, 1983 and presented to the City Council.
Bohrer presented the feasibility study.
Morgan - On June 21, you went thru this same exercise and my data
says you estimated the cost to be $1800.00 per lot for that 22
foot street. This is more than twice. What happened?
1
LAKE ELMO CITY COUNCIL MEETING 10-4-83 Page 2
Bohrer - In that June 21 letter, we were asked to come up with a
ballpark figure for surfacing the road. The first estimate was
just to shape up the gravel base that is there, just adding an
inch or two and surfacing the road in place. No provision for
changing the direction or collection of the drainage. It would
still continue to run along the edge of the road and erode as it
does now. There would be no realignment and very little
restoration.
Morgan - Why was the project changed?
Fraser - This is what we asked him to do.
Eder - Is there a reason why you would not have used City
Standards?
Bohrer - I think the reason was because at that time there was no
consideration whatsoever for Jane Road to being anything other
than just a deadend street. Since that time the preliminary plat
of the Meadows has been submitted making that not a deadend road
anymore, or a very good possibility of not being a deadend road
anymore. Also, public testimony taken in that series of meetings
afterwards regarding the drainage saying that drainage collecting
in the low point and running between the Weir's lot and Mr.
Krause's was something that should be eliminated if possible.
Eder - How do these rates compare to the unit prices in the most
recent bids. I realize that you have to allow for the fact that
they aren't going to be bid immediately.
Bohrer — That is the only provision; that it will be bid in 1984
instead of 1983 so it's incrementally higher than if it was
constructed in 1983, by 5% maybe.
Jim Weyer - What is the added cost associated with putting the
curbs on and realigning the road?
Bohrer - We estimated about five trees would be removed for the
realignment at an estimated cost of $750.00; Excavation of about
$4500.00 (est.);remove in -place culverts at about $300.00 (est.);
The curb $5,150.00; the storm sewer which amounts to two catch
basins, storm sewer pipe and a pipe apron at the end at about
$4400.00 (est.). The first estimate for gravel base included
just enough gravel to shape it and make a crown in the road,
where this would be a complete 6 inches of gravel. The total for
the 6 inches is about $6800.00 so I suppose $3000.00 of that
would be additional. Restoration in top soil, seeding and sodding,
approximately $6400.00. If ,you add these up, it is probably the
cost difference.
2
LAKE ELMO CITY COUNCIL MEETING 10-4-83 Page 3
Weyer - Could I assume that the cost of the original proposal was
around $20,000.00?
Bohrer - That's pretty close.
Weyer - Could I assume then, that if we were to slant the road in
one direction, the curbs would be one-half of the $5150.00 that
you quoted us. Plus the storm sewer would be about another
$4400.00. So that would bring the total up to about $27,000 --
is that correct? That is what the petition requested. That then
would be the difference between what the petition requested and
the $50,000 that you came up with.
Bohrer - Not exactly; if you are putting a curb on one side you
need to fill in the boulevards on that side and the ditches,
otherwise the water won't get to the street. The boulevards have
to run into the street. Certainly some work should be done on
the boulevards if the proposal is to get away from ditch type
drainage. So there would be some soil needed to fill in that
boulevard and seed it.
Weyer - What is the purpose of the boulevards draining into the
roads?
Bohrer - The reason to control drainage on a road is to keep it
dry and therefore, maintain its strength. When a road bed is wet
it loses its strength and any blacktop you have will crack up and
deteriorate a lot faster. There are two ways of controlling the
drainage. Either the water goes off the road in the ditches and
then runs away, or it runs into the road, is caught in a curb and
gutter and runs to a central location where it can be picked up
with a storm sewer and taken off the road. I am not recommending
that ditches be used in that road because of the erosion problem
that presently exists. A lot of soil is getting deposited on the
vacant Krause lot from the erosion that is occuring.
Weyer - I don't think anyone has recommended ditches.
Bohrer - The next alternative is to put curb on. If you use a
curb you have to get the water to the street. That means the
ditches that presently exist and the wash will have to be filled
in.
Eder - When we are speaking of $20,000 that you originally
prepared, that didn't include contingencies, administration,
engineg, etc.?
Bohrer
- Yes
it
did.
Morgan
- I
just
can't understand this. With 32 foot standard
3
LAKE ELMO CITY COUNCIL MEETING 10-4-83 Page 4
road on June 21, was $37,500, now a 22 foot road is $39,500. The
smaller we make the road, the higher the cost.
Bohrer - You have to realize that this June 21 letter was put
together with very little information. We were given the task of
for $200.00, putting together our best shot at this time. Don't
do any field work, don't do any measurements, just use a scale on
a map and give us the best shot. The reason for giving out these
figures is for the property owners to decide if they wanted to
submit a petition or take it any further.
Fraser - I recall the Council requesting that rough estimate and
was in that nature that we requested it. We put a lot of
Pressure on not to do much work and I am distressed by the
implications that the engineer is providing erroneous figures. I
think that is not correct and I think the implication is poor.
Morgan - I am not implying that at all. It takes so much
bituminous material to build a road. That doesn't change. That
is a volume figure.
Weyer In regard to the original proposal of June 21, is that
still an acceptable number for that road as proposed.
Bohrer - Yes, I think that is pretty close.
Weyer - The petition was for approximately $20,000 and then we
assume that the improvements based on what we requested; slanted
in one direction, putting the curb on and catch basin, would
bring it up to $27,000. We felt that would be a reasonable
compromise which would satisfy the needs of both the homeowners
and the City. The needs of the City, we had felt, were that
regarding the safety of the residents in the locality which it
serves in terms of fire protection. It would also serve the
needs of the homeowners in such a way that it would blend in with
the 22 foot wide road that is currently there on Jane Road North.
Also minimize the water runoff going into Lake Jane and also
minimize the cost. What we have heard here is substantially
different than what the homeowners have requested. If given the
choice between the $52,200 proposal as submitted by the engineer
versus the $20,000 proposal without any provisions for drainage
or anything, I certainly would be much more in favor of the
$20,000 proposal.
Wyn John - If you now estimate the full 32 foot wide road, is
that subject to a simular escalation because we didn't have time
to prepare the estimate in the first place or does that stay at
approximately where it is?
Bohrer - The estimate for the 32 foot wide road was prepared for
Council consideration back in August and I would think that is
still applicable. That was done after viewing the site, after
4
LAKE ELMO CITY COUNCIL MEETING 10-4-83 Page 5
consideration of the drainage issues.
Weyer - Assuming that this does not pass this evening, what do
the homeowners do then, go back and submit another petition for
the exact original proposal so we can keep control of these
costs?
Eder - I suspect, based on the fact there are not too many
residents here, that there is a possibility if people knew what
was in this proposal they would prefer to comment on it. I would
think the discussion be deferred and people should have a chance
to read this over and think about it and come back with questions
or what should happen.
Closed hearing at 7:50 p.m.
Fraser - I would like to proceed with whatever discussion
Council members wish to make.
Dunn - This should serve as a basis for negotiating and at least
questioning what the engineer has proposed and modifying from
there. You have to keep in mind that we have to look out for the
City's interest. If we get something that is substandard for
maintenance standpoint we are going to be over there every year
bringing in rock, whatever, to correct erosion.
Fraser - There has been discussion at various times and I sense
about three different approaches, one being when we asked the
engineer to look at it in a very preliminary way. I judge that
to be completely inadequate type of improvement. There is also
the petition that the property owners presented which the Council
asked the engineer to use as a basis for what he has come up
with. I don't think I could go along with either of these so I
think the consideration will rest between the 22 foot as
presented here tonight or the 32 foot road presented earlier.
Given that, with a difference per lot of only $280.00 I think it
would make good sense to go with the road that meets the City
standards. I would not vote for the 22 foot road based on the
material which I have at hand, and I certainly cannot imagine
going at some future time for a smaller road. I think the action
will be no action or proceeding at a time when a road up to City
standards can be built.
Mazzara - I can certainly sympathize with the homeowners out at
Lake Jane for the difference in $20,000 to $52,000 but
:realistically, what we asked Larry to do was to tie up all the
loose ends as far as erosion, water, etc., and although it is
probably a lot higher than I thought it was going to be, that's
our two choices, I think either the 22 foot or 32 foot road in
there.
M/S/P (Morgan/Mazzara) to table the matter until the next
meeting. (Carried 5-0)
5
LAKE ELMO CITY COUNCIL MEETING 10-4-83 Page 6
B. Castle Design (Variance and shoreland permit) Hill Trail No.
(Ken Gervais - Lots 228,229,230,231,232 and the NEly
1/2 of vacated West Shore Drive adjoining Lot 228, all
in Lanes Demontreville Country Club.
Pursuant to public notice, this public hearing is to consider the
petition from Castle Design for variances and shoreland permit.
The request involves at least two variances. Variance from lot
size and variance for structure set back from the water. The
engineer has stated that he does not believe that a variance can
be given from the drainfield setback from the water.
Bohrer - I have researched that a little further with the DNR
and they have stated that in the State Shoreland Regulation a
variance can be given to that set back on a sub -standard pre-
existing lot, which seems to fit into this catagory.
Eder - At one time this had to be a common ownership lot. Would
someone from Castle Design give us some history on the
acquisition of this lot?
Ken Gervais - The lot was purchased in 1979. The lot was
apparently part of another parcel. The person that owned it was
transferred and got a lot -split and sold the house off and made
this into two lots. I came in 1979 and asked the City if it was
a buildable lot as it stands and I was told yes by your building
inspector. This property was in an individual ownership. I did
not buy it from the gentleman next door, I bought it from a
person in Beaumont, Texas. It was in one ownership, by itself.
Eder - It is a very marginal piece of land. I think we have
taken a position where we didn't want trenches located inside of
other trenches in the future. That being a secondary drainfield.
The amount of land above water is probably less than 1/4 acre or
maybe 3/10 of an acre.
Discussion on shoreland set back. There is a conflict between
ordinances. The zoning district says 30 feet and the shoreland
says 20 feet. Mayor Eder instructed the City Administrator to
have this conflict corrected.
Morgan - What is the average lot size in the area?
Whittaker - 26,800 square feet.
Eder - I am personally in favor of the City doing research on
these transfer titles. These are the kinds of things we were
am
LAKE ELMO CITY COUNCIL MEETING 10-4-83 Page 7
hoping to prevent over the last twenty years. I don't know how
this slipped thru the cracks, how it got divided. There has been
a minimum of an acre for back at least to the early 701s. All of
these deeds must be signed or initialed by the City Administrator
or City official.
Whittaker - Not if they are platted property or parcels of
record.
Eder - Maybe interpretation changes over time. We had problems
with that in 1974 and 1975 and we laid down the law and said that
anything less than an acre you must send it out here.
Whittaker - I don't think they have been doing it.
Morgan - Would you clarify the rule again. Obviously it doesn't
make the 1-1/2 acres, then it must meet the average of the lot
sizes in the vicinity.
Whittaker - The ordinance says 60% of 1-1/2 acres which is about
39000 square feet. We had so many parcels in Lane's DeMontreville
that didn't meet that 60% rule, the Council set up a policy
saying that if they had the average of the other built on lots in
the subdivision which is that 261800 square feet, then they would
consider the variance.
Eder - Is there a reason this application was made in June and we
are just getting it now.
Bohrer - There was a preliminary review and a letter sent out in
July stating that different information was needed; (1) Show the
location of the proposed septic tank and pump station within set
backs; (2) Set backs of drainfield area to water is 75 feet from
high flood; (3) drainfield must be designed to accomodate 600
gallons per day. I also stated that every home in Lake Elmo is
assumed to have a garbage disposal for sizing drainfields. I
pointed out the lot size and the variance for the structure set
back that would be required.
Eder - I guess the problem that I have is that after someone
has invested some money this has to be disappointing.
M/S/P (Fraser/Mazzara Move to deny request for Shoreland Permit
and deny variance for lot size and structure setback from the
water.
Fraser - The reason I move to deny is that I think there are too
many variances required and that each of them requires too great
a variance. Lot size, you are looking at 1-1/2 acres and we
have either .39 or .52. With setback from the water, feet.With
the drainfield, 75 is required but 65 is possible. The
oil'
C 7
0
LAKE ELMO CITY COUNCIL MEETING 10-4-83 Page 8
drainfield is to be fitted between existing trenches which we
have discouraged in the past and which even the DNR is
questioning. So I think the number of variances and the extent
of them is excessive.
Mazzara - I agree with this. I just can't see putting another
problem in that area.
(Motion Carried 5-0)
Gervais - I guess we should takeup the drainage problem next.
The storm drainage that is running into my lot without any
easements. You have your storm system picking up catch basins
and right into the center of the lot which is eroding and we are
picking up practically all of the gravel in the whole
neighborhood. There is no easement to dump storm sewers into my
lot.
Mayor Eder suggested that Mr. Gervais taie the matter up with the
City Administrator.
5. Engineer's Report:
A. Construction Plans for Teal Pass Estates
(Formerly Lake Jane Estates)
Bohrer stated that he had reviewed the construction plans,
specifications, proposal documents, grading and erosion plans,
and recommended items to be added or clarified. Stated he had
also estimated the escrow bond or letter of credit for the
improvements to be constructed next spring, following the
completion of the grading and gravel base that they would like to
do this fall prior to the final plat signing. That estimate is
$16,500.
Dennis Peck stated that not only did they want to install certain
improvements this fall but they also wanted to build one home .'
His proposal for the Council's consideration is to immediately
post a cash bond in a sum to be determined which would be
sufficient to take care of the improvements this year and escrow
for the bulk of the improvements for next year. He stated that
there is approximately $31,000 to $32,000 total construction
costs that is not including the extra 25% for escrows. What we
would like to have the Council consider is bonding immediately
for all those items except the overflow pipe and the overflow
easement. We would like to address those as a separate issue.
That would mean that we would bond about $25,000 plus the 25% for
cash escrow to the City as soon as we could work out the details
with the development contractor. We would then like permission
to start one home. The City then would have the insurances that
the work would be done this fall, if not you would certainly have
the escrow required to get this done in the sring.
LAKE ELMO CITY COUNCIL MEETING 10-4--83 Page 9
Discussion on the inspection procedures. Bohrer explained
that resident inspection meant someone was placed at the site and
observes the construction as it takes place. The City provides a
spot inspection to make sure it conforms to plans and
specifications but it is up to the developer to take care of it
on a day to day basis.
Peck - The items we would like to delete would be the 18" RCP,
the 18" RCP apron and the outlet structure. Those are items we
know need to be constructed but they are also items that hinge
upon us obtaining an easement to bring it across to Lake Jane.
At this point we may or may not need the City's help in obtaining
the easement. If we simply build one home and at the same time
do all of the grading and excavation of ponds the overflow, the
drainage system would be substantially better than it ever has
been, even without an outlet structure at this time. What we
would like to do is be able to have time to work out whatever
easement arrangements are necessary and put the outlet structure
in next year and have the City accept this is good faith that if
we deposit $30,000 in funds, we would be responsible enough to
complete the rest of the work next year. All of the work would
be completed by July 1, 1984.
Bohrer stated that the pipes would not be critical for just a
single home.
Eder - But we would be approving the final plat in order for that
house to get in there.
Bohrer - Yes. The three lots within Teal Pass Estates.
Eder - But all of this could be worked out in the wording in the
development agreement.
Bohrer - There may be an issue in terms of whether once you have
approved a plat, what kind of restrictions you can put in
building permits, but we don't believe that will be a problem.
Bohrer - What I would have to do is take the bid proposal, and I
would have to perform an estimate on it, deleting this 18"
concrete pipe and control structure.
Folz - We will send this out for bids probably Thursday (10-13-
83) and prior to your next Council meeting before the
development agreement could be signed, we would have a contract
and know exactly what the costs are.
Bohrer - What we are asking is for the Council to give some
direction to the City Engineer, the City Manager and the City
Attorney that the matters we are discussing,ie: not having to
bond for the one improvement, placing a cash escrow with the
9
LAKE ELMO CITY COUNCIL MEETING 10-4-83
Page 10
City, being able then to take out one building permit at the time
that the final plat is approved, that it is something the Council
has considered and deems acceptable.
Eder - I don't have a problem if it sets out the criteria that
says the culvert is go or no go because of this so that we don't
have any misunderstanding.
M/S/P (Morgan/Mazzara) To move approval of the ammended plans as
specified by the City Engineer.
(Carried 5-0)
M/S/P (Morgan/Mazzara) To instruct the City Administrator to
work out the development agreement.
(Carried 5-0)
M/S/P (Morgan/Mazzara) To adopt Resolution 83-62 approving the
final plat with the contingencies and subject to a development
agreement for Teal Pass Estates.
(Carried 5-0)
Suggestion to include in these minutes that Teal Pass Estates was
formerly known as Lake Jane Estates.
Discussion on the park dedication fees.
B. Grading Permit for St. Paul Suburban Bus Company:
Discussion and review of letter sent to Council by Larry Bohrer.
The lot is being relocated because of the frontage road
construction. They propose to relocate and upgrade their
facilities into the SE corner of their property, north of the new
frontage road. This falls under the Building Code, Section 502.
The whole parcel is zoned GB so no zoning change is needed. No
wetlands or low areas would be filled. No storm water storage is
taken up by doing this grading.They have proposed to construct a
pond with an outlet culvert and both the pond and the outlet do
meet the City's requirements. One recommendation by engineer is
that inlet end of this outlet culvert be staked with hay bales to
prevent sediment from entering the frontage road ditch. The
actual driveway on to the frontage road will require a driveway
permit from the Transportation Department.
Eder - Why did they choose the most choice lot to put the metal
building on?
Folz - I am not sure it is going to be metal. The architect is
looking at it right now and all of Regan's other bus storage
buildings are concrete block buildings. But they have not made
10
LAKE ELMO CITY COUNCIL MEETING 10-4-83 Page 11
the final decision as to whether or not it will be metal or
concrete block.
Eder - I am really concerned that now they are going from step A
to step B. I don't want them to end up detracting from their
availability to attract good business' adjacent to their
property.
Folz - We did a Concept Plan Design before we got this far to try
to look at the land use. He chose to be in the SE corner of
this site because he felt the drive-in theatre is not the most
desirable thing to put some other business next to, and he felt a
bus storage site would be a good buffer from the drive-in theatre.
He also wanted to get some exposure on the highway for his
buses. There is also, in the SE corner of this property, a
natural gas pumping station and there is a relief valve in there
so from that standpoint he thought this would be the best
location.
Folz - One other comment: I had a call from Nels Nelson of
Valley Branch, and after review said there was no problem, that it
met all requirements, but then called later and said there was
one minor problem. That is, there will be bus storage units in
here and the potential that one of the buses could have a fuel
leak and fuel could go into this pond is a concern to the water
safety so, therefore, they are asking that we put a structure on
the outside which would actually be a device to stop the
potential oil from going out. They are asking for a skimmer to
be put in there.
M/S/P (Morgan/Mazzara) To approve the grading permit as
suggested by the engineer and amended by the Watershed District.
(Carried 5-0)
C: Engineering Agreement - 201 Sewer Project
Larry Bohrer discussed sample letter he suggested be sent to the
EPA, thru the the MPCA, asking to take a certain number of failing
septic systems ahead of schedule, out of sequence. We would
recommend the stepping -up of the five individual on -site septic
systems. To define 'stepping up' Bohrer responded by saying that
it would take approximately six months to prepare the plans and
specifications, the EPA says to allow six months for review, so
we are looking at a 1985 construction. Five people have
contacted us and said they could not wait and asked if there was
anything we could do to speed up the process. The rules and
regulations do allow certain work items to be exempt from the
normal procedures. We would like to submit this letter and get
approval and do it this fall.
11
LAKE ELMO CITY COUNCIL MEETING 10-4-83 Page 12
Discussion on the criteria for determining who has priority with
this assistance.
M/S/P (Dunn/Morgan) To send a letter to the Environmental
Protection Agency thru the Minnesota Polution Control Agency
asking to take a certain number of failing septic systems ahead
of schedule.
(Motion Carried 5-0)
Larry Bohrer stated that we are not receiving a grant for the
$103,000 that is proposed to be the cost of the design of Step 2
work. Instead of the grant, they have developed a chart that
gives an allowance for Step 2 work. He estimates between $30,000
and $33,000 of this will be eligible for that allowance. It is
given to the City in two halves, half of that $30,000 to $33,000
is given to the City when the design is 50% over and the. other
half is received by the City when the plans and specifications
are complete. The City does need to address how to handle the
interim financing of about $70,000.
Eder - I think we should ask the County for some money since they
gave some to all the rest of them.
Whittaker - What we will have to do is use the Council
Contingency Fund until we collect these back assessments which
means it will leave us with less of a margin of safety. But the
alternatives are bonding, or something like that, which will cost
us more money.
Eder - What we need is a proposal where our City Administrator
is working with the engineer as to how we are going to finance
this, how much we are going to charge the property owners, and
have it back in here on the 18th. I don't think any resident of
Lake Elmo should have to foot any of this bill at all.
Fraser - I agree with working it out but, I would say not to rule
out a consideration for some sort of pre -payment by the resident.
If that doesn't seem feasible as you work on it, drop it, but put
it into the initial thinking, at least as an option for those
that want it.
M/S/P (Dunn/Mazzara) Motion to have City Administrator come to
the City Council on the 18th of October with all of the
suggestions,ie: bonding, take it out of reserves, what the
interest rate that we will accrue. In effect, deferring the
agreement until the next meeting.
(Motion carried 5-0)
12
4),
LAKE ELMO CITY'COUNCIL MELTING 10-4--83
Page 13
D. Steve Pott 'Large Lot Subdivision:
M/S/P (Dunn/Mazzara) Move to adopt
( the large plot subdivision with the
Street, $175 00 per lot park dedication
the CSAH-17 .right of way.
(Motion Carried 5-0)
Resolution 83-63 granting
road dedication on 43rd
:Pee, and clarification of
E. Reid Park and Jamaca Court Improvements:
Both improvements were scheduled to be done by October 1, 1983.
Mogren Brothers, the contractor for Reid Park has not submitted a
request for an extension of time. Ashbach Construction has
submitted a requst for an extension of time until October 10,
1983 and estimate three day construction time for. the Jamaca.
Court improvements.
Discussion on why the improvements were not done on time, and
discussion on penalty clauses being added for work not done on
time.
M/S/P (Fraser/Morgan) To accept the extension requsted by
Ashbach Construction until October 10, 1983.
(Motion Carried 5-0)
M/S/P (Eder/Morgan) To acknowledge to Mogren Construction that
the work would not be done by the due date and a letter of
understanding be sent; by the Engineer to make sure that the seed
is guaranteed to grow or contractor defers it until next year and
contractor takes any risks involved because of erosion.
(Motion Carried 5--0)
F. Tartan Meadows Development Agreement (Willard Morton)
Mr. Morton explained his proposal as: to put the road in Leward
Avenue 750 feet and put in certain erosion control devices. His
first requst would be a grading permit. The road construction is
a separate issue from the approval of the partial plat. He would
like to put the road in and show lots and sense the strength of
demand and given there is a demand, ask for the filing of the
partial plat.
Bohrer - If Mr. Morton is not asking for final plat signatures
and recording, he cannot sell lots, 'and he can do those
improvements without a developers bond.
M/S/P (Morgan/Fraser) To accept proposed grading plan that was
in original specifications up to that point. We will develop
13
LAKE ELMO CITY COUNCIL MEETING 10-4-83 Page 14
bond amount for all remaining improvements in what will be this
first addition.
(Motion Carried 5-0)
Break 9:25 to 9:30
.. Mining Permits:
1. Schafer Construction
M/S/P (Dunn/Morgan) To renew the mining permit, with the same
conditions as previously set forth, for one year.
(Motion Carried 5-0)
2. Hammes Mining Permit
M/S/P (Mazzara/Dunn) To defer action on the Mining Permit until
October 18, 1983.
(Motion Carried 5-0)
Fraser stated that she would not aprove one extension after
another unls code violations on the property are resolved.
7. Councils Reports:
A. Appointment of Jim Weyer to the VBWD Citizens Advisory
Committee.
M/S/P (Morgan/Dunn) To appoint Jim Weyer to the VBWD Citizens
Advisory Committee.
(Motion Carried 5-0)
B. Rock and Plaque in Sunfish Park for 125 year
Anniversary.
M/S/P (Mazzara/Morgan) To give permission for a memorial rock
in Sunfish Park for 125th year anniversary.
(Motion Carried 4-0 with Eder abstaining)
8. Administrator's Report:
A. 1984 City Budget
14
LAKE ELMO CITY COUNCIL MEETING 10-4-83 Page 15
Discussion of the budget, its increases, including the
sealcoating and additional levy for lost state aids.
M/S/P (Fraser/Mazzara) To adopt Resolution 83-64, adopting the
1984 budget and setting the tax levy for 1984.
(Motion carried 5-0)
B. Good Citizen Award to Lake Elmo Jaycees (as
recommended by Park Commission for work
effort in City Parks)
Consensus was to clarify what the Park Commission wanted at their
meeting on October 17, 1983.
C. Reimbursement from Washington County for funds spent
installing water at the fire station for landfill
area residents.
M/S/P (Morgan/Mazzara) Motion for City Administrator to requst
from the Washington County Board of Commissioners reimbursement
of $326.88 for funds spent installing water at the fire station
for landfill area residents.
(Motion carried 4-0)
D. Replacement for Paul Ryberg - Planning Commission
M/S/P (Morgan/Mazzara) Motion to move second alternate to first
alternate position and advertise for the second alternate
position.
(Motion passed 4-0)
Paul Ryberg was the second alternate so no change is needed at
this time.
E. Sally Johnson; Landfill Lawsuits
M/S/P (Dunn/Morgan) To give our formal consent to this dual
representation and ask that Mr. Klaers communicate that conscent
to Sally Johnson.
(Motion Carried 5-0)
15
LAKE ELMO CITY COUNCIL MEETING 10-4-83 Page 16
F. Grading Ballfield: Request from Jim Yarusso to get the
ballfield graded before fall.
Consensus was to determine if this is a reasonable thing to do at
this time of year and to gather the recommendations from the
Parks Commission meeting on October 17, 1983. If they
formalize what they want done, it will be added to the agenda on
the 18th of October.
G. Resolutions for former employees:
M/S/P (Morgan/Mazzara) To adopt Resolution 83-65, a Resolution
of appreciation to Edna Beers.
(Carried 5-0)
M/S/P (Morgan/Mazzara) To adopt Resolution 83-66, a Resolution
of appreciation to Kathy Crombie.
(Carried 5-0)
M/S/P (Eder/Morgan) Motion that the City Administration acquire
some type of gift for Edna Beers in an amount not to exceed
$50.00.
(Carried 5-0)
H. Deputy Clerk Position:
Consensus was to authorize administration to seek the best
solution to filling the Deputy Clerk position, providing the
salary ranges stay within the budgeted amount.
Meeting adjourned at 10:10
Resolution 83-62 Final plat for Teal Pass Estates
Resolution 83-63 Steve Pott Large Lot Subdivision
Resolution 83-64 Adopt 1984 Budget and Set Tax Levy
Resolution 83-65 Resolution of appreciation, Edna Beers
Resolution 83-66 Resolution of appreciation, Kathy Crombie
10
W
R83-66
RESOLUTION
CITY OF LAKE ELMO
WASHINGTON COUNTY, MINNESOTA
A RESOLUTION THANKING KATHY CROMBIE FOR HER SERVICE TO THE
ADMINISTRATOR FOR THE CITY OF LAKE ELMO
WHEREAS, Kathy Crombie washired as a temporary
Secretary to the Planning Commission in March, 1978; arid,
WHEREAS, Kathy Crombie assumed the duties of Secretary
to the Administrator in February, 1979; and,
WHEREAS, Kathy Crombie resigned from that position
effective September 1, 1983, and subsequently agreed to serve as
Deputy Clerk and Senior Secretary effective October 1, 1.983; and,
WHEREAS, Kathy Crombie was an efficient, thorough,
( pleasant and highly competent employee throughout her years of
service to the Planning Commission, City Council, and City
Administrator; and,
WHEREAS, Kathy Crombie will be assuming a different,
more public, but less visable position as Deputy Clerk and will
be missed at Council and Planning Commission meetings;
NOW, THEREFORE, BE IT RESOLVED, by the City Council of
the City of Lake Elmo, Washington County, Minnesota,
THAT, Kathy Crombie is hereby offered the thanks and
appreciation of the Planning Commission for her service to them
as Secretary; and,
THAT, Kathy Crombie is hereby offered the thanks and
appreciation of the City Council, the citizens, and the staff of
the City of Lake Elmo for her service as Secretary to the
Administrator and their best wishes in her new position as Deputy
Clerk.
ADOPTED this the 4thday of October, 1.983, by the City
Council of the City of Lake Elmo.
Attest:
Laurence E. Whittaker
City Administrator
SIGNED:
Mayna qc L. Eder, Mayor
SIGNED: act-,
Nancly Pr i e, Chairperson
a
A
FOR HE
WHEREAS, E
a part-time cleric
R83-65
RESOLUTION
CITY OF LAKE ELMO
NGTON COUNTY, MINNESOTA
ESOLUTION OF APPRECIATION TO
EDNA BEERS
SERVICE TO THE CITY OF LAKE ELMO
a Beers was hired in April, 1970,
assistant to the City Clerk; and,
to serve as
WHEREAS, Edna Beers 'went on to become the full-time
Deputy Clerk and Senior Secretary for the City of Lake Elmo; and,
WHEREAS, Edna Beers retired from that full-time position
in September, 1983;land,
WHEREAS, E. na Beers was a dedicated, conscientious, and
invaluable employeelthroughout those years of service; and,
WHEREAS, Edna Beers will be greatly missed by the other
employees, the citizens and the City Council of Lake Elmo;
NOW, THEREFORE, BE IT RESOLVED, by the City Council of
the City of Lake Elmo, Washington County, Minnesota,
THAT, Edna Beers is hereby thanked for her fine and
faithful service to the City of Lake Elmo from April, 1970 to
-f September, 1983; and,
THAT, the City Council hereby offers its appreciation and
thanks to Edna Beers on behalf of the citizens of Lake Elmo;
THAT, Edna Beers is hereby wished the best of everything
in her retirement.
ADOPTED, this the 4t.hday of October, 1983, by the City
Council. of the City of Lake Elmo.
a
SIGNED:
Maynara L. Eder, Mayor
ATTEST:
Laurence E. Whittaker
City', Administrator
a
k
R83-64
RESOLUTION
CITY 01' LAKE ELMO
WASHINGTON COUNTY, MINNESOTA
A RESOLUTION ADOPTING BUDGET FOR 1984 AND LEVYING TAXES FOR 1984
WHEREAS, the City Council of the City of Lake Elmo has heretofore
considered and has adopted a budget setting forth in detail complete finan-
cial plans of the City for the year 1984; and
WHEREAS, the City Clerk/Treasurer (City Administrator) at directi
of ,the City Council has computed the amount of taxes necessary and
within statutory limits which must be levied and collected during the
year 1984 in order to provide the budgeted funds; and
WHEREAS, the City Council of the City of Lake Elmo has considered
the said proposed levy and determined the same to be necessary in the
public interest;
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City
of Lake Elmo that the attached budget is hereby adopted and approved as
the budget for the City of Lake Elmo during the year 1984, and the sum_
of $321,224 is hereby levied in order to provide the City with the funds
required by said budget and that the sum of $67,000, General Obligation
Street Improvement Bond, and $80,000, General Obligation Park Bond, and
$33,574, Equipment Certificate, also be levied for 1984 Bonded
Indebtedness.
BE IT FURTHER RESOLVED, that the Clerk/Treasurer (City Adminis-
trator) is hereby directed to certify a copy of this resolution to the
County Auditor in accordance with law.
Adopted by the City Council this 4th day of October, 1983.
SIGNED:
Maynlyd L. Eder, Mayor
ATTEST:
Patrick D. K al ers
City Administrator
R-83-63
RESOLUTION
CITY OF LAKE ELMO
WASHINGTON COUNTY, MINNESOTA
A RESOLUTION APPROVING A LARGE LOT SUBDIVISION FOR
STEVE POTT AND JED WEIR.
WHEREAS, Mr. Steve POtt and Mr. Jed Weir own certain land
in the City of Lake Elmo, .legally described as follows, to -wit:
PARCEL "A"
All that part of the West Half of the East Half of
the Southeast Quarter of Section 11, Township 29
( North, Range 21 West, City of Lake Elmo, Washington
County, Minnesota, lying south of the centerline of-
43rd Street North and lying north of the south 660.00
feet of said West Half of the East Half of the South-
east Quarter. This parcel contains 17.150 acres, more
or less, and is subject to the right of way of 43rd
Street North.
PARCEL "B"
All. that part of the East Half of the East half of
the Southeast Quarter of Section 11, Township 29
North, Range 21 West, City of Lake Elmo, Washington
County, Minnesota, lying south of the centerline of
43rd Street North and lying north of the south 660.00
feet of said East Half of the East Half of the Southeast
Quarter. This parcel contains 17.232 acres, more or
less, and is subject to the right of way of 43rd Street
North and the right of way of Lake Elmo Avenue North
(also known as C.S.A.H 17).
WHEREAS, the said Steve Pott. and Jed Weier have made application
to the City of Lake Elmo, to have the above -described parcels
approved by the City of Lake Elmo as legally subdivided parcels;
WIiEREAS, at the time of said application, the above -described
parcels were not separately described parcels of record;
N
WHEREAS, the City of Lake Elmo Planning Commission considered
this application and recommended approval of same at its meeting
of September 26, 1983.
NOW, THEREFORE, BE IT RESOLVED, by ,the City Council of the
City of Lake Elmo, as follows, to -wit:''
1. The application of Steve,..Pott and Jed Weier for a
large lot subdivision of the above -described parcels, be, and
the same hereby is granted,'sUbject to the following conditions:
A. The applicants shall pay a park dedication fee of
of $175.00.
B. The applicants shall clarify for the City, a precise
"location of the right of way for C.S.A.H. 17, which
abutter the above -described parcels.
( C. The appl.icants.shall thereafter issue a deed to the
City to dedicate the required right of way for
43rd Street, which abutts the above -described parcels.
2. The City,as part of the approval for this large lot
subdivision, hereby also grants to the applicants a variance
from the City requirement for the submission of a topographic
map of the above --described parcels showing two -foot contour
lines.. The City also grants to the applicants a variance from
the City .requirement for submitting percolation tests or soil
boarings to determine the suitability of an on -sight sewage
disposal system. These variances were granted because the Council
determined the contours were not needed in this case, and that
the soil suitability for an on -sight sewage disposal system
would be determinedwhen a building permit is applied for, for
.one of the above -described parcels.
Adopted by the City Council of the City of Lake Elmo, this
4th day of October, 1983.
Maynard Eder, Mayor
ATTEST:
Patrick Klaers, City.Administrator
-2-
R-83-62
ORA
RESOLUTION
CITY OF LAKE ELMO -
WASHINGTON COUNTY, MINNESOTA
A RESOLUTION APPROVING THE FINAL PLAT FOR TEAL PASS
ESTATES.
WHEREAS, the City Council of the City of Lake Elmo has
previously considered and approved the preliminary plat of
Teal Pass Estates; and
WIiEREAS, the applicants have now presented to the City a
final plat which conforms to the approved preliminary plat and
meets with the requirements of the City Subdivision Ordinance;
a
NOW, THEREFORE, HE IT RESOLVED, that the City Council does
hereby approve and accept the final plat of Teal Pass Estates,
as is on file with the City Clerk, subject to the following
condition:
1st
1. The applicants shall enter into a Development Agreement
as required by the City Subdivision Ordinance, providing
for the construction of all streets and related improve-
ments to City standards. The developers performance of
said Development Agreement shall be secured by security
bond, cash deposit, or letter of credit in a form
approved by the City Attorney, or such other security
as may be hereafter approved by the City Council. The
amount of said bond shall be determined by the City
Engineer in accordance with the provisions of the
Subdivision Ordinance.
Adopted by the City Council of the City of Lake Elmo this
day of November , 1.983.
ATTEST:
Patrick D. Klaers, City _
Administrator
Maynard7�,Z Eder, Mayor