Loading...
HomeMy WebLinkAbout05-21-85 CCMll LAKE ELMO CITY COUNCIL MINUTES May 21, 1985 Mayor Morgan called the meeting to order at 7:05`in the council chambers. Present: Armstrong, Christ, Dunn, Mazzara, City Adminâ–şstrator Kla.ers, City Engineer Bohrer, and City Attorney Knaak. Mayor Morgan acknowledged Jay Gilbertson who was attending the council meeting in order to help earn his Citizenship Merit Badge for Boy' Scout 'Troop Number 162. 1. Agenda M/S/P Dunn/Mazzara - To approve the agenda for the May 21, 1985 City Council meeting as amended. Add: 5G1 - Update of the Castle Design situation; 5G2 - Discussion on some street patching needed on a larger scale and the speed limit on 20th Street; 6A - Guidelines for Petitions; 6B - June 18th Council Meeting;-7A - House Moving Application for Larry Gray; 7B - Boarding Care Home Presentation. (Motion carried 5-0) 2. Minutes M/S/P Dunn/Mazzara - To table the minutes of the May 7, 1985 City Council meeting. (Motion carried 5-0). 3. Claims M/S/P Dunn/Armstrong - To approve claims 86108 thru 86142 as presented.(Motion carried 5-0). 4. Planning Commission Report A. Presentation: Mike Robinson, Mn/DOT District Traffic Engineer discussed traffic and safety concerns along Highway 5 near CSAH 17 intersection. The Mn/DOT study came up with three options: A school speed zone - which could legally be 20 m.p.h. and only effective during the time children are present. Mn/DOT would have to make an engineering study to deterime what they feel would be a reasonable speed to expect drivers to slow down to. The sign for that would be yellow with SCHOOL in black letters and a normal speed limit sign with the lower speed limit on it, and a sign below that states "When Children are Present". Studies in the early 1970's have indicated that the reduced speed zone will not change driver behavior significantly. Advanced Warning Flasher - There are two types: A flasher attached with the reduced speed limit signor a warning flasher by the pedestrian crosswalk. Basic intent is to draw motorist's attention to the sign control device. The flasher would only be activated during LAKE ELMO CITY COUNCIL MINUTES 5-21-85 Page 2 the times you would expect children to be there and a legal speed zone only when children are there. l Estimated cost for one flasher is $5,000. Assuming you put flashers in both directions the estimated total cost is $8,000. Half would be equipment that Mn/DOT could supply and the other half is city construction costs. The ongoing cost would not be expensive, but power costs would be $200 a year. The state will participate in the cost if a warrant is met. In case of flashers there are four different warrants that have to be met. One of which is a school crossing warrant. Basically, the warrant is meT if there are 500 vehicles an hour on the highway at the normal time of the crossing. The flasher warrant is met in this case. Based on that, Mn/DOT would be willing to participate in some cost split with the city for the flasher. If Mn/DOT has the equipment on stock, they might agree to supply the equipment and have the city have an electrical contractor do the installation. The ongoing costs and maintenance would be the responsibility of the city. This would not be completed until school convenes in the fall. The flasher would have a time clock built into it so it would only be flashing during the times when the children are expected to be using the crossing. Mn/DOT would like the city or the school district to have control of the time clock. The question was asked by Mike Mazzara if school districts ever participated in the cost and Robinson was not aware that they had, but thought the city could pursue this. Mn/DOT's position is that the most important control measure at that crossing is an adult crossing guard. Primarily, this would provide the safest crossing for the children.. Nancy Prince brought up that her concern was not for the authorized school crossing times at 8:15 and 2:30 when there was school staff available, but what happens when children want to cross at times when there is no school staff there. Nancy requested that someone stay for a longer period of time, but the school doesn't feel it's necessary. Flashing Beacon - If the city wants to pay for it, there could be a flashing beacon above intersection of West Junction County 17. It would be flashing yellow for Highway 5 and red for County 17. It would be flashing continuiously and the power cost would be $100 a year. The beacon has proved to have not much of an affect on accidents. Accident data provided by Mr. Robinson indicated that the last Junction (by Lake Elmo Ave.) averages 3 accidents a year which averages out to 1 accident per million vehicles that use this intersection. The west junction (by the school) averages 4 accidents per year, which averages out to 1.4 accidents per million vehicles. Mn/DOT sees no pattern with the accidents that do occur. In 1981 a traffic volume study indicated that the technical warrant for a traffic control signal was met at the last junction of county L road 17 and CSAH5, but it was Mn/DOT'S opinion at the time that the traffic control signals were justified. The cost for the signal itself LAKE ELMO CITY COUNCIL MINUTES 5-21-85 Page 3 was about $80,000 and because road work was needed the cost would go up to $150,000-$200,000. There was not enough of an accident problem to spend that kind of money. Since that time, the County has put an overlay on County 17 and restripped it so there are two lanes of approach. When there are two lanes of approach, Mn/DOT operates on different warrant criteria. Based on this new criteria the warrants are no longer met. Mn/DOT would allow an overhead flashing beacon to be installed, but would not participate in the cost which would be around $10,000. Mn/DOT's opinion is that a beacon would have no affect on the accidents and for that reason they do not see the benefit for the State to participate in the cost. In 1983, Mn/DOT received a resolution from the city requesting signs for "unlawful passing on shoulder", and Mn/DOT's response was that these types of signs are used only when there is a severe congestion problem and where there's an unusually high volume of violators. Mn/DOT's philosophy is they don't like to install signs that state a State Law because a motorist seeing a sign at a given location may interpret that it islegalanywhere else, which is not the case. The other, carried to extremes, completely overload the highway system with signs providing instructions. B. Application by Bill Eder for a simple lot subdivision and zoning code variances. (tabled). 5. City Engineer's Report A. Public Hearing for zoning code (lot size) variance and shoreland permit for application by David Strusinski in the Lanes DeMontreville Country Club Addition. Pursuant to published notice, this public hearing was opened at 7:53 in the city council chambers. The Council discussed David Strusinski's request for a lot -size variance and shoreland permit on the last buildable lot in Lanes DeMontreville Country Club Addition. Strusinski plans to build a home on a previously platted 0.67 acre lot, fronting on Hill Trail Court. Council approval is contingent upon DNR approval of the shoreland permit and City Engineer, Larry Bohrer's recommendations. Bohrer told the Council Strusinski should submit soil test results and septic system design showing that there is adequate room for the primary and alternate system, site plan be submitted showing all the applicable set backs for this well and septic system in relation to all the other wells and septic systems in the area and a contour map before he applies for a building permit. Public hearing was closed at 8:07. M/S/P Morgan/Christ - to grant a lot -size variance and shoreland permit subject to the City Engineers's three recommendations. (Motion Carried 4-1 <Mike Mazzara's comments were that no hardship was proven and concerned about adequate septic systems in the area, size of lot and road frontage. >) LAKE ELMO CITY COUNCIL MINUTES 5-21-85 Page 4 B. Sign Request on 13B Detour. Larry Bohrer, City Engineer, had found that there was only one 30 m.p.h. speed limit sign south bound posted. Pat Klaers, City Administrator, had checked later and found both speed limit signs posted. This would mean that the city should enforce the law. Mike Robinson stated that "Watch Children at Play" sign is discouraged by Mn/DOT because it is difficult to chose what residential area deserves a sign. If carried into extremes, the sign would be everywhere and would completely lose its effectiveness. You cannot rely on a sign. It gives a false sense of security. They see nothing unique about this location that warrants such a device and feels that small children are the responsibility of the parents as to where they play. Hopefully, the detour will be off this fall. Rick & Colleen Hoursh live in a Cul-de-Sac by Lake DeMontreville and are having a problem with vistor's cars being ticketed because of the No Parking signs. These signs were put there for the boat landing and put in before anyone lived there. Mayor Morgan suggested that one no parking sign be removed from the Cul-de-Sac as long A$ the other residents approved. The Mayor would like this approval in writing and sent to the Council. This was agreed. Klaers asked to have the deputies input to see if it is enforceable. C. Landfill Water System Update Larry Bohrer has contacted the county staff for a meeting to resolve our differences, but they prefer he send his design computations, etc. to them and they will look it over for a week and then have a meeting. They did say they do not have a problem supporting a water system of our design as long as they could see that it is a logical design and could be supported with facts and data. D. 201 Update Larry Bohrer referred to a handout regarding the MPCA Plant Review. 1. Nine individuals who were identified as having a need for improvement were removed from the program at their request. These individuals will not be forced to upgrade under the grants program, but the MPCA wished to know how the City will handle these treatment problems. This will be done by the City enforcing its ordinance. 2. Any work necessary to contact the building sewer from the house to the new septic tank is not grant eligible and must be made part of the assessment to the individual. 3. On those individual systems which require an effluent pump, it is the homeowners's responsibility to provide the electrical wiring from the house to the junction box at the pump. In this way the homeowner is responsible for that house electrical service box being up to code rather than the grants program. LAKE ELMO CITY COUNCIL MINUTES 5-21-85 Page 5 4. If it was a maintained lawn to begin with, they should have sod put back. It is important to have grass coverage over it as soon as possible otherwise there is erosion. 5. We had only fenced in drainfields where traffic would be a problem, but MPCA requests that all remote drainfields be fenced. 6. MPCA requests that the drainfield size be increased for Old Village Remote A - Legion Avenue and Old Village Remote D - 34th St. 7. Land acquisition for off -size drainfields is not eligible for grant funds if only one lot is benefited. This would apply to: Old Village Remote F - Twin Point Tavern and Tri-Lakes Remote E - formerly Steve Grabski. If the City were to condemn these drainfield sites and assess the cost to the homeowner, the cost may outweigh the benefit. Bohrer recommends investigating holding tanks for those two properties. 8. MPCA requests test pits be dug at: Old Village Remote G - near Custom Mold and Tri-Lakes Remote D - near Carl Paul. Bohrer asks that the City backhoe and operator be made available to dig these pits. g. MPCA points out that some parts of some systems do not meet required set backs. We have always known that some local variances will be required. Once we complete these plan revisions, we return them to the MPCA. They will review and approve them and then we will be authorized to advertise the bids. E. Surface Water Issues Update Eagle Point Lake is still flowing out, but it's only about an inch presently over the overflow plate that is constructed at the outlet. Because of the rains Beutel Pond is about 21 inches over the outlet. The 32nd Street Pond has risen again and had to add more crushed rock. There's not enough elevation difference and could not get a siphon going so will temporarily put a short piece of culvert to let the water into Reid Park and that can be removed. Bohrer brought up the letter from Rodney Toft and the problem he and neighbors will be having with Legion Avenue Pond. The ground water table is very nearly the surface water level on Legion Pond, and there is no way to drain it by gravity because it is lower than everything else around it. The other alternative is the pump alternative and when investigated in 1980 we found that the water table was near surface elevation. F. Tablyn Park 2nd Addition - Final escrow release. Mayor Morgan authorized permission given for final release of the remaining cash escrow plus any accumulated interest be released for Tablyn Park 2nd Addition. LAKE ELMO CITY COUNCIL MINUTES 5-21-85 M/S/P Morgan/Dunn - to authorize permission for final release of the remaining cash escrow plus any accumulated interest be released for Tablyn Park 2nd Addition. (Motion Carried 5-0) G. Other 1. Update on Castle Design - Bohrer would like permission to consider the second alternative and close off the ketch basins and observe the drainage for a period of time and see if there is an impact on this marshy area. Bohrer will write a letter to Castle Design saying this is what we will do, and we can consider road improvements and storm sewer improvements at a later date. M/S/P Morgan/Armstrong - to proceed with solving the Castle Design drainage problem as presented by Larry Bohrer. (Motion Carried 5-0) 2. Street Repairs - Bohrer would like to measure up the areas in need of repairs and get cost estimates and bring back to the Council. He believes it will be under the limit and will only need two quotes and not have to go out for bids. They will purchase reflectorized signs that say rough road or road repairs to alert the motorist when these potholes show up until the time we can complete the repair. Reduction of speed limit for 20th was discussed, but Mn/DOT would have to be called in to complete a study. Mayor Morgan would like a speed zone study called in for 20th Street, Keats Avenue; and 45th, Julep, and 47th. Mayor Morgan made a request for a resolution to be prepared for Council action at a future meeting.. 6. City Council Reports A. Guidelines for Petitions - Concern was brought up by Armstrong on proper guidelines for petitions and would like an article in the Lake Elmo Newsletter stating that anyone who signs a petition must be nineteen years of age and a city resident. Names and addresses should be written legibly so city staff can verify the petitioners' authenticity. B. June 18th Council Meeting - Mayor Morgan will be out of the country so Pat Klaers will monitor the agenda items, and if there is not, an abundance, they will cancel the meeting or try for a Thursday, June 20th meeting. V. City Administrator's Report A. House Moving Application for Larry Gray - Mr. Gray has applied for a house moving permit which would allow him to move a nine year old structure from Roseville to the City of Lake Elmo. He plans on living in the house and building a 24' x 48' basement wih a tuck under garage. The house will face loth Steet. Mr. Gray is in the process of purchasing a lot in the David Nelson Estates subdivision. The lot where he desires to place this home is the southeastern lot which currently has the large accessory structure. Mr. Gray is aware LAKE ELMO CITY COUNCIL MINUTES 5-21-85 Page 7 that this structure must be demolished or reduced in size to 1,000 sq.ft. which conforms to our city code. Mr. Gray has a professional. moving company who does a lot of work in the area doing this project for him. The company has the proper insurance and the utility department and sheriff's departments have been notified. The route will be coming in from the west along 10th Street so any concerns the city has relating to street damages has been taken care of. This is an "after the fact" permit because of the time requirements when houses become available. Mr. Gray had to move this house by Thursday, May 23rd. This is a common problem when obtaining homes that need to be moved off the site. There is a definite time factor that is difficult to meet when an application must be processed through the Plnaning Commission to the City Council. Because of this issue, the Council authorized the City Attorney to review that section of the -code to' see if somethingcan be done to approve permits in a more timely fashion. This may relate to deleting the Planning Commission's review of the application or allowing the staff to give administrative approval. M/S/P Morgan/Armstrong - To approve the moving of Mr. Gray's house into the City of Lake Elmo and temporarily locate it until all proper procedures have been followed. (Motion carried 5-0) B. Boarding Care Home - Robert Butler, Ph.D., Human Services, Inc., Richard Backman, Supervisor, Washington County Community Social Services, Del Sand; President, Hecla, Inc., and Jackson Hodgeson, Hecla staff presented their plans for a boarding care home. Dr. Robert Butler talked about a group home or halfway house for the adult mentally ill. Washington County does not have any residential facility for the adult mentally ill, but they have used Ramsey and Hennepin County. Adult mentally ill are not dangerous people or chemically dependent, but characterized as disorganized in their lives and in need of direction. These are not strangers, but people they have seen in the day treatment program. The two criteria for choosing this site was because it is close to the day treatment facility in Oakdale and close to the bus lines. The 15 women and men group home will be built in the Brookman Addition on a 1.5 acre Laverne Avenue lot, north of Highway 5. The six bedroom home will be staffed around the clock. In heavy program times there will be three to four and at night there will be one staff member. They do have a funding grant from the State of Minnesota and part will be funded by the county. HRA would own the facility for two years and at the end of that time Hecla, which will be the managing I organization, will then purchase the facility and lot from IiRA. Richard Backman, Supervisor, WCCSS in Stillwater, stated they have social workers active with everyone who will be in the facility as a case manager and part of their responsibility will be to sit in on the LAKE ELMO CITY COUNCIL MINUTES 5-21-85 Page 8 staffing to make sure that the person does have a program, supervision and treatment that is needed. Jackson Hodgson, Hecla staff, will make people aware of mental illness and that the facility will be built. There will be open houses initially and then open on an annual basis. They want to make this a community effort and hope to form an advisory board with repesentatives from the Lake.Elmo Council and a county commissioner. Del Sands, President, Hecla, Inc. informed us that they are a -:for-profit organization and was named after a Provincial Park in Canada, but it is a legal incorporation. Lake Elmo is the sixth group home in Minnesota. Other homes are located in Austin, Albert Lea, New Ulm,Litchfield, and Little Falls. It is a Rule 36 facility which means it meets all the state requirements; such as building, fire and health codes, staff that is hired and the programs that are offerred.. There will be approximately 1,500 sq.ft. on each floor. It will look like a residential facility with aluminum siding, all landscaped, double attached garage, and walk out patio in back on both floors. Program director and many of the hired staff will be asked to live in Lake Elmo area so that they would be able to respond if needed. Armstrong.asked the City Attorney what ,recourse does the city have if the facility does not work out or the'community.wouldn't find it acceptable. The City Attorney advised that once the facility is constructed that becomes extremely difficult unless there is a: code violation. M/S/P Dunn/Armstrong - To adjourn the meeting (9:40 p.m.) (Motion carried 5-0) Since we do not have time to discuss every point presented, it may seem that decisions are preconceived. However, background information is provided for the City Council on each agenda item in advance from City Staff and appointed Commissions; and decisions are based on this information and past experiences. In addition, some items may also have been discussed at previous Council meetings. If you are aware of information that hasn't been discussed, please fill out a "Request to Appear Before the City Council" slip; or, if you came late, raise your hand to be recognized. Comments that are pertinent are appreciated. Items requiring excessive time may be continued to another meeting. AGENDA LAKE ELMO CITY COUNCIL MAY 21, 1985 7:00 p.m. Meetings Convenes 1. Agenda 2. Minutes: May 7, 1985 3. Claims 4. Planning Commission Report A. Presentation: Mike Robinson, Mn/DOT District Traffic Engineer to discuss traffic and safety concerns along Highway 5 near CSAH 17 intersection. B. Application by Bill Eder requesting a simple lot subdivision and zoning code variances, south of RR tracks and east of Lake Elmo Avenue (con't). 5. City Engineer's Report 7:45 p.m. A. Public Hearing for zoning code (lot size) variance and shoreland permit for application by David. Strusinski in the Lanes DeMontreville Country Club Addition. B. Sign request on 13B detour (tabled from May 7th) C. Landfill WaterSystem Update D. 201 Update E. Surface Water Issues Update F. Tablyn Park 2nd Addition - Final escrow release. G. Other (OVER) 6. City Council Reports 7. City Administrator's Report May 14, 1985 To: Mayor and City Council From: Patrick D. Klaers, City Administrator yoxrRe: Informational Memo for May 21, 1985 meeting 1. Wish to acknowledge that I am out of the office Wednesday, Thursday and Friday when the agenda background material and informational memo is being finalized. Because I am doing the work on the agenda and informational memo on Monday, May 13th, there may be a number of additions to the City Council agenda. Presently, the agenda is very light, but items have a way of being added to the agenda - especially in the spring and summer months. There are fewer additions to the agenda in the winter and fall months, but the additions are heavy at this time of the year because of the construction activities. Applicants are always in a hurry to get council approval as quickly as possible so that their construction can be done within the current season. The staff is sympathetic to these reqests and often tries to accomodate them in processing applications as quickly as possible. 2. Attached for your information is the most recent City Newsletter edition dated 5-14-85. 3. Attached for your information are the 3-28-85 and 4-3-85 VBWD minutes. Once again, these Watershed District minutes deal with a number of items that are taking place in Lake Elmo, and in the entire district in relationship to the 509 Plan. 4. Attached for your information is an article from the Minneapolis paper dated 5-13-85. This article discusses the rising lake levels in the entire state. Please note a quote on the back page of the article that states that "The 83-84 two year period, and the 82-84 three year period were the wettest on record in the Twin City area". You should note that the record keeping began in 1836. This fact has a lot to do with the current water problems we are experiencing. 5. Attached for your information is a memo from Zack Hansen who was before the City Council on 5-7-85 discussing composting. This is a follow up to his presentation in which he desires to clarify some of the proposed terms and conditions for a composting site in Lake Elmo. I expect that this item will be on the June 4th agenda, once the Bruce Dunn, Arlyn Christ and Nancy Prince committee has made a recommendation for a proposed composting site. 6. Attached for your information is the most recent law enforcement report from the Washington County Sheriff's Department for April, 1985. This report does not give us a great deal of information, but indicates a typical number of complaints received, miles driven and citations issued for this time of the year. I have repeatedly asked for additional general information from the County regarding our City police officers activities, but these requests have not produced any results to date. I think by having the police officer on duty the night of a Council meeting appear every two or three meetings to keep us abreast of current activities is as good of a plan as any to keep us updated on local events and activities. INFORMATIONAL MEMO FOR 5-21-85 CITY COUNCIL MEETING PAGE 2 7. Wish to acknowledge the Parks Commission is holding a tour of the City Parks on Monday, May 20th, 1985 beginning at 6:30 p.m. starting at Lions Park. This tour will replace its regular meeting that takes place in the council chambers. Any and all Council Members are invited to participate in this tour of our City Parks. 8. Wish to acknowledge that the County will begin construction on County Road 13B in Lake Elmo on June 4th, 1985. 9. Wish to acknowledge that Clean Up Days was a successful project once again in 1985. The budget was for $1500, and this project was accomplished within that budget figure. While on the topic of the public works budget, I would like to inform the Council that the repair and maintenance catagory appears to be going over budget this calendar year because of an abnormally high number of repairs in our snowplowing equipment. We will be trying to make adjustments to keep our spending under budget in some of the other areas so that the bottom line figure will match our projections. This most easily is accomplished in the gravel capital outlay catagory. The 1986 budget process will be started shortly - once we receive the six month expenditure totals. You can expect further updates and information from the staff on this budget process for 1986. 10. Wish to acknowledge that the Street Sweeping Project that was awarded to Allied Contracting is scheduled to be completed this week. Maintenance Foreman, Dan Olinger has informed me that they are completing the project on schedule and the quality of work is acceptable to the maintenance department. 11. The street crew will be starting to make some small repairs of the potholes in our local streets this next week. There are some areas where larger repairs are going to be needed, and Larry Bohrer will be working with the maintenance crew in this area. We anticipate the need to contract out some of these larger repair items to a company that has a paving machine so that a more permanent replacement of our City streets can be made instead of making patches in the same area year after year. 12. Wish to acknowledge that the City will be proceeding with the installation of a culvert between the pond that is encroaching on 32nd Street and the pond in Reid Park. This item was on a Council agenda in April, 1985 and, the City was authorized to place limerock on 32nd Street to make that road accessible from the Ruppert property. The water has continued to increase, and the limerock is not solving the problem. This culvert will saturate the trails in Reid Park, but once the water recedes, these trails will again be useable with a minimal amount of damage. 13. Wish to acknowledge that the City has been informed by Mn/DOT that they are requiring Mr. Rossow (who had made application in 1978 for the Tri-Star Addition which is no longer valid) to remove the beams that are in the right-of-way along Highway 36. If Mr. Rossow does not willingly remove these beams, Mn/DOT will do the work for them after May 20, 1985, and will bill Mr. Rossow for the work completed. You should note that Mr. Rossow has also discussed getting