Loading...
HomeMy WebLinkAbout07-02-85 CCM�i6� u Il ul J�J;1 LAKE ELMO CITY COUNCIL MINUTES JULY 2, 1985 Mayor Morgan called the meeting to order at 7:02 p.m. in the council chambers. Present: Armstrong (arrived 7:06), Christ, Dunn, Mazzara, Acting Administrator Banister, City Engineer Bohrer, City Attorney Knaak, and City Planner Chelseth. 1. Agenda M/S/P Morgan/Dunn - To approve the agenda for the July 2, 1985 City Council meeting as amended. Add 8A. Board of Review, 8B. City Administrator Applications, and 8C. Letter received on 201 Program. (Motion carried 4-0) 2. Minutes M/S/P Mazzara/Dunn - to approve the June 4, 1985 City Council Meeting minutes as presented. (Motion carried. 4-0) 3. Claims M/S/P Dunn/Christ - to approve the claims 86191 thru 86280 with the exception of Claim 86223. (Motion carried 4-0) Dunn and Morgan expressed concern with spending $1,068.00 to belong to this organization (AMM) and would like to see a detailed explanation on the benefits the City receives from belonging to this group. 4. Zack Hansen and Bruce Dunn on Composting. Zack Hansen made a presentation regarding several possible yard waste composting sites. From the public health department perspective, the least acceptable site was the Regional Park, 15th Street Entrance, and the best site was the Public Works Garage Site. Zack Hansen reviewed his memo of June 27, 1985 in which he discusses the most desireable to the least desirable sites for composting in Lake Elmo. This memo is on file at the city office. 1. Public Works Garage Site . This site is by far the most suitable site for a yard waste composting project. It has good access, is secure because of the proximity of the Public Works Garage and a gate could be installed, will require very little site preparation, is close to public works equipment and is well screened. Composting periods are five weeks in the fall and five weeks in the spring and depending on what the City wishes it could be open a couple days per week in the summer for other yard waste. This could be Wednesday afternoons and weekends. In order to get this into motion by this fall the major concern is to get the site developed in time and this site would simply be tree trimming and erecting a gate, if necessary, and any signs that are desired. It is important to publicize the site well in advance and in LAKE ELMO CITY COUNCIL MINUTES JULY 2, 1985 PAGE 2 the August city newsletter. In addition, we have to sign a memorandum agreement between the city and county, and this would be an annual contract. The County would pay for the site to be prepared and if the City used.its own equipment they would be reimbursed. Basically, the City provides the site and the County picks up the cost for the whole project. The compost will be given away if this composting site is operated as in other programs. It would be an 18 month cycle, ie: material collected this spring would be available in the spring of 1987. Consensus of the Council is that the Public Works Garage site is a good site at which to implement this program. Zack Hansen will be sending a memorandum agreement to the City this week. 5. Public Inquiries A. Bob Sneen and Steve Plummer (from Edina Realty) representing the seller (Mrs. Dahl) and the potential buyer (Mr. Strutt) regarding lot on 32nd St. off of Klondike. Bob Sneen has a purchase agreement between Mrs. Dahl and Mr. Strutt for the lot on 32nd St. off of Klondike subject to the building provisions. The potential builder had contacted the City Engineer for a building permit and was told that a building permit would not be issued on this property because there was an intended common drainfield for this site. Edina Realty understood that the City would be going through condemnation proceedings and would purchase the lot from Mrs. Dahl for this drainfield. Mayor Morgan explained that the 201 Program has been in existence for at least three years. This program has gone through phase by phase over this time and is a program with state and federal assistance to restore private sanitary systems. The City Engineer referred to the map and explained the 201 program in further detail. There has not been any offers made to the owner because acquisiton of land using the state and federal funds has to be followed in a very strict manner known as the Federal Land Acquisition and Relocation Act. The site has not been approved by the Minnesota Pollution Control Agency as yet, and they are the review agency for the state and federal grants; but it has been reviewed in a preliminary way and they have made comments which we have to respond to and believe that approval is imminent. Once we receive approval we will have the land appraised and will negotiate with the owner for that purchase. Mayor Morgan explained that the City is committed to the 201 Program and so no action will be taken until we find out whether this site is approved. A building permit could not be issued in the time limit in question because you would have to go through the variance process which means the Planning Commission and then the City Council. City Attorney Knaak advised by enforcing the zone code ordinances the city is fulfilling its legal obligation of what it has to do and any LAKE ELMO CITY COUNCIL MINUTES JULY 2, 1985 PAGE 3 proposed changes have to include reasonable standard proof that a ( variance would not adversely affect among other things the safety and health of surrounding properties. Especially when dealing with a sewage situation the first thing to be considered is the health factor, but it's the landowners seeking the variance that has thefull burden before the council. (I/ 6. Public Hearing - I-94 Overlay and Comp. Plan Amendment. Pursuant to published notice, this public hearing was opened at 7:45 p.m. in the City Council Chambers. Rob Chelseth referred to his memo dated January 21, 1985 to the Planning Commission and City Council. There will be two districts. An interim district along I-94 (eastern Section 33 east to County Road 15) and this district would permit interim uses, those are uses not served by public sewer and water that demand negligible increases in public services, and a "long term" area that would permit more intensive uses consisted in the comprehensive pl�n. It's an overlay district and is a means of monitoring the types of uses that go in there and grant them conditional use permits. Each of the two districts has approximately twelve standards that would be applied by the City Council when they are considering a conditional use permit. M/S/P Morgan/Armstrong - To adopt Ordinance Elmo City Ordinance, The Comprehensive Plan include an "Overlay District" as outlined in of 1-21-85. (Motion carried 5-0) 7. City Engineer's Report A. Landfill Water System Update 7971 amending the Lake and the Zoning Map to the City Planner's memo There was some concern over the lack of progress on resolving the public water supply issues around the old landfill. The City Engineer has written a letter to provide the sequence of events from the joint meeting of the County Boards up to the present and to provide all past correspondence on the matter. The two remaining issues to be resolved are Operation and Maintenance Costs and System Design. One thing to note is that the tests of the wells have been getting better. Formally, there were four residential wells that exceeded health criteria for drinking water and that has been reduced to only one that is in the health risk criteria. The purpose of the water supply is two -fold, first, to provide safe water for all needs and, secondly, to restore the property values. The advisory committee determined that only a public water supply would do both. Mayor Morgan would like to invite the County Commissioners and any interested parties in for the next meeting, and Larry Bohrer will make sure they have all the appropriate correspondence. B. Public Hearing for variances requested by Ed Ryan at 4384 Kimbro Avenue North. Pursuant to published notice, this public hearing opened at 8:46 p.m. in the City Council Chambers. LAKE ELMO CITY COUNCIL MINUTES JULY 2, 1985 PAGE 4 l Mr. Ryan has a purchasers agreement with Mr. Whitman to sell him 2.54 acres. This would meet the 10 acre requirement Mr. Ryan needs to raise horses. The problem comes in with the City not having a mechanism to divide off 2.5 acres and add it to this property. There is no provision for a minor subdivision. A large lot subdivision is where the applicant proposes to subdivide a described tract of land into lots or parcels of five acres or more each with 300 feet or more of road frontage. It should be noted that to conform to the city code, Mr. Whitman is required to have 300 feet of road frontage. Although he does not have this now, if the parcel that he sells to Mr. Ryan includes any of the road frontage, Mr. Whitman will be less conforming than he is now. Dunn asked Mr. Ryan if he wanted 7.5 acres or 10 acres. Mr. Ryan answered that the 2.5 acres would cost him $11,000. If he had to and it could be done easily without paying the platting expense because he is purchasing the other property. Since the existing house is set quite a ways back, Mr. Ryan would like to put the barn between the road and house which would need a variance and also the size. In a residential zone, the size of an accessory structure is 1,000 square feet, but Mr. Ryan would like a 2,000 square foot accessory structure. M/S/P Christ/Dunn - To grant variances to Ed ryan on the porperty legally described as Lot D of RLS 54 to allow up to three horses on 7.5 acres of land; to allow the accessory structure to be placed in front of the primary structure, and to allow the accessory structure to not exceed. 2000 square feet. (Motion carried 4-1 <Mazzara>) C. Hecla Inc. - Site Plan presentation. Del Sands, Hecla, made the site plan presentation. All the plans have been approved by the State of Minnesota in terms of the types of licenses they need to operate the facility. The City Engineer pointed out, regarding the number of parking spaces planned for this home, that under the General Business Zone one parking space is required for each 200 square feet of gross floor area. This proposed building has 3,000 square feet of area. The question is does that mean that fifteen spaces should be provided now or would it be sufficient that there is room available to construct fifteen. It was clarified that it is more important that the parking space be available. The City Engineer further reported that the septic system is adequate, there is room for an alternate drainfield, setbacks are met, and public water is available. M/S/P Dunn/Mazzara - to approve the site plan for the boarding care home. (Motion carried 5-0). D. Shoreland Permit - Citadel Homes/Roger Colombo at Lot 9, Block 1 Eden Park 2nd Addition. LAKE ELMO CITY COUNCIL MINUTES JULY 2, 1985 PAGE 5 The City Engineer referred to his memo of June 27, 1985 in which he ( states that Citadel Homes proposes to construct a single family home on the above lot. Since this area is within 1,000 feet of Down's Lake, Shoreland Regulations apply. He further stated that lots within Eden Park 2nd Addition require some background information regarding application of the Shoreland Ordinance. At the time the plat was approved, the flood elevation was set sat 891, assuming the VBWD would follow its overall plan to divert water from Down's Lake to Lake Elmo. Since it is likely this will not occur the flood level was raised to 894 in the Shoreland Ordinance. This difference greatly affects buildability of lots within Eden park 2nd Addition. If this application would be approved, variances for lot size, structure setback from the water, and basement elevation would be required. Variances for lot size, building elevation and building setback are reasonable and consisstent with past Council action with other lots in Eden Park 2nd Addition. The Engineer feels tat it would be appropriate to grant these variances since the applicant has chosen the best site for the house and septic system available on the lot. The approval should be conditioned on the recommended septic system design. M/S/P Dunn/Armstrong - To grant a shoreland permit to Roger Colombo/Citadel Homes on Lot 9, Block 1 Eden park 2nd Addition for the construction of a home contingent upon the applicant complying with the recommendations of the City Engineer in his memo of June 27, 1985. (Motion carried 5-0). E. Shoreland Permit - Daniel Lindstrom, 7959 Hill Trail North Mr. Lindstrom proposes to remove an existing garage and construct a. new attached tuck under garage with living room above. Since this lot is within 1,000 feet of Lake Olson, shoreland regulations apply. No variances are required for this work. This lot is included in the 201 Septic System Progra, but since no bedrooms are being added, no changes to the septic system design are required. The City Engineer recommended that the Shoreland Permit be granted. M/S/P Christ/Mazzara - to grant a shoreland permit to Daniel Lindstrom, 7959 Hill Trail North. (Motion carried 5-0). F. Variance Requests - Bill Eder (continued) The original proposal came up in April which was a request for a simple lot subdivision to create two lots and since one was going to be less than a acre and a half a lot size variance would have been required. Mr. Bill Eder now owns the Shultz property which had divided the property owned by Willard Eder and now the lot size variance is no longer required. The road frontage variances and some kind of private road agreement are still required. The City Engineer pointed out now that the subdivision is allowed with these variances, and he assumes that Mr. Eder will be going through LAKE ELMO CITY COUNCIL MINUTES JULY 2, 1985 PAGE 6 the subdivision process a survey is required showing the division of the two lots. M/S/P Christ/Morgan - to grant a road frontage variance to Bill Eder with the stipulation that the City of Lake Elmo will not be liable for the access of emergency vehicles nor for the maintenance of the road. (Motion carried 5-0). G. Tartan Meadows - Phase II The plat for Tartan Meadows was allowed to be signed and recorded without the developer furnishing his developers bond. This was not discovered until some time later. The only leverage the city had is to deny the building permits until he complies with the terms of the developer's agreement. There are three things that are left to do; filling and grading the boulevards, constructing a temporary turnaround and the turf establishment. It is the City Engineer's opinion that the temporary cul-de-sac and turf restoration can wait until fall to be completed. However, the curbs should be backfilled and the boulevards brought up to grade to protect, the curbs during home building activities. Bohrer has suggeested that building permits can be issued for Tartan Meadows after all of the following conditions are met: 1. Filling, leveling and placing topsoil on the boulevard should be completed now. 2. The developer, Mr. Morton, should furnish a cash escrow, letter of credit or performance bond for the completion of the cul-de-sac and turf restortation in the amount of $3,100. 3. Payment of the outstanding snowplowing bill to the private contractor. M/S/P Dunn/Armstrong - to allow building permits to be issued in Tartan Meadows Phase I contingent upon these three conditions outlined by the City Engineer. (Motion carried 5-0). H. Surface Water Update. City Engineer, Bohrer, referred to his letter dated June 26, 1985 regarding the status report on various surface water problems. He said sandbags are still in place on the Lake Olson Weir, since the DNR denied the Valley Branch Watershed District (VBWD) Board of Managers' request for installation of a vandal -proof steel ring on the weir. The second week in June, Beutel Pond, threatening at least one Jamaca Court home, was drained until Eagle Point Lake began to overflow. Installation of a temporary culvert connecting the 32nd Street Pond to Reid Park Pond lowered the 32nd Street Pond by about eight inches providing accessibility to the fire hydrant and the Rupperts' driveway. One Lake Jane Trail and two Jane Road residents have received fill to protect their homes from flooding. LAKE ELMO CITY COUNCIL MINUTES JULY 2, 1985 PAGE 7 A proposal for interim emergency pumping 300 acre feet of water from ( Lake Jane to the Shafer's (Richards) Gravel Pit lying in the NE 1/4 of Section 16 was discussed. A pump is available from the Valley Branch, and the Lake Jane Assoc. has approached the owners of the Shafer's Gravel Pit and they would be agreeable. No easements would be needed because it would go through city owned property or the Richards property. The three Shafer's Gravel Pit stipulations were that they would be free of liability, and there would not be damage to the road or the gravel deposits of the pit. The City Engineer and Scotty Lyall looked at the soils and they seemed to look sandy in this area. Scotty was told by Rudy that the water stands there and does not go away so they thought there must be clay underneath it. From looking at the contour map, Bohrer found that the elevation of the standing water is 926 feet, and he thinks that is ground water table right there and questions the feasibility. Another concern is the contaminants close -by that may be pushed into another direction by raising the level of the water table. The City Engineer will do a mini -feasibility study. Costs were given for the following: pipe rental $1/ft. for 10" pipe until Fall for est. 4,400 feet = $4,400 the pump capacity is 3 acre feet a day. electrical estimate = $2,500 manhole estimate = $1,000 liability insurance (Shafer's request to protect themselves) laying the pipe will be volunteer labor. minor labor cost for actual hooking up the pump question road crossing at Jamaca If we want to asses this, we have to have a public hearing which will be held on Wednesday, July 24, 1985 at 8:00 p.m. in the City Council Chambers. Every lot., piece or parcel of land abutting the three lakes (Jane, Demontreville and Olson) and ponds will be the proposed area to be assessed. Mazarra - if this project is feasible and the homeowners are willing to pay for this, he feels its reasonable and we should go ahead and do it. Dunn - we should take a serious look at this and firm up the figures and answer the question of the water standing in the gravel pit. M/S/P Morgan/Mazzara - to call a public hearing to determine the feasibility of moving 300 acre feet of water from Lake Jane across city property to the Shafer's Gravel pit. (Motion carried 5-0). I. 1984 MSA Improvements - Change Order #2 Work on the 1984 MSA Improvements, 45th Street, Julep Avenue and 47th Street, was substantially complete last Fall, and they have just finished some ditch sodding. LAKE ELMO CITY COUNCIL MINUTES JULY 2, 1985 PAGE 8 Throughout the spring a maintenance problem has developed. The gravel ( shoulder on the south side of 45th Street east of Jane Road erodes because of the steep slope and the superelevation of the pavement. The recommendation of the Maintenance Department would be to pave that strip (a 4 foot wide shoulder x 600 feet long) and the estimated cost is around $2,200 and would be reimbursible from state aid funds. A firm price from the contractor is $2,760 and the difference is primarily the general contractors markup. Based on the Maintenace Dept. recommendation, the City Engineer would like to add a change order on this work. M/S/P Morgan/Mazzara - to approve the 1984 MSA Improvements - Change Order #2 as recommended by the City Engineer in his memo of June 26, 1985-(Motion carried 5-0) J. Street Light Request -• Jamaca Avenue and Lake Jane Trail The City has received a request from Mr. Mike Wagner, 9040 Lake Jane Trail, for the City to install a street light at the intersection of Jamaca Avenue and Lake Jane Trail. He states that since the intersection is dark, some people miss the turn from Jamaca Avenue to Lake Jane Trail and end up in his yard. Traffic counts indicate over 1,000 vehicles per day use the intersection and the Lake Jane Trail is a designated bicycle route. The monthly charge for the light will be between $9 and $15, depending on the wattage required. There is no additional charge for installation. A suggestion was made for the City Engineer to contact the other neighbors and find out how they feel about this request and report back the findings. K. 1985 Street Repairs - Review Bids The street repair bids were received on June 28, 1985 and the apparent low bid was from Tower Asphalt. This low bid exceeded the engineers estimate by almost $2,000. This was because of the item Bituminous Mixture (blacktop) was estimated at $30 a ton and the lowest bid was $33.30. M/S/P Morgan/Dunn - to accept the lowest bid of $19,360.00 from Tower Asphalt for the 1985 street repairs. (Motion carried 5-0). 8. City Council Reports A. Board of Review Mayor Morgan brought up that he was informed that our Board of Review was illegal for the last ten years because there is suppose to be a majority of the Council present rather than just two council members along with the assessors. Also the meeting that we accept the Board or Review's conclusions is probably illegal because the assessor was not present. A request was made to the City Attorney to look into this and report back. B. City Administrator Applications LAKE ELMO CITY COUNCIL MINUTES JULY 2, 1985 PAGE 9 The City has received 52 applications for City Administrator and the Council Members were asked to each select five top applicants for the position. C. 201 Program Letter A letter was received from Holmes and Graven regarding their comments on the 201 program and this letter was turned over to the City Engineer and the City Attorney for their comments. M/S/P/ Dunn/Armstrong - to adjorun the meeting at 10:25 p.m. (Motion carried 5-0) Ordinance 7971 - i-94 Overlay Since we do not have time to discuss every point presented, it may seem that decisions are preconceived. However, background information is provided for the City Council on each agenda item in advance from City Staff and appointed Commissions; and decisions are based on this information and past experiences. In addition, some items may also have been discussed at previous Council meetings. If you are aware of information that hasn't been discussed, please fill out a "Request to Appear Before the City Council" slip; or, if you came late, raise your hand to be recognized. Comments that are pertinent are appreciated. Items requiring excessive time may be continued to another meeting. AGENDA LAKE ELMO CITY COUNCIL JULY 2, 1985 7:00 p.m. Meetings Convenes 1. Agenda 2. Minutes: June 4, 1985 3. Claims 4. Zack Hansen and Bruce Dunn on Composting. 7:15 p.m. 5. Public Inquiries A. Bob Sneen and Steve Plummer (from Edina Realty)representing the seller (Mrs. Dahl) and the potential buyer (Mr. Strutt) regarding lot on 32nd St. off of Klondike. B. Other 7:20 p.m. 6. Public Hearing - I-94 Overlay and Comp.. Plan Amendment. 7. City Engineer's Report 7:35 p.m. A. Landfill Water System Update 7:45 p.m. B. Public Hearing for variances requested by Ed Ryan at 4384 Kimbro Avenue North. 8:00 p.m. C. Hecla Inc. - Site plan presentation. 8:20 p.m. BREAK 8:30 D. Shoreland Permit - Citadel Homes/Roger p.m. Colombo at Lot 9, Block 1 Eden Park 2nd Addition. 8:45 P.m E. Shoreland Permit - Daniel Lindstrom, 7959 Hill Trail North. 9.00 p.m. F. Variance Requests - Bill Eder (continued) 9:15 P.m• G. Tartan Meadows - Phase II request H. Surface Water Update I. 1984 MSA Improvements - Change Order #2 J. Street Light Request - Jamaca Avenue and Lake Jane Trail. K. 1985 Street Repairs - Review Bids 7. City Council Reports Since we do not have time to discuss every point presented, it may seem that decisions are preconceived. However, background information is provided for the City Council on each agenda item in advance from City Staff and appointed Commissions; and decisions are based on this information and past experiences. In addition, some items may also have been discussed at previous Council meetings. If you are aware of information that hasn't been discussed, please fill out a "Request to Appear Before the City Council" slip; or, if you came late, raise your hand to be recognized. Comments that are pertinent are appreciated. Items requiring excessive time may be continued to another meeting. AGENDA LAKE ELMO CITY COUNCIL JULY l6, 1985 7:00 P.M. Meetings Convenes 1. Agenda 2. Minutes: July 2, 1985 3. Claims 4. 3.2 Beer license transfer at Cimarron Park 7:10 p.m. 5. Sam Emerson - Concept for golf course and approximately 70 homes at the southeast corner of CSAH 13 and CSAH 70. 7:20 p.m. 6. Nancy Prince and Sue Ayde (from Bellaiare Sanitation) on recycling. 7. City Engineer's Report 7:30 p.m. A. Public Hearing for Augustine/Taylor for simple lot subdivision, variance to platting requirement and shoreland permit. 7:45 p.m. B. Public Hearing for variance to drainfield setback, and petition for road vacation. Applicant: David Strusinski 8:00p.m. C. Surface Water Update D. Street Light Request at Jamaca and Lake Jane Trail. 8:20 p.m. -------------------- BREAK -------------------------- 8:30 p.m. E. Landfill Water Supply - Discussion with County Commissioners' Artie Schaefer and Sally Evert. F. Other 9:00 p.m. 8. Fran Pott - Change Relief Assoiciation's Bylaws. 9:10 P.M. 9. City Administrator's Report A. Request from Maintenance Foreman regarding MEED employee. B. Request from Planning Commission regarding advertising sign on Highway 5. C. Budget Calendar D. Other CLAIMS TO BE APPROVED AT JULY 2, 1985 LAKE ELMO CITY COUNCIL MEETING 86191 thru 86202 June 21st payroll (actual) $ 6,562.57 86203 Commissioner of Revenue - June State withholding 991.00 86204 State Bank of Lake Elmo - June Federal withholding 1,838.00 86205 David Morgan - 1/2 Mayor Salary 1,200.00 86206 Bruce Dunn - 1/2 Council Salary 900.00 86207 Mike Mazzara It900.00 86208 Rose Armstrong IT 900.00 86209 Arlyn Christ It 900.00 86210 Washington County - Landfill Payment 7,500.00 86211 Allied Group Insurance Trust - Hosp. 86.86 86212 LMCIT - July Hosp. 1,252.62 86213 MBA - July Hosp 52.00 86214 Lake Elmo Associates Ltd. - July Rent 1,760.77 86215 Rauenhorst & Carlson - Retainer $ 300.00 Castle Design 498.50 Alford & Berub 90.00 888.50 86216 Caswell & Tavernier - Legal Services - Criminal 850.00 86217 Pegboard Accounting - Office Supplies 144.21 86218 American Typewriter - Office Supplies 112.67 86219 American Data Products - Office Supplies 82.33 86220 IBM - Typewriters maint contracts 190.00 86221 Pitney Bowes - Postage meter 54.00 86222 Washington County - Assessment book 158.90 86223 AMM - Dues 1,068.00 86224 Northwestern Bell - Office $ 180.88 Fire 53.83 Maint. 53.17 Park 11.98 299.86 86225 AT & T - Office phones 36.02 86226 Northern States Power - Street Lights $ 633.99 Fire 87.03 Maint. 91.77 Park 94.65 Water 194.62 1,102.06 86227 Gerald Dahlberg - Animal Control - June 324.00 86228 City of North St. Paul - Animal Control Vehicle 150.00 86229 Oakwood Animal Hospital 90.00 86230 James McNamara - June Mileage - Lake Elmo $ 183.96 Mahtomedi 103.60 287.56 86231 Mary Meyer - 6/11/85 newsletter - -T 250.00 86232 Lillie Newspaper - legal publications 38.84 86233 Mpls. Star & Tribune - Adm. ad 170.50 86234 Junker Sanitation 45.00 86235 Satellite Ind. - 5 flooded homes 260.00 86236 Oxygen Service - Fire Dept. 6.00 86237 St. Croix Valley Clinic - Fire Dept. workers Comp 33.00 86238 Motorola - Radio Repair 13.20 86239 Brookman Motors - Fire Dept. truck repair 69.16 86240 Fran Pott - Fire Chiefs Conv. Motel $47.96 Radio Repair 10.00 Misc. Bldg. Maint. 1.16 59.12 (over) JULY 2, 1985 CLAIMS - page 2 86241 Richard Sachs - Fire Dept. - School & Mileage 86242 Jim Sachs " it11 86243 Mike Pott Ifit 11 86244 Bill Eder It It " 86245 Fire Chief Magazine - Subscription 86246 Kunz Oil Co. - Fire Dept. gas 86247 Lake Elmo Oil - Fire Dept. $ 34.43 Maint. Dept. 1,567.43 '86248 Meyer Hardware Fire Dept. Maint. Dept. 68.36 86249 Hardware Hank - Fire Dept. 73 0 Maint. Dept. 46.55 86250 Hagbergs Country Market - Maint. Dept. supplies 86251 T. A. Schifsky - MC Mix 86252 Carlson Equipment Co. - Maint. Dept. parts '86253 Healy -Ruff Co. - Maint. Dept. - parts 86254 Johnson Tire & Service - Maint. Dept. 86255 ABM - Maint. Dept. parts & repair 86256 Vern's GTC - Maint. Dept. 86257 Bathke Co. - Maint. Dept. supplies 86258 Gopher Sign - Maint. Dept. signs & barricade strips 86259 Continental Lighting Maintenance Supplies - Maint. Dept 86260 Bryan Rock Products - Maint. Dept. gravel 86261 Blind Custodial Products - Maint. Dept. supplies 86262 Jim Hatch Sales - Maint. Dept. supplies 86263 Reed's Sales & Service - Weedeater 86264 Washington County - Trail Grooming Sunfish Park 86265 Suburban Lighting - Ballfield lights replacement 86266 Polar Plastics Inc. - sandbags 86267 Wallace & Tiernan - Water Dept. Rod Maintenance 86268 Chapin Publishing Co. 1985 Street Repair Bid 86269 thru 86280 June 28th payroll - estimated TOTAL r 57.60 57.60 65.20 50.00 18.00 130.70 1,601.86 71.24 119.75 18.33 425.70 82.25 96.94 20.00 12.93 67.03 90.33 467.80 326.63 82.11 239.86 14.3C 319.97' 275.05 146.58 173.60 498.00 51.68 6,500.00 $ 43,707.79