HomeMy WebLinkAbout08-06-85 CCMCLAIMS TO BE APPROVED AT AUGUST 6, 1985 LAKE ELMO COUNCIL MEETING
36322
Firehouse - Fire Dept. - subscription
$ 29.97
86323
1985 Fire Chief's Conference
80.00
86324
David Eder - Cleaning
79.60
86325
State Bank of Lake Elmo - July Federal withholding
1,815.00
86326
Commissioner of Revenue - July State withholding
927.00
86327
thru
86338
August 2nd payroll
6,983.32
86339
Gerald Dahlberg - July animal control officer
324.00
86340
Oakwood Animal Hospital
144.00
86341
City of North St. Paul - vehicle
150.00
86342
State Treasurer - Ken Carroll Water certification
20.00
86343
McCarthy Well - Water Fund - pump repair
387.00
86344
Jones Chemicals - Water Fund chemicals
177.23
86345
Lake Elmo Assoc. Ltd. - August rent
1,760.77
86346
Allied Group Insurance Trust -
76.86
86347
LMCIT - Aug. Hosp.
1,225.80
86348
Minn. Benefit Assn
52.00
86349
James McNamara - July Mileage Lake Elmo $ 158.48
Mahtomedi 130.12
288.60
86350
ICBO - Building Officials Conference
215.00
86351
Mary Meyer - 7/23/85 newsletter
250.00
86352
Lillie Suburban Newspapers - legal publications
60.07
86353
Northwestern Bell - Office $ 181.21
Fire 53.19
Maintenance 52.74
Park 11.06
298.20
86354
A T & T
38.26
86355
Northern States Power Fire 71.61
Maint 79.61
Street Lights 610.87
Parks 167.10
Water 288.94
1,218.13
86355
First National - Park Bonds principal& interest
37,653.75
86356
Rauenhorst & Carlson - Retainer 300.00
Alford & Berubel20.00
420.00
86357
Caswell & Tavernier - prosecutions
850.00
86358
TKDA General 2,880.05
Pass Thru 651.60
MSA 92.33
3,623.98
86359
Bathke Co. - Maint. Dept. parts & repair
54.55
86360
Lampert Building Center - Maint. Dept.
90.62
86361
Ruffridge-Johnson - roller rental
400.00
86362
Action Rental - Maint. Dept.
74.00
86363
Barton Sand & Gravel - Maint. Dept.
62.18
86364
T. A. Schifsky - AC mix
220.22
86365
American Typewriter - office supplies
163.56
86366
Satellite - 4 homes flooded
210.00
96367
Communications Specialists - Fire Dept. radio service
310.11
86368
Insta.11ert - Fire dept.
57.98
86369
General, Safety - Fire Truck -grass rig unit
5,540.00
86370
General Communications - radio repair
39.80
86371
Motorola Inc, - Fire Dept. radios
597.39
86372
Davies Water Equipment - Castle Design project
168.20
86373
thru 86384 August 16th payroll
�7,000.00
Totals
$ 74,137,15
LAKE ELMO CITY COUNCIL MINUTES
AUGUST 6, 1985
Mayor Morgan called the meeting to order at 7:03 p.m. in the
council chambers. Present: Armstrong, Christ, Dunn, Mazarra,
Acting Administrator Banister, City Engineer Bohrer and City
Attorney Knaak.
1. Agenda
M/S/P Morgan/Mazarra - to approve the agenda for the August 6,
1985 City Council meeting as amended, 5J. Municipal Aid 5-Year
Update, 7G. Resolution Amendment with Ramsey -Washington Counties
Cable Commission Joint Powers Agreement, 7H. 3-2 Liquor License
for Huff n' Puff Days, and 71. Newsletter Editor.
Minutes
M/S/P Armstrong/Christ - to approve the July 16, 1985 City Council
Meeting Minutes as presented. (Motion carried 4-0-1<Mazarra>).
M/S/P Dunn/Armstrong - to approve the July 24, 1985 Lake Jane
Pumping Public Hearing as amended. (Motion carried
4-0-1<Mazarra>).
3. Claims
M/S/P Christ/Armstrong - to approve claims 86322 thru 86384 as
presented. (Motion carried 5-0).
4. Public Inquiries
A. Rod Toft, 2764 Legion Avenue to discuss problems on Legion
Pond.
Dan Collyard, 2814 Legion Avenue, stated as of July 24, 1985 the
pond elevation was 885.46 which was determined by an independent
survey company hired by the concerned residents of Legion Avenue.
For six families their septic systems are almost inoperable
because of the high water. Some guidelines were suggested and
will be looked into: 1. stop pumping of Lake Jane and any other
bodies of water which contribute to the ground water table, 2.
moratorium for all development of parcels of land adjacent to
Legion Pond between County Road 17 and County Road 15, between
30th St. and the north end of Eden Park, 3. direct the flow of
runoff water from Legion Avenue to a new culvert along 30th St.
connecting to the storm sewer under Cty Rd. 17, 4. fill an area
at the end of culvert between Zetterlund and Johnson as promised
in 1980, 5. check all test wells that City Engineer Larry Bohrer
put in in 1980.
Questions were asked as to what happened to the 201 and the 509
Programs and why hasn't the Watershed District heard of Legion
LAKE ELMO CITY COUNCIL MINUTES AUGUST 6, 1985 Page 2
Pond. Bohrer answered that the 509 will not provide any direct
relief for Legion Pond. In other words, there will be no pipes
coming out of Legion Pond into this downstream system that the
Watershed District is going to construct because they consider the
Legion Pond situation a local concern not a district -wide concern,
whereas, the other chain of lakes the water comes from or goes
through more than one community. The City did request that any
downstream pipe or channel down from Lake Elmo be sized that
conceivably in the future we could put Legion Pond water in there.
Paula Green asked if anything will be done this summer and was
answered that the 509 Program will not be on -going this summer.
5. City Engineer's Report
A. Public Hearing -Russell Anderson, 4891 Olson Lake Trail
for variance to code and Shoreland Permit.
Pursuant to published notice, this public hearing was called to
order by Mayor Morgan at 7:45 p.m. in the'Council chambers.
Mr. Russell Anderson is proposing two improvements to his home at
4891 Olson Lake Trail. Firstly, he would like to replace his
failing drywell with a drainfield, and secondly, he would like to
construct a detached two car garage. Shoreland regulations apply
and variances are requested for the garage setback.
Mr. Anderson feels that the hardship was that there is an existing
stone retaining wall and walkway, etc. that would prevent the
garage from being placed closer to the home. Mr. Anderson has a
statement from his neighbor, Neil Wales, to the south who would be
directly affected stating that they would have no problem with
this variance.
City Engineer Bohrer recommended issuing a shoreland permit for
the septic system improvements in accordance with our revised size
computations and septic tank recommendations previously given.
Actual pert tests must be conducted on the lot if not previously
done.
If a side yard setback variance is granted, it should be
conditioned that the south property line be established by a land
surveyor or other qualified person to the satisfaction of the
building inspector and that no part of the garage, including
eaves, be closer than the setback allowed by the variance.
M/S/P Morgan/Armstrong - to grant a shoreland permit and a side
yard setback to Russell Anderson at 4891 Olson Lake Trail for a
garage of no less than 5 feet from the lot line and conform to the
recommendations of the City Engineer stated in his 8/6/85 letter.
(Motion carried 5-0).
B. Large Lot Subdivision for Gordon and Betty Lundholm,
2737 Lake Elmo Avenue N.
LAKE ELMO CITY COUNCIL MINUTES AUGUST 6, 1985 Page 3
Mr. Lundholm proposes to subdivide his property presently
consisting of two parcels into three lots. The newly created
southerly lot, including existing parcel 0360 would contain 1.5
acres + of which 1.0 acres would be east of Lake Elmo Avenue and
considered to be the buildable portion. The lot which would
contain Lundholm's house would consist of 6.75 acres exclusive of
right-of-way. The easterly lot would contain approximatley 7.35
acres, most of which is covered by Legion Pond.
A concern of the City Engineer was with the creation of an
easterly lot with undetermined building area should not be allowed
until it can be shown it is buildable. The waiver of platting
requirements is a policy decision. The City Engineer reviewed the
contour map and based on this there would be more than an acre of
dry land.
Mr. Lundholm believes the 30 foot wide half right-of-way for
Legion Avenue extension along the east line has been provided ten
years ago and should be in the minutes.
Council will table the division of parcel 0370 until a survey and.
road frontage is presented.
M/S/P Morgan/Dunn- To adopt Resolution 85-25 granting a large lot
subdivision to Gordon Lundholm, 2737 Lake Elmo Ave. N. to increase
the size of parcel 0360 so that it is approximately 1-1/2 acres
and to add the small parcel, 0360 to parcel 0370 where it
rightfully belongs based on the City Engineer's recommendations
stated in his letter dated 7/22/85. (Motion carried 5-0).
C. Rezoning and Large Lot Subdivision for Frank and Arlene
Meyer
and Robert Meyer in Section 3 (off of Keats Ave.).
City Engineer Bohrer stated that there are no variances needed and
has no problem with the rezoning. There are no alternatives
without a variance and when the applicant found out that a
variance would be required for that Mr. Meyer felt that he would
rather not go through the variance procedure and this is the
configuration he came up with.
M/S/P Morgan/Christ - to adopt Ordinance 7972 amending the Lake
Elmo City Ordinance, The Comprehensive Plan and the Zoning Map for
Frank and Arlene Meyer in Section 3. (Motion carried
4-1<Armstrong>).
M/S/P Mazarra/Dunn - to adopt Resolution 85-26 granting the large
lot subdivision for Frank Meyer in Section 3. (Motion carried
4-1<Armstrong-does not like the awkward configuration of the
lots>).
D. Shoreland Permit for Quigley Construction for Lots 3 and 4
DeMontreville Highlands 5th Addition.
These are for two cul-de-sac lots in DeMontreville Highlands 5th
LAKE ELMO CITY COUNCIL MINUTES AUGUST 6, 1985 Page 4
Addition. They can meet all of the requirements of the Shoreland
regulations except lot size. At the time it was platted the lot
size requirement was one acre and this would require a lot size
variance for the shoreland permit. John Stine from the DNR has
indicated that he has no concerns with this application.
M/S/P Christ/Mazarra - to grant a shoreland permit for Quigley
Construction for Lots 3 and 4 DeMontreville Highlands 5th
Addition. (Motion carried 5-0).
E. Simple lot division and site plan approval for Lake Elmo
Physicians Clinic proposed for Lots 1 and 2,
Brookman Addition.
Maplewood Family Physicians already have two clinics and here they
would begin with 2-3 doctors , but it is designed for a four
doctor facility.
The existing building, Stouvenel Bldg., which will remain as a
lease space, and the clinic will be 4,500 sq.ft. and an additional
lease space of approximately 2,600 sq.ft. Presently, the client
is pursuing a possible drug store or some compatible facility with
their building. Rick Christenson feels that the final set of plans
will be in next week to make application for a building permit and
after negotiating with the contractors constrution will be ready
to begin sometime in September.
City Engineer Bohrer stated that it meets all the requirements, no
variances are needed and it's real clean.
M/S/P Christ/Mazarra - To adopt Resolution 85-27 approving the
simple lot subdivision for the Lake Elmo Physicians Clinic
proposed for Lots 1 and 2, Brookman Addition. (Motion carried
5-0).
Bohrer pointed out that the ordinance requires only one principle
structure and what the applicants are hoping to do is by this
facade to tie the buildings together and have that qualify as
meeting this requirements. Christenson commented that it would be
an asset to the community to dress up the existing building and
tie it in with the appearance of these buildings rather than to
spend their budget to tie into it and bring the building up to all
the codes and gut it at this point in time. His clients will
begin by dressing it up on the outside and at a later date, if
tenants left, they would dress it up for the new tenant.
Armstrong pointed out that this building has never been filled.
Christenson was aware of this, but feels that once you get a
clinic here it will generate interest and there is a good chance
that someone would like to open up a drug store.
Bohrer stated when the improvements to Brookman Addition and this
pond were constructed they were designed on the basis of having up
to 67 percent of the lot area being covered with an impervious
surface and this exceeds it somewhat, 70 percent. Since the
LAKE ELMO CITY COUNCIL MINUTES AUGUST 6, 1985
applicant owns the other lot he has proposed to put
restriction on this lot that will provide for that
green space. Christenson said that he had a letter
lawyers drew up regarding this issue.
Page 5
a convenant or
compensating
his client's
There is sufficient area for the septic system of the new
building, but an alternate system is needed for the primary
building and for the existing building. There is sufficient area
for the alternate system for the new building, but he questions
the computations for the alternate for the existing building.
Using the square footages, 58 parking spaces are required. The
original proposal has 56 parking spaces and Christenson sees no
problem with adding two more spaces.
With rearrangement of the lot the highway becomes the front, as
opposed to the side. This makes the building within 20 or 30 feet
off the highway and 50 feet is required for a front yard setback.
Therefore, a front yard setback variance would be required for
that existing due to the rearrangement of the lot lines.
With the entire green area being used up as drainfield, there
would have to be some special requirements for snow removal. The
applicant would have to haul the snow out or plow it out to the
vacant lot because he cannot deposit it on the drainfield.
Bohrer has not seen any drainage plan on how the drainage can get
to the parking lot to the pond. Christenson replied they are
still working on it.
M/S/P Christ/Morgan - to approve the site plan for the Lake Elmo
Physicans Clinic for Lots 1 and 2, Brockman Addition contingent
upon City Engineer Bohrer's recommendations. (Motion carried 5-0).
F. Landfill Contamination discussion with Commissioners
Schaeffer and Evert.
Mike Ayers, Washington County Assistant Director of Public Health,
explained to the Council that there was a temporary stalemate
over the issue of the pumping capacity necessary to service the
area that we determine to be the impact area through our advisory
committee. The Ramsey and Washington Counties have recommended of
200 gal. per min. which would meet the minimum, but the pumping
capacity may be too small. The pumping capacity of 700-900 (gpm)
recommended by City Engineer Bohrer would exceed the minimum
system requirement. In turn, they felt that pumping capacities of
300-370 (gpm) that would adequately service the area and will
propose this to the two county boards.
Morgan asked if there was an agreement for a pumping capacity of
300-370 gal. per minute would be acceptable, what would be a time
table on how quickly we could get started. Ayers replied
contingent on the ability of getting the two county boards
together and a satisfactory resolution on the pumping capacity
issue and those of the city's question of operation maintenance
LAKE ELMO CITY COUNCIL MINUTES AUGUST 6, 1985 Page 6
costs and property owners releasing the counties liability caused
by well contamination could be sometime in September or October.
The estimate for the system to be in operation is 1986.
Ayers was very pleased with the effectiveness of the gradient
control well decontamination system at the landfill. He said one
well is still contaminated and one other shows trace contaminants.
G. Lake Jane Pumping Program
At a July 24 public hearing, the Council explored the following
alternatives: pumping Lake Jane to Shafer Gravel Pit; excavating
Shafer Pit to hold more overflow water; excavating Lake Jane
shoreline, using excess water to irrigate nearby croplands, and
pumping to another location, since the holding capacity of the
Shafer Pit is limited.
The Council discussed pumping Lake Jane overflow to a depression
on Mervin Nippoldt's property, south of the landfill or to
Breschens' Pond, southeast of Lake Jane. City Engineer Bohrer
recommended continued pumping of Lake Jane until December or
depending on weather it might go further. This would also depend
on the elevation of City Park Pond. He estimated by then the
lake's level should be lowered to 922, two feet below flood stage.
Before pumping continues beyond October 1, as permitted by the
Valley Branch Watershed District (VBWD), the city must obtain
permits from the VBWD and the Minnesota Department of Natural
Resources.
Tom Armstrong, 8291 15th St. N., stated that the reason the 509
Program is bogged down is clearly the funding. The 509 Committee
voted to put it on the mill rate and the County Board did not
agree and sent it back. The 509 Committee has not been called for
a meeting and pressure should be put on the VBWD to start holding
meetings at least once a week to get this job done.
Christ stated he would like to see the Lake Jane people petition
and only assess them and not the Olson and DeMontreville lake
property owners.
Morgan suggested that the City Engineer look into pumping into
Berschens' Pond.
M/S/F Morgan/Mazzara - to apply for a permit to pump Lake Jane
overflow to a depression on Mervin Nippoldt's property. (Motion
failed 2-3<Armstrong, Dunn, Christ - too many unknowns so cannot
support it>).
H. Castle Design drainage
City Engineer enlightened the Council that he has been
contacted by one of the residents, Mary Brown, northside of 50th,
and they believe this will cause problems in the spring. They
feel the city should be liable if the swamp should increase in
height because of the closing. Alternative would be to construct
LAKE ELMO CITY COUNCIL MINUTES AUGUST 6, 1985 Page 7
a storm sewer on the east side of the road, but this would be
beyond the capabilities of the maintenance crew. Council will
wait and see what happens.
I. 201 Program - Step 3 Agreement
The Pollution Control Agency has a few comments: they
suggested the duties of the resident engineer and inspectors to be
outlined and wants signatures of TKDA and the City which would
mean that the city has reviewed this cost price summary and the
proposed cost price appear acceptable.
Maynard Eder, 9275 Lake Jane Trail N., brought to the Council
information of grant funds available for a possible effective way
of resolving the water quality problem.
M/S/P Morgan/Armstrong - to authorize Acting City Administrator
Marilyn Banister to sign the 201 sewer improvement step 3
engineering services agreement. (Motion carried 5-0)
The PCA has asked to pass a resolution to contain: that the city
understands what the latest cost estimate is, which was outlined,
to address that the city still desires to proceed, and address
where the local share will come from which will be assessments.
The City Engineer will prepare the document for the Council to
sign.
Bohrer would like to begin the process of selecting an appraiser
and appraising the eight parcels. Council directed him to put out
bids.
J. MSA Update for 5-Yea'r Plan
The State has made a projection on the MSA Funding which
would be $137,570 and Bohrer referred to his handout of the 5-year
plan and how it has been updated because of financial resources.
M/S/P Christ/Morgan - to accept the Municipal State -Aid Street
System 5-year construction plan. (Motion carried 5-0).
6. City Council Reports
7. City Administrator's Report
A. Street Light Policy
Street light policy guidelines which include: a petition
should be presented to the City Engineer for Council
consideration, and 75 percent of residents within 300 feet of
light location agree_ to -pay --installation costs with the City
paying the electric bill as approved.
M/S/P Morgan/Mazarra - to adopt street light policy and procedure
LAKE ELMO CITY COUNCIL MINUTES AUGUST 6, 1985 Page 8
approved dated August 6, 1985. (Motion carried 5-0).
B. Assessment Hearing
On Tuesday, September 10, 1985 at 8:00 p.m. an assessment hearing
for the 1984 street improvements is scheduled.
C. City Administrator - Interview Process
An interview process for the top applicants will be scheduled for
Tuesday, August 20, 1985 at 5:00 p.m..
D. Police Contract with Washington County
The total estimated contract cost is $77,152.47, a 1.59
percent increase over the 1984 contract. This increase is a
result of higher police salaries, clothing allowance and
insurance.
M/S/P Mazarra/Armstrong - to approve the 1985 Washington County
Police Contract. (Motion carried 5-0).
E. Complaint letters from residents.
Representatives of the concerned eight Lake Jane Trail homeowners
were in front of the Council to complain about noise caused by
rowdy parties at a Lake Jane common lot which is owned by the Lake
Jane Access Corporation. Robert Logue, 4388 Jackpine Tr., is one
of the owners of the lot and told the complaintants he was not
aware of the problem until he received a letter from the City and
said the corporation wanted to be good neighbors.
The Council directed City Attorney Knaak to draft a letter to the
lot owners informing them such parties are in violation of the
city noise ordinance.
M/S/P/ Morgan/Mazarra - to extend the Council Meeting to 11:20
p.m. (Motion carried 5-0).
Jan Olson, 5361 Hilltop Ave. N., represented 21 DeMontreville
residents, told the Council bug zapper noise is disturbing their
sleep. According to a section of the noise ordinance, the decibel
level of bug zapprs, measured by the Minnesota Pollution Control
Agency at between 56 to 64 decibels, 150 feet away from the unit,
exceeds the 40 decibel level during the hours of 10 p.m. until 7
a.m, and this ordinance can be enforced. Olson gave out a letter
from the University of Minnesota entomologist Jeffrey Hahn
questioning the mosquito control effectiveness of zappers. The
Council directed the City Attorney to send a similar in violation
letter to the bug zapper offender and to put a notice stating that
bug zappers exceed the noise ordinance in the Newsletter.
F. Gene Seidow - Lake Elmo Molds
This will be tabled for the Council Meeting on August 20, 1985.
LAKE ELMO CITY COUNCIL MINUTES AUGUST 6, 1985 Page 9
G. Resolution amending the Ramsey -Washington Counties Cable
Commission Joint Powers Agreement.
M/S/P Dunn/Morgan - to approve the amendment that deletes
requiring the Commission treasurer and one other officer to sign
checks. (Motion carried 5-0).
H. 3-2 Liquor License for Huff n' Puff Days
M/S/P Morgan/Mazara - to grant a 3-2 liquor license to the Lake
Elmo Jaycees for the Huff n' Puff Days August 8-11, 1985 and to
waive the fee. (Motion carried 5-0).
I. Newsletter Editor
M/S/P Morgan/Dunn - to approve advertising for a Newsletter Editor
in the Ramsey County Review and the White Bear Press. (Motion
carried 5-0).
M/S/P Morgan/Dunn - to adjourn the City Council Meeting at 11:20
p.m. (Motion carried 5-0).
Resolution 85-25 - granting a large lot subdivision to Gordon
Lundholm.
Resolution 85-26 - granting a large lot subdivision for Frank
Meyer.
Resolution 85-27 - granting a simple lot subdivision for the Lake
Elmo Physicians Clinic
Ordinance 7972 - Rezoning for Frank and Arlene Meyer
--------------------------------
Amended 8-20-85
Page 6 - G. M/S/F
Page 7 - I. quality
Page 8 - D. 1.59 percent
Since we do not have time to discuss every point presented, it may
seem that decisions are preconceived. However, background information
is provided for the City Council on each agenda item in advance from
City Staff and appointed Commissions; and decisions are based on this
information and past experiences. In addition, some items may also
have been discussed at previous Council meetings. If you are aware of
information that hasn't been discussed, please fill out a "Request to
Appear Before the City Council" slip; or, if you came late, raise your
hand to be recognized. Comments that are pertinent are appreciated.
Items requiring excessive time may be continued to another meeting.
AGENDA
LAKE ELMO CITY COUNCIL
AUGUST 6, 1985
7:00 p.m.
Meetings Convenes
1.
Agenda
2.
Minutes: July 16, 1985
3.
Claims
7:15 p.m.
4.
Public Inquiries
A. Rod Toft, 2764 Legion Ave. to discuss
problems on Legion Pond.
B. Other
5.
City Engineer's Report
7:30 p.m.
A. Public Hearing - Russell Anderson, 4891
Olson Lake Trail for variance to code
and Shoreland Permit.
7:45 p.m.
B. Large Lot subdivision for Gordon and Betty
Lundholm, 2737 Lake Elmo Avenue N.
8:00 p.m.
C. Rezoning and Large Lot Subdivision for
Frank and Arlene Meyer and Robert Meyer in
Section 3 (off of Keats Ave.)
8:15 p.m.
D. Shoreland Permit for Quigley Construction
for Lots 3 and 4 DeMontreville Highlands
5th Addition.
8:20 p.m.
E. Simple lot division and site plan approval
for Lake Elmo Physicians Clinic proposed
for Lots 1 and 2, Brookman Addition.
----------------------- BREAK -----------------
OVER
8:45 p.m.
9:00 p.m.
F. Landfill Contamination discussion with
Commissioners Schaeffer and Evert.
G. Lake Jane Pumping Program
H. Castle Design drainage
I. 201 Program - Step 3 Agreement
6. City Council Reports
7. City Administrator's Report
A. Street Light Policy
B. Assessment hearing - time and date for
1984 Street Improvements.
C. City Administrator - Interview Process
D. Police Contract with Washington County
E. Complaint letters from residents
F. Gene Seidow - Lake Elmo Molds