HomeMy WebLinkAbout06-21-88 CCMLAKE ELMO CITY COUNCIL MINUTES
JUNE 21, 1988
Acting Mayor Armstrong called the meeting to order at 7:00 p.m.
Present were Armstrong, Graves, Johnson and Moe. Also present were
City Administrator Morrison and City Engineer Bohrer. Absent: Mayor
Christ
1. AGENDA Graves/Moe - To approve the June 21, 1988 City
Council agenda as presented. Motion carried 4-0.
2. MINUTES - JUNE 21, 1988 Graves/Moe - To approve the June 5,
1988 minutes as amended. Motion carried 4-0.
3. CLAIMS Graves/Johnson - To approve claims 90399 thru 90448
as presented. (Motion carried 4-0)
4. LANDFILL UPDATE Dan Novak, co-chair of REAPP, Inc. indicated to
the council that there seems to be some confusion in the communication
between City Attorney Knaak and Charles Dayton. The consensus of the
council was for the City Administrator to clarify with the City
Attorney what information is desired from Mr. Dayton.
5A. CONTINUATION OF VARIANCE REQUEST FOR SIDE YARD SETBACK
AT 10867 33RD ST. - DAVID AND DEBRA GROBNER
Moe/Graves - To remove this variance request from the table. Motion
carried 4-0.
Graves/Johnson - To deny the request for a side yard setback variance
as applicants could not provide a non -economical hardship; and because
the proposed garage could be constructed meeting all required
setbacks. Motion carried 4-0.
5B. SITE AND PLAN REVIEW - ADDITION OF MEDIA CENTER TO LAKE ELMO
ELEMENTARY SCHOOL
Nancy Prince, Lake Elmo Elementary School Librarian explained the
proposed Media addition to the school. The addition will be
constructed on the south side of the existing library and extend into
the existing courtyard. The addition will not increase the student
population.
This application was reviewed by the Planning Commission on June 13,
1988 and recommended for approval. This application was reviewed by
the City Engineer and his conclusion was that since no students will
be added because of this addition, there is no need to review the
septic system. All drainage from the new addition will be disposed of
on the school property, which is in accordance with City Code. And
from an engineering standpoint, this proposed addition meets the City
requirements.
Lake Elmo City Council Minutes - June 21, 1988 Page 2
Graves/Moe - To approve the plans and specifications for the addition
of a media center to the Lake Elmo Elementary School, as on file in
i the city office, based on the recommendation of the Planning
Commission and City Engineer. Motion carried 4-0.
Councilman Johnson stated that he was concerned with the proposal to
the extent that when the 1987 addition was made to the school, the
council was told there would be no more additions, and now this
proposal is before the council. This proposal had to be under
consideration last year when the first addition was made and the
council should have been advised.
5C. PUBLIC HEARING - VARIANCE TO SETBACK FROM OHWM AND SHORELAND
APPLI
Acting Mayor Armstrong opened the public hearing at 7:36 p.m. It was
noted that the notice of public hearing was published in the legal
newspaper and the effected property owners were notified.
It was noted by the council that the existing boathouse does not meet
the 100' setback from the OHWM, but the addition of the proposed deck
would not increase the non -conformity of the boathouse, which has been
in existance since 1940.
There were no residents at this public hearing to speak for or against
this variance request and the public hearing was closed at 7:42 p.m.
Moe/Graves - To grant a variance to the setback from the OHWM for the
construction of a 12 x 16 foot wood deck to the south side of Pierre's
Pier at 2880 Lake Elmo Ave. contingent upon approval from the DNR; as
the applicant has proven a hardship in that the building is existing;
the building is already non -conforming, and the addition of the deck
will not increase the non -conformity of the building. Motion carried
4-0.
NOTE: The DNR responded to this request on June 22, 1988. There
approval is based on there being no further requests for variances, or
requests to screen in or enclose the deck.
6A PUBLIC HEARING 43RD & KIMBRO STREET IMPROVEMENT
Acting Mayor Armstrong opened the public hearing at 7:45 p.m. It was
noted that the notice of public hearing was published in the legal
newspaper and the effected property owners were notified.
City Engineer Larry Bohrer presented the Feasibility Report dated June
16, 1988 for the proposed 1988-89 MSA Improvement of Kimbro Ave. from
47th St. to 43rd St. and 43rd St. from Kimbro Ave. to Lake Elmo Ave.
This report which outlines this project in detail is made part of
these minutes by reference.
Lake Elmo City Council Minutes - June 21, 1988 Page 3
Following the Engineer's presentation, discussion centered around a
request from many residents in the area for a "paved walkway" which
y would keep walkers and bikers off of the main roadway and thereby
create safer conditions.
The Engineer's preliminary estimate to include a paved walkway in this
project is $7,000. However, right-of-way to include this paved
walkway would not be MSA eligible and since there are no funds to
cover paying for this right-of-way acquisition it would have to be
donated by the effected property owners. The concensus of the council
and the residents was to continue working on a solution to allow for a
paved walkway, which if ordered by the council when final figures are
tabulated, could be considered a change order and included in the MSA
Street Improvement Project.
Acting Mayor Armstrong closed the public hearing at 9:00 p.m.
Graves/Moe - To adopt Resolution 88-28 ordering the preparation of
plans and specifications for the 1988-89 MSA Improvements; the
improvement of Kimbro Avenue from 47th Street to 43rd Street and 43rd
Street from Kimbro Avenue to Lake Elmo Avenue, and to request further
study by the City Engineer as to the feasibility and placement of a
paved walkway. Motion carried 4-0.
7A RIGHT-OF-WAY CONDEMNATION - 43RD & KIMBRO IMPROVEMENT
SALLY ZIEBELL
The City Engineer reported that MSA standards require a minimum design
speed of 40 mph. In order to achieve this, a gradual curve of 500'
radius must be constructed to negotiate the 90 degree turn. This
curve will require the acquisition of about 1.5 acres of land from
Sally Ziebell. At its closest point, the centerline of the road would
be 37 feet from the southwest corner of th Ziebell house. This means
the house would be adjacent to the new right-of-way line with no
setback. Past experience with the State Aid variances indicates that
a tighter curve designed for less than 40 mph would not be approved.
The results of proceeding with this road would be to take a house
which presently conforms to setbacks and create a non -conformity.
Also, if the approximately 1.5 acres needed for the curve would be
taken by condemnation, the monetary award for damages woud most
probably include the value of the house. In other words, the City
probably could not acquire the right-of-way for the curve without also
compensating the owners for the value of the house.
In 1987, Penfield Inc. prepared a "ballpark" estimate of right-of-way
and house value for the Ziebell parcel at $82,000. This estimate will
need to be updated to 1988 prices. For the purpose of this estimate
$90,000 plus $10,000 for relocation costs was used. The actual costs
will depend on whether the council will consider the remaining 3 acre
parcel as buildable.
Johnson/Graves - To give conceptual approval for a lot size variance
to Sally Ziebell for the construction of a single family dwelling on
Lake Elmo City Council Minutes - June 21, 1988
Page 4
the three -acre parcel remaining after right-of-way for the curve is
obtained for the 1988-89 Street Improvement Project.
7B DISCUSSION OF OVERLAY/SEALCOAT BUDGET
The City Engineer provided a memo dated June 17, 1988, made part of
these minutes by reference, regarding the MSA Maintenance and Overlay
Budget and the council took the following action:
Graves/Moe - To instruct the city staff to get quotes for the
shouldering of 45th, Julep, 47th and Keats Avenue; To instruct the
city staff to get quotes for the 1988 Maintenance Overlays of Hill
Trail, Jane Road and Jane Court; and to approve the 1988 Contract
Repairs of 39th Street east of Ideal in the amount of $4,000. Motion
carried 4-0.
B. PLANNING COMMISSION RECOMMENDATION REGARDING THE MAXIMUM SIZE
OF ACCESSORY STRUCTURES IN THE RURAL RESIDENTIAL ZONING DISTRICT
At the June 7, 1988 meeting, the City Council charged the Planning
Commission with reviewing the restrictions the city has on the limit
of accessory structures in the RR zoning district. This request was
based on an application before the council for a variance to the 2,000
square foot maximum accessory structure restriction.
The Planning Commission did that at its June 13 meeting and
recommended, unanimously, that the limitations now in force for
accessory structures in the Rural Residential zoning district should
not be changed.
The consensus of the Council was to accept the recommendation of the
Planning Commission.
9. ORDINANCE REGARDING STORMWATER RUNOFF STANDARDS
The Council reviewed the ordinance proposed by the Planning Commission
and City Engineer and reviewed by the City Attorney. Among the
suggestions made by the City Attorney was to incorporate this proposed
ordinance into the city code.
Johnson/Graves - To prepare an ordinance in accordance with the
recommendations of the Planning Commission, the City Engineer and City
Attorney for the proposed "1% Rule". Motion carried 4-0.
10. RESIDENTIAL ESTATES ORDINANCE
The Council reviewed the May 25, 1988 draft of the Residential Estates
Ordinance, along with the report dated June 21, 1988 from the City
Engineer, and the comments received by the staff from Fire Chief Fran
Pott, Maintenance Foreman Dan Olinger, and Captain Green of the
Washington County Sheriff's Department.
It was the consensus of the Council that this proposed ordinance be
reviewed again by the staff and Planning Commission and the Planning
Lake Elmo City Council Minutes - June 21, 1988
Page 5
Commission proceed with a public hearing to consider public input on
this proposed ordinance.
11. VBWD FLOODPROOFING PROGRAM
The City Administrator distributed a letter received from VBWD stating
it is considering implementing a floodproofing program which was
included in their approved 509 surface water management plan.
The VBWD Managers are attempting to formulate a cost-effective process
for making grants to individual homeowners for improvments which meet
VBWD requirements.
It was the consensus of the Council to request a representative from
Barr Engineering to appear before the council and explain this
program.
11B VARIANCE TO NUMBER OF ACCESSORY STRUCTURES IN R1 ZONE
RICHARD TRAVERS, 2151 LAKE ELMO AVE.
At the June 7 meeting, the council held a public hearing on an
application for a variance to the number of accessory structures in an
Rl zone. The applicant had an existing 216 square foot structure, and
wanted to add a 576 square foot garage.
The applicant advised the staff that he will comply with the council's
request to use only a portion of the existing structure by
constructing an interior wall and blocking off a portion of this
building so it cannot be used, thereby negating the need for a
variance.
Graves/Moe - To grant a Shoreland Permit to Richard Traverse, 2151
Lake Elmo Avenue for the construction of a 576 square foot garage.
Motion carried 4-0.
11C NEWSLETTER
The City Administrator advised the council that the City's newsletter
has, in the past been written on a bi-monthly basis. However, due to
workload and shortage of staff, the newsletters have been sporadic.
She recommended that starting in July, the newsletter be prepared on a
monthly basis. The consensus of the council was to approve this
recommendation.
Graves/Moe To adjourn the meeting; time 10:35 p.m. Motion carried
4-0.
Resolution 88-28 - Ordering Plans and Specifications for the
improvement of 43rd and Kimbro.
TOLTZ, KING, DUVALL, ANDERSON
t AND ASSOCIATES, INCORPORATED
ENGINEERS -ARCHITECTS -PLANNERS
SAINT PAUL, MINNESOTA
JUNE 16, 1988
HAS IBIL Ia. REPORT ON
1988 89 MSA IMPROVEMENTS
KI M3RQ 8YEN E cone! AM STREET TO 43RD STREET.
-
AND 43RD STREET FROM KJM�RO AVENUE TO I AKE ELM AVENUE
LAKE ELMD, MINNESOTA
COMMISSION NO-9 50-008
hereby certify that this report was prepared by me or under my direct
supervision and that I am a duly registered Professional Engineer under the
laws of the State of Minnesota.
Larry D. hrer, P.E.
- Registration No. 12120
• :: u u is • ul��l;
• u:: • � is l u 1. 1: • :1 IC
The proposed 1988-89 Municipal State Aid Street improvements are located
on Kimbro Avenue from 47th Street to 43rd Street, and on 43rd Street from
Kimbro Avenue to Lake Elmo Avenue (CSAH 17).
This improvement is the orderly progression of road improvements planned
for this area of the City which began in 1982 with Keats Avenue, and
continued 1984 with 47th Street, Julep Avenue and 47th Street west of
Keats Avenue, and continues in 1988 with 47th Street from Keats Avenue to
Kimbro Avenue.
Land use on this road segment is predominantly agricultural. There are
only three or four residences not associated with a farm or hobby farm.
50% of the road frontage is Green Acres.
43rd Street follows the existing property Iines and is properly located.
Kimbro Avenue meanders slightly and is not uniformly parallel with the
property Iines.. There are a few significant trees on the east side of
Klmbro Avenue at the J. Graupner, R. Krueger, and S. Ziebell properties.
i - . -' ' iM
This 0.88 mile road segment is planned to be improved by grading to widen
the roadbed width to 32 feet. All drainage culverts will be replaced. The
road will be completed by constructing a 32-foot wide gravel base, and a
24-toot wide bituminous driving surface, with 4-foot wide gravel shoulders.
Driveways will be blacktopped to the property line.
The road will be designed for a 40 mph design speed.
i , Curve at Ord and KImbrg
MSA standards require a minimum design speed of 40 mph. In order to
achieve this, a gradual curve of 500t radius must be constructed to
negotiate the 90' turn. This is the same curve as at 45th and Julep,
and at 47th and Julep. This curve will require the acquisition of
about 1.5 acres of land from Sally Ziebell.. At its closest point, the
centerline of the road would be 37 feet from the southwest corner of
the Zlebell house. This means the house would be adjacent to the new
right-of-way line with no setback. Our past experience with State Aid
variances indicates that a tighter curve designed for less than 40 mph
would not be approved.
-2- 9150-008
The results of proceeding with this road would be to take a house
which presently conforms to setbacks and create a non -conformity.
Also, if the approximately 1.5 acres needed for the curve would be
taken by condemnation, the monetary award for damages would most
probably include the value of the house. In other words, the City
probably could not acquire the right-of-way for the curve without also
compensating the owners for the value of the house.
In 1987, Penfield, Inc. prepared a "ballpark" estimate of right-of-way
and house value for the ZlebelI parcel at $82,000. This estimate will
need to be updated to 1988 prices. For the purpose of this estimate
we will use $90,000 plus $10,000 for relocation costs. The actual
costs will depend on whether the Council will consider the remaining
3 acre parcel as buildable.
2. Riaht-of-Wav
Like 47th Street, very little dedicated road easements exist on this
road. The public has a right to continue to use this road, to the
width presently maintained by the City, according to Minnesota
Statues, Chapter 160.05.
Since there are established fences along both sides of this roadway,
and the City has traditionally maintained up to these fences, we
believe the public use and right extends to that area between the
fences. The width between the fences varies from 40 to 60 feet. The
minimum right-of-way width required for State Aid Standards is 66
feet. Therefore, some additional right-of-way is necessary. it is
proposed to purchase the additional right-of-way necessary unless it
can be donated to the City simply to clear up the matter. Our intent
would be to keep the road as close to its present location as
possible.
p7 affil �
This project was initiated by the City Council as part of the City's 10-
Year MSA Construction Program. Because some assessments are anticipated, a
4/5 vote of the Council is required to order the project.
A permit Is required from the Valley Branch Watershed District. Plan
approval Is required from the State Aid Division of MnDOT.
The preliminary assessment roll shows the property owners abutting on or
benefltting from the street, by parcel number. The list also shows the
approximate area of each parcel and the number of future lots each parcel
could be divided Into under present zoning.
_3_ 9150-008
c •�
No dedicated right-of-way exists for these streets. By virtue of
maintained use, the City is entitled only to the roadway and possibly the
ditches. The intent of this project is to obtain a minimum of 66 feet by
permanent easement.
The proposed improvements have been studied and determined to be feasible
and should best be made as proposed.
u
Some additional slope easements and temporary construction easements will
be required from various property owners to properly match existing
driveways and property.
.mpletion
There is a chance that the grading and gravel base portion of the work
could be completed during the 1988 construction season, if necessary right-
of-way can be obtained and the plans approved by MnDOT. The paving will be
completed in the 1989 construction season. If the right-of-way must be,
obtained by condemnation, the entire project would be constructed in 1989.
Estimated Project Cost
Attached to this report is a detailed estimate of construction costs for
the'road improvements. The total estimated project cost includes 10
percent for contingencies and 20 percent for engineering costs. Estimates
and contracts are prepared on a unit price basis. The contractor will be
paid only for the work completed. The estimated cost of the improvements
is itemized as fol lows:
Construction
$191,234
Contingencies
$ 19,123
Engineering
$ 42,071
Land
$ 90,000
Relocation
$ 10,000
Easements
$ 20,000
Appraisals
$ 3,000
Soil Borings
$ 2,000
Legal
$ 3,000
Administrative
$-2J QQ
Total Estimated Project Cost
$382,428
_4_ 9150-008
® Estimated Assessme
'1 It has been past City policy on other State Aid projects to assess only
those costs which are not eligible for State Aid reimbursement. The only
items not eligible for State Aid reimbursement are legal fees for land
condemnation, engineering costs in excess of 18 percent of the
construction cost, and administrative costs. Engineering costs would
exceed this amount If substantial time Is involved in land acquisition or
additional hearings.
Of the total project cost formulated above, it is estimated that MSA funds
will cover $371,228 and the local share will be $11,200. The estimated
assessments, based on the above assumptions, are $750 to $1,000 per lot.
The City's MSA construction account, after completion of 47th Street which
is presently under contract, is estimated to be $495,000.
The City Council should order the improvement of these roads for the
following reasons:
i. This road has been the source of many complaints over the years.
2. This road is in the City's long range MSA plan for construction. -
3. This road carries over 200 cars per day.
4. It has been a long range goal of the City to pave existing gravel
roads. -
5. It is our opinion that Ms. Ziebell is moderately willing to sell.
6. There are adequate funds in the City's MSA account to construct the
project.
7. If the City does not reduce its MSA account to below $300,000, its
allotment will be reduced beginning In 1989.
8. Assessments are minimal.
It is recommended that the City order the preparation of plans and
specifications for the project, and have the formal appraisals prepared on
the right-of-way acquisition.
-5- 9150-008
1988-89 MSA Street Improvements
Klmbro Avenue from 47th Street to Ord Street, and
Ord Street from Kimbro Avenue to Lake Elmo Avenue
Lake Elmo, Minnesota
Commission No. 9150-008
Item Unit
No Description Ouantity Price Amount
1
Clear and Grub Trees
10
EA
$
150.00
$
1,500.00
2
Salvage Driveway Culverts
160
LF
$
5.00
$
800.00
3
Relocate Fence
3,000
LF
$
2.50
$
7,500.00
4
Common Excavation
5,500
CY
$
2.50
$
13,750.00
5
Subgrade Excavation
5,500
CY
$
2.00
$
11,000.00
6
Granular Borrow
5,500
CY
$
5.00
$
27,500.00
7
Topsoil Borrow
200
CY
$
8.00
$
1,600.00
8
Aggregate Base, Class 5
9,630
TN
$
5.00
$
48,150.00
9
Aggregate Shouldering, Class 1
800
TN
$
7.00
$
5,600.00
10
Bituminous Material for Mixture
146
TN
$
150.00
$
21,900.00
11
Recycled Bituminous Base Course
1,620
TN
$
11.00
$
17,820.00
12
Bituminous Wearing Course
1,300
TN
$
12.50
$
16,250.00
13
Tack Coat
720
TN
$
1.20
$
864.00
14
Culverts
200
LF
$
20.00
$
4,000.00
15
Turf Restoration
4
AC
$
1,000.00
$
4,000.00
16
Remove Box Culvert
1
LS
$
3,000.00
$
3,000.00
17
l n5±al l Concrete Cul ygr+
1
I S
$
6,000.00
$
6,000.00
Estimated Construction Cost
$191,234.00
-6- 9150-008
PRELIMINARY ASSESSIVIENT RCLL
1988-89 MSA Street Improvements
Kimbro Avenue from 47th Street to 43rd
Street, and
t- 43rd Street from Kimbro Avenue to Lake
Elmo Avenue
Lake Elmo, Minnesota
_
Commission No. 9150-008
Number of Lots
Possible Under
Parcel No.** Supposed Owner
Area
Zoning
Present Zonina
2300 L. & B. Rieks
38.0
A GAS
i
2502 B. Rieks
26.7
A GA
1
p 2900 B. Rieks
1.0
A GA
0
RLS 54 A L. Berkholtz
3.9.
RR
1
RLS 54 C L. Berkhol tz
1.0
RR
rr
1 RLS 54 B R. Weir
5.0
RR GA
1
RLS 54 D E. Ryan
7.45
RR
i
2350 E. Whitman
19.8
RR
1
t2115 J. Graupner
"5.0
RR
1
2110 S. Zlebell
5.0
RR
1
2100 (N) R. Krueger
14.36
RR
1
1 2100 (S) R. Krueger
33.8
RR
3
2060 N. Krueger 22.8 RR GA 2
�a
2050 S. Pott 15.5 RR i
2055 J. Weir 16.7 RR GA 1
Total Lots 16
- or 10 excluding
Green Acres
* GA = Green Acres
* Parcel numbers preceded by 36-3701.1
-7- 9150-008
OLT2. KING, DUVALL. ANOERSON
TLr
� ^ DA `v \ ND ASSOCIATES, NCORPORATED
NL_EERRS3ARR•••CiiiHITTECTS PLANNERS 25O0AMERICAN NATIONAL BANK BUILDING
SAINT PAUL. MINNESOTA 65101.1993
612/292-A
1"612/292.0003
June 17, 1988 _
Honorable Mayor and City Council
Lake Elmo, Minnesota
Re: MSA Maintenance and Overlay Budget
Lake Elmo, Minnesota
Commission No. 9150-008
Dear Mayor and Council:
At the May 17, 1988.CounciI Meeting, we proposed a budget for the various
maintenance programs to be done under outside contract. The Council
delayed action pending two decisions:
1 Public hearings for Street Overlays scheduled for•June 7, 1988.
2 Assess a portion of Klondike Avenue and 33rd Street
We. have now updated our proposed budget as follows:
Propg sE_xpenditures
1. 1988 Sealcoat Program 3 46,000
2. 1988 MSA Maintenance: -
A. Klondike and 33rd Street -Overlay 8 Ditching $30,100
(Non -assessed portion)
v B. 45th, Julep, 47th and Keats Avenue - Shouldering 511,500__3
5 41,600 {
3. L*1988 Maintenance Overlays - Hill Trail, Jane road, p 4
Jane Court y $ 13,000
+
�' 1988 Contract Repairs - 39th Street east of Ideai�o_�" 1L $ 4,000
5. 1987 Maintenance Overlay - 32nd Street - Lampert to 10• 00
Klondike. Change Order to 201, Contract
$115,100
Total Proposed Expenditures
Honorable Mayor and City Council
Lake Elmo, Minnesota
June 17, 1988
Page Two
�..
Sealcoat fund $ 40,000
1988 MSA Maintenance fund $ 35,652
1988 Patch & Overlay Fund $ 25,000
1987 Patch & Overlay Fund t�75 000
Total Funds Available $125,652 _
The above analysis shows that all of the planned expenditures could be mz
and stliI leave a $10,000balance in the contract maintenance combined
budget. This money could be used for additional contract maintenance whl
has not yet been identified or used to further reduce assessments on
Klondike Avenue and 33rd Street.
The 1988 Seal coat Program is al ready under contract and Is scheduled to +y
begin July 15, 1988. Items 2A and 3 in the above Proposed Expenditures=^
need to be done prior -to seaicoatTng. Since each of these items Is under
$15#000, quotes can be received rather than formal bids. It is recommend
that the City Staff be allowed to receive quotes and have the work in_Ite
2A and 3 above done without further CouncTI review so that the work can b
completed prior to seal coating.
Please bring, for further discussion, your copy of the 1988 Street
RehabilTtation Program Feasibility Study which was used at the last Counc
meeting. _..._ ..
Sincerely yours,
Larry D. Bohrer,
LDB : J
P. E. -
STATE OF
f�l C IE S, 0 7Z'
DEPARTMENT OF NATURAL RESOURCES
PHONENo.296-7523 1200 WARNER ROAD, ST. PAUL, MN 55106 FILE NO.
June 23, 1988
Ms. Mary Kueffner
CITY OF LAKE ELMO
3800 Laverne Avenue North
Lake Elmo, MN 55042
RE: CROMBIE ESTATES 2ND ADDITION, LAKE DEMONTREVILLE
Dear Ms. Kueffner:
Metro Region Waters has reviewed the preliminary plat submitted by
Veronica Crombie to develop 11 lots adjacent to Lake Demontreville.
We have a number of concerns regarding the proposal to create 6
outlots west, of Demontreville Trail. These are all nonconforming lots
which do not meet any of the lot dimensional standards of your
shoreland ordinance. We can see no good reason to provide outlots for
access when the lake has a new public access. We do not feel that the
creation of a bunch of small non -conforming lots meets the intent of
your shoreland ordinance.
We recommend that the land area west of Demontreville Trail be platted
along with the riparian lots or that the area be platted_as__Que_largg .L
outlot containing 1 centralized dock for day use by the residents.
Anot ear alternative might be to use the largest outlot F as the
communal outlot since it is not buildable. It may however be
difficult to keep the public off due to the proximity of the public
road. Platting such as this should be discouraged by the Planning
Commission. -
Thank you for the opportunity to review this proposal. If you have
any questions, please contact me at 296-7523.
Sincerely,
Molly Comeau Shodeen
Area Hydrologist
METRO REGION DIVISION OF WATERS
cc: Bruce Folz
Veronica Crombie
M52/dv
AN EQUAL OPPORTUNITY EMPLOYER