Loading...
HomeMy WebLinkAbout11-15-88 CCMSince we do not have time to discuss every point presented, it may seem that decisions are preconceived. However, background information is provided for the City Council, on each agenda item in advance from City Staff'and appointed Commissions; and decisions are based on this information and past experiences. In addition, some items may also have been discussed at previous Council meetings. If you are aware of information that hasn't been discussed, please fill out a "Request to Appear Before the City Council" slip; or., if you came late, raise your hand to be recognized. Comments that are pertinent are appreciated. Items requiring excessive time may be continued to another meeting. AGENDA LAKE ELMO CITY COUNCIL, NOVEMBER 15, 1988 7:00 p.m. MEETING CONVENES (over) ��t 1. Agenda 2. Minutes: November 1, 1988 3. Claims 4. REAPP REPORT 5. PLANNING/LAND USE/ZONING: A. Apostolic Bible Church: Rezoning from RR to PF B. Shoreland Permit: Roger & Everett Beaubien property located N. of Kelvin Avenue (E. of Sunfish Park) C. Shoreland Permit: David Schwarz 10961 32nd St. N. 6. CITY ENGINEER'S REPORT: A. Final Payment: Lake Area Utility Contracting B. Payment: Valley Paving ('88 Overlay Project) C. Final Payment: Ace Blacktop (part of 33rd & Klondike) 7. CITY ATTORNEY'S REPORT: 8. CITY ADMINISTRATOR'S REPORT: A. Proposed Ord. Amend. - Public Utility Bldgs. B. Canvassing 1988 General Election Returns C. Resolution Approving Application Ski. Trail-' Maintenance Grant D. Administrator's 6 mo. Probationary Period 9. Adjourn FUTURE MEETINGS: Nov. 14 7:30 p.m. Planning Commission 15 7:00 p.m. City Council Nov. 18 11:00 a.m. Wash. Co. Pub. Works (M.Luth, Graves/Johnson) Solid Waste Committee Nov. 24/25 THANKSGIVING HOLIDAYS Nov. 28 7:30 p.m. Planning Commission. Dec. 9 6:30 p.m. Christmas Party (?) LAKE ELMO CITY COUNCIL MINUTES NOVEMBER 15, 1988 Mayor Christ called the City Council meeting to order at 7:03 p.m. in the City Council chambers. Present: Christ, Armstrong, Graves, Moe, City Engineer Bohrer, City Attorney Knaak and City Administrator Morrison. Absent: Johnson. 1. Agenda Delete: 5A. Apostolic Bible Church Add: BE. Cancellation of Dec. 2.0th Council meeting 8F. Christmas Party M/S/P Graves/Moe - to approve the November 15, 1988 City Council agenda as amended. (Motion carried 4-0). 2. Minutes: November 1, 1988 M/S/P Graves/Moe - to approve the November 1, 1988 City Council minutes as amended. (Motion carried 3-0-1 Abstain: Christ). 3. Claims Councilman Moe questioned Attorney Knaak's charge to the City for phone conferences with reporter, Tony Lonetree, on Section 32. Moe suggested that these calls be referred to the City Administrator. M/S/P Armstrong/Graves - to approve the November 15, 1988 Claims #91003 thru #911.05 as presented. (Motion carried 4-0). 4. REAPP REPORT Dan Novak expressed REAPP's thanks to the Lake Elmo residents for the passage of the landfill referendum with a 4-1 vote and suggested the City write a note of thanks to the residents through a direct mailing. REAPP will be sending out a thank you note. The Council decided to extend their thanks through the Newsletter, Cable TV, and in the newspaper. REAPP will be meeting with Representative Long and Senator Merriam to ask for consideration in authorizing legislation deleting process of inventory of sites. Dan reported the EIS is beginning this month; therefore, an engineering firm should be selected. The City will send out a working proposal (consisting of the workscope, time frame, cost, and qualifications) to potential engineering candidates that the City Staff and REAPP have comprised. Consideration will be given to credentials and possible conflict of interests. Attorney Dayton will also be consulted by staff. A list will be compiled by the first of ( the year. LAKE ELMO CITY COUNCIL MINUTES NOVEMBER 15, 1988 PAGE 2 Leslie Davis, Earth Protectors, objected to the selection of Attorney Dayton as Dayton represents a part of the waste industry and finds this a conflict of interest. He feels spending money to hire Attorney Dayton is not in the best interests of the residents. Davis asked the City to use the same selection process of attorneys as the City will use for selecting an engineering firm. 5. PLANNING/LAND USE/ZONING: A. Apostlic Bible Church: Rezoning from RR to PF The Planning Commission tabled their decision on rezoning until their November 28th meeting. B. Shoreland Permit: Roger Beaubien and Everett Beaubien (property located on the north end of Kelvin Avenue) City Engineer Larry Bohrer reported that Roger Beaubien is planning to build a home on a 37 acre tract on the west side of Kelvin Avenue. The property is zoned RR. There is sufficient land for a septic system and two drainfi_eld sites. The proposed structures are approximately 300 ft. from the high water mark of Sunfish Lake and well above the high water mark in elevation. No variances are required. Bohrer reported that Everett Beaubien is requesting to build a home on a 5 acre tract on the north end of Kelvin Avenue and the lot is zoned RR. Of the total 5 acres, about 2..5 acres is dry land above the high water mark. Because of the steep topography, access will be gained by a private easement across Roger Beaubien's property to the west. Bohrer found the following variances were required to build on this 5 acre tract. I. Zoning Code variance for lot size of 5 acres where 10 acres is required in the RR Zone. 2. Zoning Code variance for road frontage of 33 feet where 125 feet is required. 3. Sh.oreland Ordinance variance for structure setback from NOHW of 55 ft. where 200 feet is required in a Natural Environment lake. The staff will look into when the subdivision took place because it may have been when the code required 5 acres rather than 10 acres in Rural Residential zoning. This would then clear up the first two variances. A Shoreland ordinance variance is required and a public hearing must be held. The Council decided that even though Roger Beaubien's shoreland permit could be issued for the 37 acre tract because no variances are required, this approval should wait until the staff talks to Roger/Everett Beaubien for more information on when this subdivision was granted. LAKE ELMO CITY COUNCIL MINUTES NOVEMBER 15, 1988 PAGE 3 M/S/P Moe/Graves - to direct the City Staff to talk to Roger/Everett Beaubien and research this subdivision, if and when it was granted by the City Council, and to set up a public hearing for December 6th for a Shoreland ordinance variance. (Motion carried 4-0). B. Shoreland Permit: David Schwarz 1.0961 32nd St. N. David Schwarz had applied for. a Shoreland Permit to construct a replacement garage for his existing detached garage which is in poor condition. The garage will be located at 10961 32nd St. N. and is along the north shore of Lake Elmo. The existing garage does not meet the required setbacks and this new garage will replace the old one. The applicant proposes 20 feet setback from the street whereas 50 feet is required. This setback does conform to the rest of the garages on the street which are located close to the street because of the steep sloping topography. The proposed garage size is 38' x 2.6' = 988 sq.ft. which is less than the 1,000 SF accessory structure allowed in the code. Bohrer stated a more typical size double car garage such as 24' x 24' might be installed without a side yard variance and not intefere with the septic system. The smaller garage would also leave more room for an alternate drainfield site for the future. The diagram supplied with the application implied that a portion of the drainfi_eld is in the way. Two variances are needed for sideyard setback and setback from the street. No hardship was listed in the application. A public hearing will be scheduled for December 6th. M/S/P Graves/Armstrong - to direct the staff to discuss consideration of a smaller garage with David Schwarz, 10961 32nd St., and to set up a public hearing for a Shoreland Permit and Variances for construction of a replacement garage for his existing detached garage. (Motion carried 4-0). 6. CITY ENGINEER'S REPORT: A. Final Paymnt: Lake Area Utility Contracting City Engineer Bohrer reported the work on Part D of the 201 Project performed by Lake Area Utility Contracting is complete and ready for final acceptance. The Council reviewed Compensation Change Order No. 9 in the amount of (Deduct) $4,030.04 which reduced the original contract amount to the final as -built amount and Final Estimate and Certificate No. 7 in the amount of $1,380.00. M/S/P Graves/Moe - to accept the work for Part D of the 201 Project, approve Compensating Change Order No. 9 in the amount of (Deduct) $4,030.04 and approve Final Estimate and Certificate No. 7 and issue payment of $1,380.00 to Lake Area Utility Contracting. (Motion i carried 4-0). LAKE ELMO CITY COUNCIL MINUTES NOVEMBER 15, 1988 PAGE 4 B. Payment to Valley Paving for 1988 Street Overlay Project City Engineer Bohrer reported the work on the 1988 Street Overlay Project performed by Valley Paving is complete and ready for final acceptance. The Council reviewed the Final Estimate and Certificate No. 1 in the amount of $64,961.45. M/S/P Armstrong/Graves - to accept the work for the 1988 Street Overlay project and to approve Final Estimate and Certificate No. 1 and issue payment of $64,961.45 to Valley Paving. (Motion carried 4-0). C. Final Payment: Ace Blacktop, 33rd St. and Klondike Avenue City Engineer Bohrer reported that street rehabilitation work on 33rd Street and Klondike Avenue will be financed by Municipal State Aid Maintenance funds and by assessments. The work on these streets consist of installation of culverts, ditching, patching, and bituminous overlay. Since all of this work would not be completed in time to assess the project by the September 10 assessment deadline, the staff determined that portion of the project to be financed by MSA Maintenance funds should be completed in 1988, but the portion of the project to be paid by assessments should be delayed until 1989. On November 4•, 1988 quotes were received for the patching on Klondike Avenue and 33rd Street and a bituminous overlay on Klondike Avenue. The work was awarded to Ace Blacktop in the amount of $11,356.70. On. November 8, 1988 all patching and overlay work was completed. A small amount of gravel shouldering remains, but will be completed prior to the November 15th Council meeting. M/S/P Graves/Moe - to approve Partial Payment #1 for Klondike Avenue and 33rd Street patching and Overlay to Ace Blacktop in the amount of $10,288.65. (Motion carried 4-0). 7. CITY ATTORNEY'S REPORT: City Attorney Knaak reported that the Section 32 hearing is scheduled for November 29th at Stillwater and encourages the City Council to attend. 8. CITY ADMINISTRATOR'S REPORT: A. Proposed Ordinance Amendment - Public Utility Buildings At their November 1st meeting, the Council approved the site plan review application of the Northwestern Bell Co., to construct a remote terminal building on the property of Apostolic Church. The Council also directed the attorney and staff to review the existing code to provide for this type of public service building. LAKE ELMO CITY COUNCIL MINUTES NOVEMBER 15, 1988 PAGE 5 ( The Administrator contacted other communities such as; Stillwater, Maplewood, Woodbury, Eagan and found these communities view this type of facility as an essential public service which is necessarily a part of their basic community needs. The Administrator recommended that the Code be amended to incorporate this type of building as a permitted use in all districts, but with provision of site plan review by the Planning Commission and City Council. Councilman Johnson had suggested that impervious service, Landscape and architectual standards be considered as in the General Business District. Councilwoman Armstrong was unhappy with a lease situation involving the NWB building and Apostolic Bible Church. Rose suggested approval by the CUP process should be considered. The surrounding property owners would be notified and a public hearing will be scheduled. With a Site Plan Review the surrounding property owners do not have to be notified. M/S/P Graves/Moe - resolved that the City Attorney and Administrator are hereby directed to draft an amendment to Section 301.130, of the City Code and to include a provision for approval of a Public Service Building by the CUP process in the ordinance, in accordance with the recommendations of the City Administrator, and to be reviewed by the Planning Commission. (Motion carried 4-0). B. Canvassing 1988 General Election Returns For the November 8th General Election, we had a 70% turnout of registered voters in Precinct I (including 304 new registrations), and 83% voter turnout in Precinct II (including 300 newly registered voters), for an overall City wide turnout of 75%. Resolution 88-52 Canvassing Local Returns for the 1988 General Election was provided for the Council's review. M/S/P Armstrong/Graves - resolved that Resolution 88-52 Accepting Administrator's Report and Canvassing Election Returns of City of Lake Elmo General Election of November 8, 1988 is hereby approved. (Motion carried 4-0). C. Resolution Approving Application Ski Trail Maintenance Grant Administrator Morrison requested Council approval to submit a grant application to the DNR for maintenance of our ski trails in Sunfish Lake. The funding, if any, approved by the DNR may be minimal, but funds would help defray the cost of our ski trail grooming contract with Wash. Co. Dependent upon projected costs, the funding requested would be approximately $1500. M/S/P Graves/Armstron.g - resolved that Resolution No. 88-51 Approving Submission of a Grant Application, for a DNR Park Grant, for Ski Trail Maintenance at Sunfish Park, is hereby approved. (Motion carried 4-0). LAKE ELMO CITY COUNCIL MINUTES NOVEMBER 15, 1988 PAGE 6 D. Administrator's 6 month Probationary Period November 16th marked the end of Administrator Morrison's six month probationary period with the City. Morrison requested a motion from the Council to employ her as a permanent employee or release her from the position. Mayor Christ stated he was extremely pleased with her performance as Administrator and would be more than happy to permanently hire Pat as City Administrator of Lake Elmo. The Council concurred and made the following motion: M/S/P Moe/Graves - to permanently hire Patricia Morrison as City Administrator of Lake Elmo; Administrator Morrison will draft an employment contract, to be reviewed by the City Attorney, to be submitted to the Council at the January 3rd City Council meeting. (Motion carried 4-0). E. Cancellation.of December 20th City Council Meeting As past practice, the Council has cancelled the last Council meeting in the month of December. Unless something develops that is urgent and requires a meeting, the Council will not meet on December 20th. M/S/P Armstrong/Moe - to cancel the December 20th City Council meeting. (Motion carried 4-0). F. Christmas Party Mayor Christ and Councilman Graves will not be able to attend the Christmas Party scheduled for Friday, December 9th. Because of commitments due to the holiday season, the Council decided to reschedule the Christmas Party for. Friday, January 13th. M/S/P Graves/Moe - to reschedule the Christmas Party from December 9th to Friday, January 13th, 6:30 p.m. at City Hall. (Motion carried 4-0). Mayor Christ explained he will not be able to attend the December 6th City Council meeting due to business. Since this will be his last Council meeting, Arlyn wanted the Council to know he enjoyed working with them and appreciated all their help. He welcome the new City Council members and wished them the best of luck. M/S/P Moe/Graves - to adjourn the City Council meeting at 8:10 p.m. (Motion carried 4-0). Resolution No. 88-51 Approving Submission of Grant Application, for a DNR Park Grant, for Ski Trail Maint. at Sunfish Part; Resolution No. 88-52 Accept Report on Canvassing Election Returns of City of Lake Elmo General Election of Nov. 8, 1988. CLAIMS TO BE APPROVED AT NOVEMBER 15, 1988 LAKE ELMO COUNCIL MEETING (all claims are within budget unless otherwise noted) 91003 thru Office $ 31.45 91006 Cleaning - Fire Dept. 15.41 $ 46.86 91007 Postmaster - Bulk mai i� ng imbursed by REAPP 209.58 91008 Compost worker 67.50 91009 Mary Kueffner - election bakery and food._ 24.81 91010 thru 91035 Election Judges 1,350.81 91036 Lillie Suburban Newspapers - Legal publications 51.36 91037 ICMA - Annual subscription 60.00 91038 American Typewriter - office supplies 34.14 91039 Hagbergs Country Market - office cleaning supplies 26.25 91040 American Linen - Office bldg maint. 34.53 91041 Bellaire Sanitation - Office dumpster 53.82 91042 Washington Cty, - 1/2 section maps & plat hook 135.00 91043 Rauenhorst Carlson & Knaak - General $ 2,127.95 201 Sewer '148,'50 2,276.45 91044 TKDA - General $ 2,174.20 Pass Thru 1,097.02 Water Dept. 288.41 M.S.A. 2,231.93 201 Sewer 11547.59 7,339.15 91045 Uniforms Unlimited - i� re Dept, clothing allowance 139.70 91046 City of Oakdale - reimbursement for fire call 100.00 91047 Mid -Central - Fire dept. supplies 1,296.60 11048 Astleford International - Fire dept. truck repair 15.30 j1049 Walker Roofing Co. - Fire Station # 1 roof repair 154.94 91050 thru 91069 Firemen 2nd 1/2 compensation 11,256.50 91070 Fire Engineering - Fire Dept, subscriptions 18.95 91071 Brookman Motors - Fire Dept, truck repair 62.30 91072 Streicher's - Fire Dept, supplies 65.25 910.73 Minn. State Fire Dept. Assn, - Annual dues 90.00 91074 Peoples Plus - Fire Dept. gas 52..00 91075 Lake Elmo Oil - Fire Dept. $ 253.04 Bldg. Insp, 123.65 376.69 91076 Hardware Hank - Fire Dept. Maint. Dept. 4&.76 126.90 91077 Thompson Hardware - Maint. Dept, supplies 75.02 91078 Raco Oil & Grease - Maint. Dept. 505.25 91079 Battery & Tire Warehouse - Maint. Dept. truck repair 78.62 91080 Truck Utilities - Maint. Dept, parts & repair 10.00 91081 T.J. Auto Parts - Maint. Dept. parts & repair 41.30 91082 Valley Auto Supply - " it 108.54 91083 The American Stores Semi Parts " " 36.75 91084 Midwest Bolt & Supply - Maint. Dept. 22.57 91085 Matco Tools - Maint. Dept.- drill set 93.25 91086 Junker Sanitation - maint, dumpster 45.00 91087 Amsterdam Printing - maint, dept. 89.46 91088 Arrow Building Center - Maint. Dept. 42.72 91089 Wear Guard - Maint. Dept, clothing allowance 180.95 `1090 Oak Park Hts. Industries - Landfill booklet 629.78 A091 Leonard, Street & Deinard - Landfill legal 695.00 91092 Waldor Pump - Water Dept, new water system control 5,264.00 91093 thru 91105 November 18th payroll 7,095.32 Total $ 40,478.92 a RAUENHORST CARLSON & KNAAK ATTORNEYS AT LAW ROSEDALE CORPORATE PLAZA ' ►g� 2555 LONG LAKE ROAD PC W i;r,,t: ,.,j��;�,,•:.M1.� ROSEVILLE, MINNESOTA 55113 ' l9gg• October 26; 1988 City of Lake Elmo 3880 Laverne Avenue North Lake Elmo, MN 55042 (F) Attention: Marilyn _Re: General FOR PROFESSIONAL SERVICES RENDERED ° DATE AMOUNT DESCRIPTION 09 28/88 .50 Phone conference — client x 2, J. Meyer re Keats (SPC) i 09/29/88 .25 Phone conference — J. Meyer, client re Keats (SPC) .25 Phone conference — B. Manuelli — Title Ins. (SPC) 09/30/88 .50 Phone conference — J Me e C y r, our, re Keats (SPC) 10/03/88 1.00 Prep and review of Council material (FWK) .75 Review and revision of Zoning letter — opinion (FWK) 10/04/88 .1.50 Review and prep for Council Meeting (SPC) 2.50 Attend Council Meeting (SPC) 1.00 Draft of review memo; Office conference with SPC (FWK) 10/05/88 .50 Office conference with SPC; Review notes and materials (FWK) 10/11/88 .75 Phone conference — Councilman Graves; Letter to Council re McCollar; File review (FWK) 10/12/88 1.50 Office conference at City Hall re Zoning issue (FWK) 10/13/88 .50 Phone conference — Personnel (FWK) 10/14/88 .50 Phone conference — client re MSA Street Imp (SPC) 10/18/88 5.00 Draft of letter to P. Morrison; Phone conference — 10/20/88 Council; Prep and attendance at Council meets ng () .25 Phone conference — P. Morrison (FWK) I City of Lake Elmo General File October 26, 1988 Page Two Retainer received 10/07/88 for September services Attorney Hours Covered by Retainer: General legal services Other (Council meetings, etc.) Attorney Fees Not Covered by Retainer: Document drafting & opinions Costs & disbursements Retainer for October TOTAL AMOUNT DUE 500.00 5.50 10.00 15.50 105.00 .00 500.00 605.00 i aeciare, unaer une penalties or iaw, tnat tne above aCCO!,U claim or demand is true and correct. T&ii!ric W. I RAUENHORST CARLSON & KNAAK ATTORNEYS AT LAW ROSEDALE CORPORATE PLAZA 2665 LONG LAKE ROAD ROSEVILLE, MINNESOTA 55113 October 26, 1988 City of Lake Elmo 3880 Laverne Avenue North Lake Elmo, MN 55042 (F) Attention: Marilyn Re: Section 32 FOR PROFESSIONAL SERVICES RENDERED - - 10/20/88 AMOUNT DESCRIPTION _ 45.00 Receipt of Order and Notice of Order from opposing attorney (SPC) 105.00 Research; Draft of Appeal Materials (FWK) 60.00 Review File; Draft Petition (SPC) 90.00 Research; Revise Draft for review; Phone conference J. Lonetree (SPC) 15.00 Serve and File (SPC) 45.00 Word Processing 21.00 Copy of Letter to Client " 10/21/88 62.00 Paid Filing Fee 10/24/88 15. 00 Phone conference - T. Lonetree (SPC) —r5 0D Notice of Hearing date (SPC) 15.00 Conference with FWK (SPC) 45.00 Review petition (FWK) .00 Phone conference- T. Lonetree (SPC) 10/25/88 15.00 Phone conference - P. Morrison (SPC) 323.10 Paid Janet Shaddix for Transcript City of Lake Elmo Section 32 October 26, 1988 Page Two 165.00 BALANCE OUTSTANDING—165.00 Payment Received — Thank You 456.00 ers' Services .00 Total .Lowy Total Paralegal Services 385.10 Costs S Disbursements 45.00 Word Processing Services _ 886.10 TOTAL AMOUNT DUE er the penalties of law, that the above account, claim or I declare, und demand is true and correct. F deric W. Knaak r .1 RAUENHORST CARLSON & KNAAK ATTORNEYS AT LAY/ ROSEDALE CORPORATE PLAZA 2565 LONG LAKE ROAD ROSEVILLE, MINNESOTA 55113 October 26;'1988 City of Lake Elmo 3880 Laverne Avenue North Lake Elmo, MN 55042 (F) Attention: Marilyn Re: Derrick FOR PROFESSIONAL SERVICES RENDERED ' DATE AMOUNT DESCRIPTION -09/26/88 15.00 Phone conference — Administration, Opposing Counsel 09/29/88 60.00 Pick up file materials and review ' 09/30/88 60.00 File review; Cover letter for discussing response 16.35 Paid Dependable Courier BALANCE OUTSTANDING 715.63 Payment Received — Thank You—715.63 Total Lawyers' Services 135.00 s Total Paralegal Services .00 Costs S Disbursements 16.35 Word Processing Services .00 TOTAL AMOUNT DUE 151.35 I declare, under the penalties of law, that he above account, claim or demand is true and correct. rederic W. Knaak aenrxolacr�r�';,xed 0 RAUENHORST CARLSON & KNAAK ATTORNEYS AT LAW ROSEDALE CORPORATE PLAZA 2865 LONG LAKE ROAD ROSEVILLE, MINNESOTA 55113 October 26, 1988 City of Lake Elmo 3880 Laverne Avenue North Lake Elmo, MN 55042 (g) Attention: Marilyn Re: Joseph D. Rogers MIIIIIIIIIIIIIIIIII FOR PROFESSIONAL SERVICES RENDERED - DATE AMOUNT DESCRIPTION 09/30/88 15.00 Phone conference — Gollenbeck office re status 10/04/88 15.00 . Phone conference — Insurance Counsel re status Total Lawyers' Services 30.00 Total Paralegal Services .00 Costs & Disbursements .00 Word Processing Services .00 TOTAL AMOUNT DUE 30.00 I declare, under the penalties of law, that the above account, claim or demand is true and correct. 1� / y J r eric W. Knaak l RAUENHORST CARLSON & KNAAK ATTORNEYS AT LAW - ROSEDALE CORPORATE PLAZA 2665 LONG LAKE ROAD ROSEVILLE, MINNESOTA 55113 istt'i:.tsis3l October 26, 1988 City of Lake Elmo 3880 Laverne Avenue North Lake Elmo, MN 55042 (F) Attention: Marilyn Re: Thomas Armstrong Cix"W FOR PROFESSIONAL SERVICES RENDERED DATE AMOUNT DESCRIPTION 10/20/88 10.00 Word Processing 10/20/88 7.00 Copy of Letter to Client BALANCE OUTSTANDING 15.00 --- Payment Received — Thank You —15.00 Total Lawyers' Services 7.00 Total Paralegal Services Costs & Disbursements .00 .00 Word Processing Services — 10.00 TOTAL AMOUNT DUE 17.00 I declare, under the penalties of law, that the above account, cl m or demand is true and correct, n , Fri eric W. Knaak RAUENHCRST CARLSCN & KNAAK ATTORNEYS AT LAW ROSEDALE CORPORATE PLAZA 2555 LONG LAKE ROAD ROSEVILLE, MINNESOTA 55113 October 26, 1988 City of Lake Elmo 3880 Laverne Avenue North Lake Elmo, MN 55042 (F) Attention: Marilyn Re: Severin 41 I� FOR PROFESSIONAL SERVICES RENDERED DATE AMOUNT DESCRIPTION 09 28/88 30.00 Notice of Deposition; Letter to opposing attorney 09/29/88 10.00 Word Processing 3.50 Copy of letter to client 10/10/88 15.00 Review correspondence from opposing attorney 10/25/88 150.00 Review, prep and attend deposition BALANCE OUTSTANDING 167.50 Payment Received — Thank You—167.50 Total Lawyers' Services 198.50 Total Paralegal Services - .00 Costs & Disbursements .00 Word Processing Services 10.00 TOTAL AMOUNT DUE 208.50 I declare, under the penalties of law, that the above account claim or demand is true and correct. Pfederic W. Knaak r RAUENHORST CARLSON & KNAAK ATTORNEYS AT LAW ROSEDALE CORPORATE PLAZA 2665 LONG LAKE ROAD ROSEVILLE, MINNESOTA 55113 October 26, 1988 City of Lake Elmo 3880 Laverne Avenue North Lake Elmo, MN 55042 (F) Attention: Marilyn Re: Federal Land FOR PROFESSIONAL SERVICES RENDERED - - - - - DATE AMOUNT DESCRIPTION 09/28/88 15.00 Receipt and review of Interrogatories and Production Documents (SPC) 09/28/88 45.00 Review Interrogatories; File review (FWK) 09/29/88 45.00 Begin Draft of answers to correspondence (FWK) Total Lawyers' Services 105.00 " Total Paralegal Services .00 Costs & Disbursements .00 Word Processing Services .00 TOTAL AMOUNT DUE 105.00 I declare, under the penalties of law, that the above �Ccount,claim or demand is true and correct. 14 % /l.4 14 Cie W. RAIJENHORST CARLSON & KNAAK ATTORNEYS AT LAW ROSEDALE CORPORATE PLAZA 2M LONG LAKE ROAD RCSEVILLE, MiNNESOTA 55113 October 26, 1988 City of Lake Elmo 3880 Laverne Avenue North Lake Elmo, MN 55042 (F) Attention: Marilyn Re: McCollar V� mm"n-mi FOR PROFESSIONAL SERVICES RENDERED DATE AMOUNT DESCRIPTION 08/05/88 30.00 Review letter; Phone conference — client 08/23/88 30.00 Phone conference — opposing counsel; File review 08/29/88 30.00 Letter to P. Morrison 08/29/88 5.00 Word Processing 10/24/88 30.00 Review correspondence; File review Total Lawyers' Services Total Paralegal Services Costs & Disbursements Word Processing Services TOTAL AMOUNT DUE 120.00 .00 .00 5.00 125.00 I declare, under the penalties of law, that the above account, demand is true and correct. Fredric W. Knaak RAUENHORST CARLSON & KNAAK ATTORNEYS AT LAW ROSEDALE CORPORATE PLAZA 2565 LONG LAKE ROAD ROSEVILLE. MINNESOTA 55113 October 26, '1988 City of Lake Elmo 3880 Laverne Avenue North Lake Elmo, MN 55042 (S) Attention: Marilyn L Re: 201 Condemnation ; i SERVICES RENDERED ' •�.'�::� - lf.;p"z4iy� FOR PROFESSIONAL ! DATE AMOUNT DESCRIPTION 09/28/88 15.00 File Liens 5.00 Word Processing 3.50 Copy.of letter to client 10/24/88 30.00 Review correspondence from County Attorney; Letter to ( client e 90.00 Paid Land Title for Affidavits 10/25/88 5.00 Word Processing a�tiA. 298.50 a.. BALANCE OUTSTANDING —298.50 --- Payment Received — Thank You 48.50 Total Lawyers' Services .00 ' Total Paralegal Services 90.00 Costs & Disbursements 10.00 Word Processing Services 148.50 TOTAL AMOUNT DUE law, tha the above cco� t, claim or I declare, under the penalties of A demand is true and correct. A / w. �� /� 7 �S. /y8--5-� � � r ___ .___- -ys �" �� � � � . KDAT.OLTZ. KING, DUVALL, ANDERSON `� AND ASSOCIATES, INCORPORATED ENGINEERS ARCHITECTS PLANNERS 2500AMERICAN NATIONAL BANK BUILDING SAINT PAUL, MINNESOTA 65101-I B93 612/292 "00 FAX 612/292 0083 f City of lake Elmo P.O. BOX J Lake Elmo, MN 55042 Date: October 28, 1988 Coimnission Number: 9150-988 For Professional Services in connection with Attendance at City Meetings for September, 1988- Agreement dated February 2, 1988. September 6, 1988 September 20, 1988 L. Bohrer - Council Meeting L. Bohrer - Council Meeting 50.00 50.00 AMOUNT DUE $ 100.00 flGG• a� ! State of Minnesota) ss County of Ramsey ) Ray A. Andrews, being first duly sworn, deposes and says that the foregoing account is just and true, and the services therein charged were actually rendered and of the value therein charged, that the expenses incurred were paid by the affiant and no part of the same has been paid. Subscribed and sworn to before me, a notary public, this 28t.4 day of Octob , 1988• e ,N, MMMM A/V%/W M.MMMMwNA• LI: DA E. SCnCRSY •'� ` NOTARY POPLIC—MINN WA tj RAM%Y COUNTY MY CONIPA. EXPIRES AUG. 10, 1989 wvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvwm • �� r a• •ki •MCe •••••• I W /0Ia a.ui • • M r KDA ANDAT.OLTZ.KING,TES.IN. INCOSON RPORATED AND ASSOCIATES, INCORPORATED JGINEERS ARCHITECTS PLANNERS 2500 AMERICAN NATIONAL BANK BUILDING SAINT PAUL, MINNESOTA 55101 ,1893 612/292 44W FAX 612/292-0083 City of Lake Elmo P. 0. Box J Lake Elmo, MN 55042 Date: October 31, 1988 Camnission Number: 9150-008 For General Engineering Services as listed below, for September, 1988. Authorization dated February 2, 1988. 1. 1988 Street Overlay Protect: Bohrer, L. 17.00 Hrs. @ 22.07 = 375.19 Malszycki, M. 2.00 Hrs. @ 12.98 = 25.96 Stenerson, J. 1.00 Hrs. @ 8.94 = 8.94 410.09 x 2.75 Expenses: L. Bohrer - Travel 2. Brookman 3rd Addition - 39th Street Desion• Bohrer, L. 10.50 Hrs. @ 22.07 = 231.74 x 2.75 3. Jim Douglass Shoreland Permit: Bohrer, L. 2.00 Hrs. @ 22.07 = 4. Barbara Walsh Shoreland Permit: Bohrer, L. 1.50 Hrs. @ 22.07 = 5. Donald Harnish Shoreland Permit: Bohrer, L. 1.50 Hrs. @ 22.07 = 6. Kleis Large Lot Subdivision: Bohrer, L. 0.50 Hrs. @ 22.07 = 7. McGrath Shoreland Permit: Bohrer, L. 1.00 Hrs. @ 22.07 = Expenses: L. Bohrer - Travel 44.14 x 2.75 33.11 x 2.75 33.11 x 2.75 11.04 x 2.75 22.07 x 2.75 = 1,127.75 2.70 = 637.29 = 121.39 f / = 91.05 = 91.05 = 30.36 = 60.69 2.00 Page 2 � • M 8. Gorman Fill Permit: Bohrer, L. 1.00 Hrs. @ 22.07 = Expenses: L. Bohrer - Travel 9. Derrick vs City of Lake Elmo: Bohrer, L. 6.50 Hrs. @ 22.07 = Camnission No. 9150-008 22.07 x 2.75 = 60.69�o 2.50 jC���w" 143.46 x 2.75 = 394.52 Expenses: Quicksilver Express (Inv. copy attached) 7.90 10. Well PLm10 Control and Alarm System: Bohrer, L. 1.50 Hrs. @ 22.07 = 33.11 ./ Lane, F. 3.50 Hrs. @ 20.20 = 70.70 Expenses: L. Bohrer - Travel 103.81 x 2.75 = 285.48 2.93 11. 33rd and Klondike Overlay Proiect: Bohrer, L. 2.50 Hrs. @ 22.07 = 55.18 Prew, T. 0.50 Hrs. @ 13.56 = 6.78 61.96 x 2.75 = 170.39 Expenses: TKDA Truck Mileage (Sept) 6.75 12. Impervious Surface Atlernatives in GB Zone: Bohrer, L. 2.00 Hrs. @ 22.07 = 44.14 x 2.75 = 121.39 13. CSAH Re -designation: .Bohrer, L. 2.00 Hrs. @ 22.07 = 44.14 x 2.75 = 121.39 14. Leroy Howell Septic System Complaint: Bohrer, L. 0.50 Hrs. @ 22.07 = 11.04 x 2.75 = 30.36 15. Street Striping Policy: Bohrer, L. 0.50 Hrs. @ 22.07 = 11.04 x 2.75 = 30.36 16. Review Council Agenda Packets: Bohrer, L. 1.00 Hrs. @ 22.07 = 22.07 x 2.75 = 60.69 AMOUNT DUE ............................... $ 3,459.63 State of Minnesota) ss County of Ramsey ) Ray A. Andrews, being first duly sworn, deposes and says that the foregoing account is just and true; and the services therein charged were actually rendered and of the value therein charged, that the expenses incurred were paid by the affiant and no part of the same has been paid. Subscribed and sworn to before me, a notgry public, this 31,st day of a �A LIAlCA t. SCKOR£Y NOTARY PU'LtC-MIN 'SOTA � i2APPScY COJNP( •`'��"'.•' MY COMM. LXPIRB AUG. 10, 7 r • u • � •N �r ••••••• BI• INVOICE FKD� TALTZ. KING, DUVALL, ANDERSON C AND ASSOCIATES, INCORPORATED ` NGINEERS ARCHITECTS PLANNERS 2500 AMERICAN NATIONAL BANK BUILDING SAINT PAUL, MINNESOTA 55101.1893 612i292-4400 FAX 612/292-0083 City of Lake Elmo P. O. Box J TakA Elmo, M 55042 Date: October 28, 1988 Coimnission Number: 9325-01 For Professional Services in connection with the 1989 NSA Improvements - 43rd and Kimbro for September, 1988. Authorization approved at City Council Meeting on June 21, 1988. Personnel: Classification; Billing Rate: Anderson, C. Technician 2.50 Hrs. @ 17.88 = 44.70 lkhrerDavies, L. J. Senior Engineer 14.50 Hrs. @ 60.69 = 880.01 Senior Engineer 1.00 Hrs. @ 79.06 = 79.06 AMOUNTDOTE ................................... $ 1,003.77 State of Minnesota ) ss County of Ramsey ) t Ray A. Andrews, being first duly sworn, deposes and says that the foregoing account is just and true; and the services therein charged were actually rendered and of the value therein charged, that the expenses incurred were paid by the affiant and no part of the same has been paid. Subscribed and sworn to befoie me, TOLTZ, =G, DUVAM, ANDERSON a notary public, this 28th day of AND ASSOCIATES, INCORPORATED r nnnnnAN✓NNVNM�'�n.a"TMMMMnMr URDA E. SCN.CREY y2 r NOTARY PUBLIC—NtlfilivESOTA `\•,�. RAMSEY COUNTY 5 MY COIAM. EXPIRES AUG. 10, 1989 ZV ■ Y TKDA -.JGINFFR.9 AD,, 1`rvrv1=na City of Like Elmo P.O. Box J Like Elmo, MN 55042 TOLTZ.KING.DUVALL,ANDERSON AND ASSnnier cc •.....____._. 25W AMERICAN NATIONAL BANK BUILDING SAINT PAUL, MINNESOTA 55101.1893 612/292 4400 FAX 612/292 0083 Date: October 28, 1988 Ccurnnission Number: 9016-02 For Professional. Services in connection with the 1987 MA Improvements - 47th Street for September, 1988. Authorization approved at City Council Meeting on July 21, 1987. MRSTRUCTION PHASE: Actual Salaries: Rohrer, L. Hilger, A. Prew, T. 19.00 Hrs, @ 22.07 0.50 Firs, @ 7.65 2.50 Hrs. @ 13.56 Reimbursable Expenses: L. Bohrer - Travel T. Prew - Travel State of Minnesota County of Ramsey ss 419.33 3.83 33.90 457.06 x 2.5 = 1,142.65 73.13 12.38 AMOUNT DUE $ 1,228.16 acccount iA Andrews, beitrue; and ng first duly sworn, deposes and says that the foregoing rendered and of the value thernine services therein charged were actually Laid by the affiant and no ��led, that the expanses incurred were part of the same has been paid. Subscribed and sworn to before me, as notary public, this 28th day of 198 . nn.■ Oct f LsNon E. sale Yet NOTARY FURLIC—P+dP!NiSOTA RAMS"np E fry t IdY CO!AM. EX'r'.f2e5 AUO. 10, 19119 u V\'a�MV V VFW° TOLM, MG, UJVAM, ANDER.SON AND ASSOCIATES, INCORPORATED riiL � T.OLTZ. KING. DUVALL. ANDERSON iiA AND ASSOCIATES. INCORPORATED 111 NGINEERS ARCHITECTS PLANNERS 25W AMERICAN NATIONAL BANK BUILDING SAINT PAUL, MINNESOTA 55101 1893 612/292 44W FAX 612/292-0083 City of lake Elmo P.O. Box J Lake Elmo, MN 55042 Date: October 28, 1988 Commission Number: 8566-01 For Professional Services in connection with the Step 3 Engineering Services . related to the proposed Wastewater Facilities Improvements for September, 1988 Agreement dated November 5, 1985. Direct Labor: Bohrer, L. 7.00 Hrs. @ 22.07 = 154.49 Fick, D. 2.00 Hrs. @ 6.00 = 12.00 Prew, T. 30.00 Hrs. @ 13.56 = 406.80 573.29 Indirect Costs - 130% = 745.28 Direct Non -Salary Costs: 1,318.57 D. Fick - Travel 5.63 T. Prew - Travel 48.39 1,372.59 Fixed Fee = 175.00 AMOUNT DOTE .............................. $ 1,547.59 State of Minnesota) ss County of Ramsey ) Ray A. Andrews, being first duly sworn, deposes and says that the foregoing account is just and true; and the services therein changed were actually rendered and of the value therein changed, that the expenses incurred were paid by the affiant and no part of the same has been paid. Subscribed and sworn to before me, TOM, KING, DUVALL, ANDERSON a no public, this 28th day of AND ASSOCIATES, INCORPORATED 1988. An u �NIDA E. SC.HMY . z Y`•R✓},6.','t NOTARY"UULIC'MINNESOiA 2 RAWM P1 `GcIII➢f Sy 2 MY COMM. E;S'I S Ai1G. 10, 1909 7j vwVWwwVVMiVVVVVVVVVI/VVVVVIMV A LAW OFFICES LEONARD, STREET AND DEINARD A PARTNERSHIP INCLUDING PROFESSIONAL CORPORAtIONS SUITE 1500 100 SOUTH FIFTH STREET MINNEAPOLIS. MINNESOTA 55402 CONFIDENTIAL City of Lake Elmo 3880 Laverne Avenue North Lake Elmo, Minnesota 55042 Attention: Ms. Patricia Morrison, Administrator October 28, 1988 12370-11817 42233 FED. I.D. 41-1431093 -------------------------- For professional services rendered through September 30, 1988 in connection with City of Lake Elmo v. Washington County and Metropolitan Council, including the following: 9/02/88 EGS Review information received from Dan 0.75 82.50 Novak; review memorandum; prepare response. 9/12/88 CKD Office conference regarding status; 0.25 31.25 EGS office conference regarding status. 0.25 27.50 9/13/88 CKD Office conference regarding status. 0.25 31.25 9/15/88 EGS Telephone conferences with Patricia 0.75 82.50 Morrison; prepare report; review correspondence received from Lake Elmo City Attorney. 9/16/88 EGS Telephone conference with Patricia 0.50 55.00 Morrison; office conference regarding status. 9/17/88 EGS Complete research; prepare 2.00 220.00 correspondence. 9/19/88 EGS Prepare correspondence to Washington 1.25 137.50 County; office conference regarding status. 9/23/88 EGS Prepare correspondence to Patricia 0.25 27.50 Morrison. *continued on next page* Page 2 City of Lake Elmo Attorney/Paralegal Charles K. Dayton Ellen G. Sampson LAW OFFICES LEONARD, STREET AND DEINARD A PARTNERSHIP INCLUDING RN.1" 5510NAL CORPORATIONS SUITE 1500 100 SOUTH FIFTH STREET MINNEAPOLIS, MINNESOTA 55402 CONFIDENTIAL TO THE FOREGOING . . October 28, 1988 12370-11817 42233 Hours Rate Amount 0.50 125.00 62.50 5.75 110.00 632.50 . . . . . . . . . . . . . . $695.00 TOTAL INVOICE: $695.00 ********************** Statement of Account *********************** Beginning balance as of 10/14/88 2,306.25 Current invoice 695.00 Payments since 10/14/88 0.00 Adjustments since 10/14/88 0.00 TOTAL BALANCE DUE: $3,001.25 DISBURSEMENTS, IF ANY, NOT YET. BILLED WILL APPEAR ON A LATER STATEMENT PLEASE RETURN ACCOUNTING COPY WITH YOUR REMITTANCE I - T.OLTZ, KING. DUVALL, ANDERSON i.i�}, iiirrrDDA �t AND ASSOCIATES, INCORPORATED ENmWEERS ARCHITECTS PLANNERS 25M AMERICAN NATIONAL BANK BUILDING SAINT PAUL, MINNESOTA 55101 1893 612/292-"00 - FAX 612/292 0083 December 2, 1988 Honorable Mayor and City Council Lake Elmo, Minnesota Re: Final Payment 33rd Street and Klondike Avenue Patch and Overlay Lake Elmo, Minnesota Commission No. 9150-008 Dear Mayor and Council: The work on 33rd Street and Klondike Avenue, patching and overlay by Ace Blacktop, is complete and ready for final acceptance. Enclosed for your review is Compensating Change Order No.i in the amount of $9.40 which increases the original contract amount to the final as -built amount, and Estimate and Certificate No. 2 (Final) in the amount of $1,077.45. Action Requested: 1. Accept the work for patching and overlay on 33rd Street and Klondike Avenue. 2. Approve Compensating Change Order No. 1 in the -amount of $9.40. 3. Approve Estimate and Certificate No. 2 (Final) and issue payment of $1,077.45 to Ace Blacktop. This money should come from the 1988 MSA Maintenance Funds. Sincerely yours, Larry D. Bohrer, P.E. LDB : a dh Enclosures 2 (Final) November 22 Z9 88 9150-008 Com. No Cert. No. St. Paul, Minn., City of Lake Elmo, Minnesota This Certifies that Ace Blacktop For Klondike/33rd Patching & Overlay One Thousand Seventy—seven and Is entitled to 45/100 Dollars-------------------------'—""'{y� 1,077.45 being Owner Contractor final estimate for partial payment on contract with you dated Nov. 4 19 ss Received payment in full of above certificate. CONIRACLOR TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED ENGINEERS AND ARCHITECTS 2500 American National Bank Bldg. St. Paul, Minnesota 55101 -Ar /_-- Larry D ohrer, P.E. Qrrr-APIrill_ATtON OF ACCOUNT CONTRACT PLUS EXTRAS PAYMENTS CREDITS Contract price plus extras All previous payments All previous creditsExtra r1l,356 70 10,288 65 40 — No. Change Order No. 1 (Compensating) ,. ,< ,. .. Credit No. — 11 .1 11 .1 ,1 11 1,077 45 — — AMOUNT OF THIS CERTIFICATE Totals Credit Balance 11,366 10 11,366 10 — — There will remain unpaid on contract after payment of this Certificate 0 00 — 11,366 10 11,366. 10 TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED Engineers -Architects -Planners St. Paul, Minn. Nov. 22 19§$, Comm. No. 9150-008 Change Order No. i To Ace Blacktop for Klondike/33rd Patch lna 8 Overlay for Lake Elmo Minnesota - You are hereby directed to make the following change to your contract dated November 4 , 19 88. The change and the work affected thereby is subject to all contract stipulations and covenants. This Change Order will (Increase) (deeree9e) (ne+-elrange) the contract sum by Nine and 40/100----------------- -------------------------------------------- ------- Dollars I$ 9.40 ). This is the final compensating change order which adjusts the contract to the actual quantities installed: Item Contract Quantity Unit Net No Descriptlon Qua ntiJyj to Date +/- Price Chance 1 BIT BASE COURSE PATCH-KLONDIKE 496.0 SY 496.0 0.0 6.70 0.00 2 BIT BASE COURSE PATCH-33RD 525.0 SY 502.0 - 23.0 6.70 - 154.10 3 BIT MIX FOR OVERLAY - KLONDIKE 158.0 TN 159.5 + 1.5 17.00 + 25.50 4 BIT MATERIAL FOR OVERLAY 9.5 TN 8.8 - 0.7 140.00 - 98.00 5 BIT TACK COAT - KLONDIKE 100.0 GA, 100.0 0.0 2.00 0.00 6 CRUSHED LIMESTONE AGGREG SHLDR 15.0 TN 26.8 + 11.8 20.00 + 236.00 Net Change Order + 9.40 Amount of Original Contract Additions approved to date (Nos. - Deductions approved to date (Nos. Contract amount to date Amount of this Change Order (Add) Revised Contract Amount (Bedtte+) (Net-Ghenged) Approved CLt:� of Lake Elmo, MN Owner Date Approve Contractor Da to TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED ByLJ Larry Bohrer, P.E. White - Owner* Pink - Contractor* Blue - TKDA* Yellow - Field. Goldenrod - Department Green- TKDA Main File I *Only copies needing signatures. TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED Engineers-Archltects-Planners Saint Paul, Minnesota 55101 PERIODICAL ESTIMATE FOR PARTIAL PAYMENTS FINAL Estimate No._2_ Period Ending Nov. 22 19_aQ_ Page 1 of 1 Comm. No.150-008 Protect Klondike/33rd Patchino & Overlay Original Contract Amount Location Lake Elmo Minnesota $ 11.356.70 Contractor Ace Blacktop Total Contract Work Completed $ 11,366.10 Total Approved Credits $ Total Approved Extra Work Completed $ Approved Extra Orders Amount Completed $ Total Amount Earned This Estimate Less Approved Credits Less ,_Q_ % Retained Less Previous Payments Total Deductions Amount Due This Estimate Contractor Ace Blacktop u .. . •• 1 $ 1.077.45 Date Engineer "5t! z" ` Date Larry D Bohrer, P.E. ESTIMATE NO. 2 (FINAL) KLONDIKE/33RD PATCHING 8 OVERLAY LAKE ELMD, MINNESOTA COMMISSION NO. 9150-008 ITEM NO. DEtCRIPTION 1 BIT BASE COURSE PATCH-KLONDIKE 2 BIT BASE COURSE PATCH-33RD 3 BIT MIX FOR OVERLAY - KLONDIKE 4 BIT MATERIAL FOR OVERLAY 5 BIT TACK COAT - KLONDIKE 6 CRUSHED LIMESTONE AGGREG SHLDR QUANTITY UNIT PRICE COST 496.00 Sy 6.70 3,323.20 502.00 SY 6.70 3,363.40 159.50 TN 17.00 2,711.50 8.80 TN 140.00 1,232.00 100.00 GA 2.00 200400 26.80 TN 20.00 536.00 9 11,366.10 0 rrKD TOLT2. KING. DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED ENGINEERS ARCHITECTS PLANNERS 2500 AM ERICAN NATIONAL BANK BUILDING SAINT PAUL. MINNESOTA 55101-1893 612/292-"00 FAX 612/292-0083 December 2, 1988 Honorable Mayor and City Council Lake Elmo, Minnesota Re: 1988 MSA Maintenance Expenditures Lake Elmo, Minnesota Commission No. 9150-008 Dear Mayor and Council: In 1988, the City requested that 255 of its total MSA allotment be available for maintenance. This was done in an effort to reduce the City's total fund balance and avoid a penalty. In 1988, the City received $35,652 to be used for maintenance of WA streets. Prior to December 31, the City Engineer must file an Annual State Aid Maintenance Report with the City and the Commissioner of Transportation. The attached report is for your review and approval. The City Council should accept the 1988 State Aid Maintenance Report by motion. Sincerely yours, z� Larry D. Bohrer, P.E. LDB : J Enclosure December 2, 1988 1988 Maintenance Apportionment $ 35,652.00 Expenditures 1. Tree trimming on 47th Street (MSAS 104) $ 180.00 2. Gravel Shouldering on 45th Street, Julep Avenue, 47th Street, and Keats Avenue (MSAS 104 & 105) Contract with Tower Asphalt $ 8,607.53 3. Sealcoating on Jamaca Avenue, 42nd Street, 45th Street, Julep Avenue, and 47th Street (MSAS 1 02,1 03,1 04) Contract with Allied Blacktop through Washington County $ 13,737.38 4. Bituminous Patching on 33rd Street and Klondike Avenue and Overlay on Klondike Avenue (MSAS 101) Contract with Ace Blacktop $ 11,366.10 5. Tree Removal on 33rd Street (MSAS 101) Contract with Timberline Tree Service $ 1,450.00 6. Paint Striping on Jamaca Avenue, 42nd Street, 45th Street, Julep Avenue and 47th Street (MSAS 102,103,104) Contract with Washington County $ 427.83 TOTAL MSA MAINTENANCE EXPENDITURES $ 35,768.84 ■ • Pay T.OLTZ. KING, DUVALL. ANDERSON i3 rr11 iii�.///i i AND ASSOCIATES. INCORPORATED ENGINEERS ARCHITECTS PLANNERS 2500AMERICAN NATIONAL BANK BUILDING SAINT PAUL, MINNESOTA 55101-1893 612/292 44M FAX 612/292.0083 December 2, 1988 Honorable Mayor and City Council Lake Elmo, Minnesota Re: 1989 MSA Maintenance Request Lake Elmo, Minnesota Commission No. 9150-008 Dear Mayor and Council: The City should request that 25% of its 1989 State Aid allocation be designated for Maintenance to further reduce the City's large MSA fund. The City's 1989 allocation is estimated to be $159,426; therefore, the estimated 1989 Maintenance portion is $39,856. Action Requested The City Council should pass the attached resolution. Sincerely yours, Lllaar y D. Bohrer, P.E. LDB Q Enclosure p RESOLUTION 88—�3 LAKE ELMD, MINNESOTA WHEREAS, Minnesota Rules for State Aid Operations Chapter 8820.1400 allow a Municipality to receive a maintenance allocation greater than the minimum provided the Municipality files a request not later than December 15 of the preceding year and provided the Municipality file a detailed annual maintenance expenditure report at the end of the year; and WHEREAS, the City of Lake Elmo desires to receive a maintenance allocation for 1989 equal to 25% of its total allotment. NOW, THEREFORE, BE IT RESOLVED THAT: The City of Lake Elmo does hereby request that its maintenance allotment for 1989 be equal to 25% of its total 1989 allotment. Adopted by the City Council on December 6, 1988. Arlyn Christ, Mayor ATTEST: Patricia Morrison City Administrator C KDAry T.OLTZ, KING, DUVALL, ANDERSON mow! AND ASSOCIATES, INCORPORATED ENGINEERS ARCHITECTS PLANNERS 25M AMERICAN NATIONAL BANK BUILDING SAINT PAUL, MINNESOTA 56101 1893 612/292 4400 FAX 612/292-0083 December 2, 1988 Honorable Mayor and City Council Lake Elmo, Minnesota Re: 201 Project - Evaluation Report Lake Elmo, Minnesota Commission No. 8566-05 Dear Mayor and Council: All systems constructed under the 201 Project were operational by December 31, 1987. The grant requires that these systems shall be monitored for one year thereafter and the Engineer shall prepare a One Year Evaluation Report. Based on this report, the Engineer must certify that the project is adequately treating sewage in accordance with the State Permit and that the project is operating as designed. The project will be evaluated against the following criteria: 1. That the project has been completed In accordance with approved plans and specifications and change orders. 2. That there wil I be sufficient funds available to provide for adequate operation and maintenance of the project, as provided for in the Wastewater Service Charge Ordinance and Sewer Service Charge System. 3. That there is a sufficient number of trained and capable operating/maintenance personnel available to provide adequate operation and maintenance of the project. 4. That the project is being operated and maintained in conformance with the approved operation and maintenance manual. 5. Evidence that the project is in compliance with the applicable SDS permit; specifically, evidence that the systems are adequately treating septic tank effluent. This will be accomplished in the following manner: A. Each owner wit I be contacted by means of a malted questionnaire soliciting any problems or questions they may have on their system. All questions or problems will be followed up with a telephone call or field visit where 'appropriate. X Honorable Mayor and City Council Lake Elmo, Minnesota December 2, 1988 Page Two B. 25% of individual on -site systems and all individual off -site, or clustered, systems w it I be inspected In the f iel d. At that time, all inspection and access covers will be removed and the system checked for uneven distribution of effluent, differential settlement, or other evidence of poor performance. Observation of ground surface wil I be made to determine if excessive surface wetness or breakout has occurred. C. Oakland School system and Old Village Remote D are fitted with groundwater monitoring wells. Groundwater will be sampled and analyzed in accordance with the Groundwater Monitoring Plan. We will be presenting the report at the Council meeting. Because the Council does not plan to meet again in December and since we must certify the project on December 31, 1988, we will ask the Council to approve the Evaluation Report. rzaammice - oe The City Council should approve the One Year Project Evaluation Report and direct the City Engineer to submit the report by December 31, 1988. Sincerely yours, Larry 0. Boh rer, P.E. LOB:j Com. No 9150-008 Cert. No. 1 St. Paul, Minn, November 15 19 88 To City of Lake Elmo, Minnesota Owner This Certifies that Ace Blacktop Contractor For Klondike/33rd Patching & Overlay Ten Thousand Two Hundred Eighty-eight and Is entitled to 65/100 Dollars--- ----------------------------- ($ 10,288.65 being 1st estimate for partial payment on contract with you dated Nov. 4 198s TOLTZ, KING, DUVALL, ANDERSON Received payment in full of above certificate. AND ASSOCIATES, INCORPORATED ENGINEERS AND ARCHITECTS 2500 American National Bank Bldg. CONTRACTOR ,SStt. Paul, Minnesota 55101 19 0l = .!�g &A.,2 Larry D Bohrer, P.E. RECAPITULATION OF ACCOUNT CONTRACT PLUS EXTRAS PAYMENTS CREDITS Contract price plus extras 11,356 70 All previous payments 0 00 All previous credits _ Extra No. Credit No. AMOUNT OF THIS CERTIFICATE 10,288 65 Totals 11 356 70 10 288 65 Credit Balance — — There will remain unpaid on contract after payment of this Certificate 1,068 05 11,356 70 11,356 70 TOL-Z, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED Engineers -Architects -Planners Saint Paul, Minnesota 55101 PERIODICAL ESTIMATE FOR PARTIAL PAYMENTS Estimate No.__J— Period Ending Nov. 15 19-- Page 1 of 1 Comm. No.9150-008 Prof ect Klondlke/33rd Patching & Overlay Original Contract Amount Location Lake Elmo Minnesota $ 11.356.7 0 Contractor Ace Blacktop Total Contract Work Completed $ 10,830.10 Total Approved Credits $ Total Approved Extra Work Completed $ Approved Extra Orders Amount Completed $ Total Amount Earned This Estimate Less Approved Credits Less 5 % Retained Less Previous Payments Total Deductions Amount Due This Estimate Contractor Ace Blacktop En, neer dlLt^"p �' _ " Larry D Bohrer, P.E. E E=[]�:Y]t:3•� Date Date ESTIMATE NO. 1 KLONDIKE/33RD PATCHING & OVERLAY LAKE ELM), MINNESOTA COMMISSION NO. 9150-008 ITEM NO. DESCRIPTION QUANTITY UNIT PRICE COST 1 BIT BASE COURSE PATCH-KLONDIKE 496.00 SY 6.70 3,323.20 2 BIT BASE COURSE PATCH-33RD 502.00 SY 6.70 3,363.40 3 BIT MIX FOR OVERLAY - KLONDIKE 159.50 TN 17.00 2,711.50 4 BIT MATERIAL FOR OVERLAY 8.80 TN 140.00 1,232.00 5 BIT TACK COAT - KLONDIKE 100.00 GA 2.00 200.00 6 CRUSHED LIMESTONE AGGREG SHLDR 0.00 TN 20.00 0.00 10,830.10 TULTZ, KING, DUYN-L/ ANDER30N AND ASSOCIATES, INCORPORATED CITY OF LAKE ELVAQ, MINNESOTA EP8 PROJECT NO, C-271411 SAINT P8UL, M|NNEI0TA PARTS A. B. C - ON -SITE SEPTIC SYSTEMS PART D - OFF -SITE AND 0.1-LECTOR SEPTIC SYSTEMS | hereby certify that this report was prepared by me or under my direct supervision and that / am a duly registered Professional Engineer under the laws of the State of Minnesota. Lorry D. Bohrer, P.E. Registration No. 12120 MM ONE YEAR PROJECT CERTIFICATION WASTEWATER FACILITIES IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA EPA PROJECT NO. C-27 141 1 PARTS A, B, C - ON -SITE SEPTIC SYSTEMS PART D - OFF -SITE AND COLLECTOR SEPTIC SYSTEMS A. TRAINING, OPTIMIZING AND DIRECTING OPERATION OF THE FACILITY Names of persons who provided operator training and were responsible for optimizing and directing the operation of the facility: Larry Bohrer, P.E., TKDA, Inc. Thomas Prew, E IT, MPCA Certificate No. 1233, TKDA, Inc. Terry Estenson, Tri-State Pump and Equipment, Contractors Rep Larry Bohrer, P.E., TKDA, Inc. Thomas Pray, E IT, MPCA Certificate No. 1233, TKDA, Inc. B. PROJECT PERFORMANCE STANDARDS 1. The project has been completed in accordance with the approved plans, specifications and change orders. See attached certification from contractors. 2. There is and will be sufficient funds available to provide for adequate operation and maintenance of the project, as provided for in the Wastewater Service Charge Ordinance and Sewer Service Charge System. The Wastewater'Service Charge Ordinance and Sewer Service Charge System were adopted by the City CounclI on March 1, 1988. The City has begun collecting sewer service charges in 1988. 3. There is a sufficient number of trained and capable operating/maintenance personnel available to provide adequate operation and maintenance of the project. Dan Olinger, Maintenance Foreman, holds a Class D operator's license and has attended the MPCA on -site school. Mike Bouthllet, Maintenance Worker, also hold a Class D operator's license and has attended the MPCA on -site school. 4. The project is being operated and maintained to oonformance with the approved operation and maintenance manual. -2- 8566 5. Evidence that the project is in compliance with the applicable SDS permit; specifically, evidence that the systems are adequately treating septic tank effluent. This will be accomplished in the following manner: a. Each owner will be contacted by means of a mailed questionnaire soliclting any problems or questions they may have on their system. All questions or problems will be followed up with a telephone call or field visit where appropriate. Response. Attached is the information and questionnaire which was sent to each of the 131 participants in the 201 Program. Each owner (and tenant in the case of rental property) received an as -built drawing, pump literature, information on how a septic system works, notification that all tanks must be pumped every two years, and a "troubleshooting" guide. Of the 131 questionnaires mailed out, we have received only 14 responses to -date. Of the 14 responses, only one required a follow up field visit. We will continue to follow up on the questionnaires as they arrive. b. Individual on -site systems and all individual off -site, or clustered systems, will be inspected in the field. At that time, all inspection and access covers will be removed and the system checked for uneven distribution of effluent, differential settlement, or other evidence of poor performance. Observation of ground surface wll I be made to determine if excessive surface wetness or breakout has occurred. Response. The field inspection of the system is still on- going and will be until the middle of December. Most of our time has been concentrated so far on the cluster system. The following is our evaluation of the cluster systems: 1) Old Village Remote A - Legion Avenue The pump station has been operating at 23% of its design capacity and the drainflei d is operating at 16% of its capacity. These percentages will increase to about 28% and 20% respectively when Dan Collyardts house is occupied. 2) Old Village Remote B - Lisbon Avenue Townhouses Based on water meter readings, the system is operating at about 18% of its design capacity. 3) Old Village Remote C - 32nd Street Based on water meter readings, the system Is operating at 23% of its design capacity. -3- 8566 4) Old Village Remote D - 34th Street Water meter readings and pump running time meters indicate the pump station is operating at about 65- 70% of design capacity and the drainflelds are operating at 50% capacity. Presently one of the pumps at Remote D was drawing more amperage than it should and caused an alarm. Upon investigation it was determined that the pump should be replaced. It was replace under warranty. 5) Old Village Remote H - VFW Water meter readings indicate the pump station is operating at 92% of its design capacity and the seepage beds are operating at 50% of design capacity. 6) Tri-Lakes Remote A - Mike Severin Visual inspections of the mound system indicate no soft ground or surface seepage. 7) Trl-Lakes Remote B - Triple Mound Visual inspections of the mound system indicate no soft ground or surface seepage. 8) Tri-Lakes Remote C - Pat Scovil Visual inspections of this bed system indicate the bed is not used to capacity. 9) Tri-Lakes Remote D - Jane Road Visual inspections of the dralnfield indicate it is operating at 16% of its design capacity. During the year both the existing drainflelds were mobilized and then alternated to the new drainflelds. Visual observations of the drainflelds indicate they are operating below design capacity. A mechanical problem was discovered in the pump station shortly after the flow was switched to the new drainflelds. Because one of the new drainfields was at an elevation lower than the pump station, it was found that sewage was siphoning past the check valve and f I ow 1 ng to the drai of lel d without the pump running. This was discovered because of the low running time on the pump clocks. A small drain hole was drilled in the forcemain inside the station to act as a vacuum break and the system now functions as designed. -4- 8566 Water quality samples in October, 1987, prior to system operation, and again in October, 1988, after 10 months of operation, indicate that the water quality is well within drinking water standards. However, the 1988 analysis found low levels of benzene, ethyl benzene, tetrahydrofuran, and toluene. These compounds are not normally found In sewage. The School District is conducting more tests to try to determine the origin of these compounds. —5— 8566