HomeMy WebLinkAbout04-20-93 CCMAPPROVED MINUTES: 5-4-93
LAKE ELMO CITY COUNCIL MINUTES
APRIL 20, 1993
Mayor John called the council meeting to order at 7:08 p.m.
in the City Council chambers. PRESENT: John, Mottaz, Conlin
(Arrived 7:15 p.m.), Johnston, Johnson, City Engineer
Bohrer, City Attorney Filla, and Administrator Kueffner.
1. AGENDA
Delete: 6B. 201 System User Fee
Add: 4B. Handout on summary of A.C.O. Salary, 5C. Discussion
on rezoning MnDOT property, 6A. Letter Received from
resident on Legion Avenue, 7C. Report on Branch & Tree
Chipping, 9C. Request by Solid Waste Committee Member.
M/S/P Mottaz/Johnston - to approve the April 20, 1993 City
Council agenda as amended. (Motion carried 4-0).
2. MINUTES: April 6, 1993
M/S/P Johnston/Johnson - to approve the April 6, 1993 City
Council minutes as amended. (Motion carried 5-0).
MINUTES: March 30, 1993
M/S/P Mottaz/Johnson - to approve the March 30, 1993 council
minutes as amended. (Motion carried 2-0-3: Abstain: Conlin,
Johnston, Johnson).
MINUTES: March 27, 1993
M/S/P John/Mottaz - to approve the March 27, 1993 council
minutes as presented: (Motion carried 2-0-2: Abstain
Johnson, Johnston).
3. CLAIMS
M/S/P Mottaz/Conlin - to approve the April 20, 1993 Claims
#1493 thru #1520 as presented. (Motion carried 5-0).
4. OLD BUSINESS:
A. Street Standards, Request for Modifications to
Engineering Standards Adopted 10/15/91
The City received a memo from Chuck Nelson, President of
Nelson Properties, Inc., developer of Rolling Hills, asking
the City to reconsider the 9-ton design requirement for
rural and urban street sections and explained his rationale
in his memo.
LAKE ELMO CITY COUNCIL MINUTES APRIL 20, 1993 2
The City Attorney referred to his letter dated May 12, 1992
indicating the Preliminary Plat for Fox Fire Manor was
approved May 7, 1991. The city street standards regulations
were approved on October 15, 1991. The Final Plat for Fox
Fire Manor was scheduled for approval on May 18, 1992.
State Statute states developers receive a one year
moratorium on new city regulations after the preliminary
plat was approved.
Rolling Hills Preliminary Plat was approved December 17,
1991 so the city street standards adopted in October, 1992
were in place before the Preliminary Plat for Rolling Hills
was approved. The reasons why it took so long between
submittal and preliminary and final approval had nothing to
do with the City of Lake Elmo, but issues such as location
of the road.
The engineer for the developer stated they will review and
verify that the road plans submitted for preliminary plat
approval were according to the old street standards.
M/S/P Conlin/Johnson - to deny the request of Chuck Nelson
President of Nelson Properties Inc., for modifying the 1991
Engineering Standards for Rolling Hills. (Motion carried 5-
0).
B. Animal Control
(1) Letter from Animal Control Officer dated
March 26, 1993
M/S/P Johnson/Conlin - to direct the staff to prepare an
Ordinance to the Animal Control Section Regulating cats
(Motion carried 4-1: Mottaz:enforcement of this cat
ordinance will be impossible to achieve).
(2) Pay Increase for Animal Control Officer
Approval of 1993 Animal Control Contract
M/S/P Mottaz/Johnson - to approve the same 1993 Animal
Control Contract Mike Smith has with North St. Paul.
(Motion carried 3-2: Conlin: For budgeting purposes,
interested in developing a monthly flat rate, Johnston: we
should follow the recommendation of the City Administrator).
If there is a desire to modify this contract, this will be
reviewed at the end of the year after the animal control
ordinance has been publicized.
LAKE ELMO CITY COUNCIL MINUTES APRIL 20, 1993 3
5. PLANNING/LAND USE & ZONING:
A. Shafer Mining Conditional Use Permit
Scott Spizak, Shafer Mining, stated he would be willing to
water further than the pit area for dust control, look into
placement of a stop sign at the end of the driveway, and he
will cooperate and confer with Larry Bohrer regarding the
Jamaca Avenue Road Improvement. Spizak had not received any
complaints on the amount of dirt left on Jamaca Avenue, but
indicated concerned residents should call him anytime.
M/S/P Johnson/Johnston - to approve the annual review of the
Shafer Mining CUP without additional conditions to the
permit. The City will review Shafer's performance during
1993 and consider additional conditions next year if the
performance is unsatisfactory. (Motion carried 5-0).
B. E.A.W. for Reconstruction of 10th Street
Gloria Knoblauch, 9181 31st St. N., stated she was opposed
to a 4-lane highway on 10th Street because of the loss of
wetlands. With the traffic now, and with very little
increase of traffic over 20 years, a 2-lane with shoulders
would be acceptable. She did not believe the County's
traffic projections.
Susan Dunn, 11018 Upper 33rd St., and Steve DeLapp, 8468
Lake Jane Trail, responded to the EAW prepared by Washington
County Public Works, and this response is made part of these
minutes.
Todd Williams, 3025 Lake Elmo Avenue N., presented his
comments and questions on the EAW for this project and
suggested alternatives; such as, rerouting the road around
Armstrong Lake or simply building a 2-lane road with wide
shoulders are made part of these minutes.
Mayor John asked that all of their comments on the EAW be
submitted to Washington County.
Because the Council had concerns and they were not
adequately addressed in the EAW as thoroughly as they should
have been, the Council requested additional input into the
EAW or in the alternative an EIS is required in this area.
Mayor John asked the council to prepare their comments in
relation to the EAW by Friday in such a way they can
assemble a coherent submission to Washington County.
LAKE ELMO CITY COUNCIL MINUTES APRIL 20, 1993 4
M/S/P Mottaz/Johnson - to draft a letter indicating the
Council has reviewed the EAW, found it to be inadequate and
inaccurately addressed some issues as shown in the list of
findings; therefore, in view of these errors and concerns
which were not addressed in the EAW, the city requests
Washington County Board to justify these statements in a
more thorough EAW, and failure to do so, the City requests
an EIS. Each council member will submit a list of their
concerns by Friday morning. (Motion carried 5-0).
5C. Discussion on MnDOT property in Lake Elmo
The MnDOT property is currently zoned Rural Residential and
the FLUM designates it Urban Office Commercial. Council
member Johnston suggested the Planning Commission explore
alternative zoning uses for the MnDOT property.
M/S/P Johnston/Conlin - to request the Planning Commission
suggest proper zoning applicable to the MnDOT property that
remains in Lake Elmo and call a public hearing. (Motion
carried 5-0).
6. CITY ENGINEER'S REPORT:
A. 1993 Seal Coat & Crackfill Program
The City received a letter from David Bucheck, 2301 Legion
Avenue N., indicating the road is beginning to look worse
and is requesting the Council to consider this street for
repair and overlay during 1993,
M/S/P Johnston/Johnson - to authorize the city staff to
solicit bids for sealcoating through the Washington County
sealcoat Program. (Motion carried 5-0).
M/S/P John/Mottaz - to authorize the city staff to advertise
for bids for the 1993 crackfilling. (Motion carried 5-0).
M/S/P Johnson/Johnston - to authorize the city staff to
prepare a feasibility report for the 1993 overlay program,
schedule a public hearing for the June 1st, 1993 City
Council meeting, and request the engineer to prepare
different alternatives for assessments for the next council
meeting. (Motion carried 5-0).
B. Water Rate Review for Old Village System
Larry Bohrer reported we have positive fund balances for
both our operating fund and our newly created watermain
replacement fund and recommended no change in rates for
1993.
LAKE ELMO CITY COUNCIL MINUTES APRIL 20, 1993 5
M/S/P Mottaz/John - to adopt Resolution 93-16, establishing
the water service rates for the "Old Village" system.
(Motion carried 5-0).
Water Rate Review for Lake Jane System
Larry Bohrer reported the city lost $3,799 this year on the
water system. Reasons for this loss are:
1. Oakdale is billing us $2.00/month/connection along
with the $0.79/1,000 gallons of water used. This extra
$2.00 charge was not figured in when calculating rates.
2. The 1992 water rates are below actual cost to allow
residents to become accustomed to paying a water bill.
3. Residents are still learning to correctly read their
meters and turn in their meter cards.
To balance the water rates with the expenses, Bohrer
recommended raising the water rate to $1.25/1,000 gallons.
M/S/P Mottaz/John - to adopt Resolution 93-17, establishing
the water service rates for the "Lake Jane" system in lieu
of new negotiations on the $2/month connection charge with
the Oakdale City Administrator. (Motion carried 5-0).
The City Administrator will send a letter on the water rate
increase to the affected residents.
7. CITY ATTORNEY'S REPORT: None
8. CITY COUNCIL REPORTS:
Mayor John reported he attended the work session with the PZ
on Highway 36.
Councilman Johnson provided a report on branch and small
tree chipping in Lake Elmo and asked for comments by the
Council, staff, various committees be submitted to the
Council by the next council meeting. Johnson asked the City
Administrator to have the Maintenance Foreman check out the
equipment in Lakeville for this particular firm and make a
recommendation.
Councilman Mottaz asked the status of the following items
for the next council meeting: (1) PF Zoning, (2) '
Recodification, (3) Junk yard on Hill Trail N., (4) Who has
keys to the City Hall --do we have a policy on keys, and (5)
Start a program to repair wood council chairs.
LAKE ELMO CITY COUNCIL MINUTES APRIL 20, 1993 6
9. CITY ADMINISTRATOR'S REPORT:
A. Liquor License Request: Guardian Angels Church
M/S/P Conlin/Johnston - to adopt Resolution No. 93-18,
issuing a Temporary On -Sale Intoxicating Liquor License for
Guardian Angels Church for April 23, May 15, May 22, 1993.
(Motion carried 5-0).
B. Request by Solid Waste Commission Member
M/S/P Johnston/Conlin - to approve the expenditure of $350
for Margaret Carlson, Solid Waste Commission Member, to
attend the BioCycle National Conference on Composting and
Recycling, May 12-14 at the Hyatt Regency Hotel in
Minneapolis. (Motion carried 5-0).
M/S/P Conlin/Johnson - to adjourn the City Council meeting
at 11:40 p.m. (Motion carried 5-0).
----------------
Resolution No. 93-16, A Resolution Establishing the water
service rates for the "Old Village" system
Resolution No. 93-17, A Resolution Establishing the water
service rates to $1.25/1,000 gallons for the "Lake Jane"
system in lieu of new negotiations on the $2/month
connection charge with the Oakdale City Administrator
Resolution No. 93-18, Issuance of a Temporary On -Sale
Intoxicating Liquor License for Guardian Angels Church for
April 23, May 15, and May 22, 1993
List of Claims for Approval
or the period 04/16193 to
04/20/93
04116/93
CLAIM
TOTAL
ACCOUNT
ACCOUNT
TO WHOM PAID
FOR WHAT PURPOSE
DATE
NUMBER
CLAIM
NUMBER
AMOUNT
STILLWATER 6AZETTE
ANNUAL SUBSCRIPTION A LEGAL PUB
04/20/93
1493
170.00
100-41506-200
91.00
100-41500-351
19.00
BELLAIRE SANITATION
OFFICE DUMPSTER
04/20193
1494
65.91
100-41506-400
65.91
GENERAL OFFICE PRODUCTS
OFFICE SUPPLIES
O4/21193
1495
53.38
106-41600-200
53.38
AMERICAN LINEN SUPPLY
OFFICE BLDG MAINT
04/20193
1496
38.55
110-41500-400
38.55
MENARDS
OFFICE BLDG MAINT
04/20/93
1497
25.71
100-41500-400
25.71
WASHINGTON COUNTY TREAS.
TRUTH IN TAXATION COSTS
O4120/93
1498
297.46
110-41500-200
297.46
NAGBERG'S COUNTRY MARKET
OFFICE BL0G NAINT
04/20193
1499
12.10
100-41500-410
12.10
FOUR SEASONS SERVICES
OFFICE BLDG NAINT
04/20193
1600
14.36
110-41500-460
14.36
TKOA
FEBRUARY EN6INEERIN6
04126/93
1501
6,930.77
100-41930-380
2,448.46
402-41930-300
3,843.14
;'''J rw
411-41930-310
117.66
803-41930-300
520.91
MCCOMBS FRANK ROOS ASSOC,, INC.
MARCH PLANNER
54126193
1502
607.30
100-41910-300
531.30
803-41910-300
16.00
'woo-,r
PATRICK FORCIEA
BILLING FOR LEGISLATION
$4120193
1503
846.08
100-41600-300
840.00
LEONARD, STREET G DEINARD
LEGISLATIVE LOBBYING
04/20/93
1504
1,076.25
100-41600-380
1,076.25
ASTLEFORD EQUIPMENT CO.
FIRE DEPT TRUCK REPAIR
04120193
1505
79,39
106-42200-220
79.39
CLAREY'S SAFETY EQUIPMENT
FIRE DEPT SUPPLIES
O4/20193
1506
17.94
100-42200-217
17.94
ROSEVILLE RADIO
FIRE DEPT RADIO SERVICE
04120/93
1507
13.05
100-42200-323
13.05
LAKE ELMO FIRE DEPARTMENT
FIRE DEPT SUPPLIES
44/20/93
1508
71.68
100-42200-217
71.68
F 'AND FORD TRUCK SALES
FIRE DEPT TRUCK REPAIR
04/20/93
1549
35.13
108-42200-220
36.13
A,..0T. OF NATURAL RESOURCES
FIRE DEPT SUPPLIES
O4/20/93
1510
135.16
100-42200-217
135.16
BATTERY 6 TIRE WAREHOUSE
FIRE G MAINT OEPTS TRUCK REPAIR
04120/93
1511
95.28
100-42200-220
92.16
+
100-43100-221
3.12
LAKE ELMO OIL
FUEL-FIRE,BLOG INSP,MAINT,PARKS
64(20193
1612
2,674.79
108-42200-212
201.57
100-42400-331
118.76
��^U
100-43100-212
2,210.96
108-45200-221
43,50
GOVERNMENT TRAINING SERVICE
BLDG CODE SEMINAR
04/20/93
1513
25.00
111-42400-207
25.00
ST CROIX ANIMAL SHELTER
MARCH IMPOUNDING
04/20/93
1514
555.31
100-42700-413
555.31
JUNKER SANITATION
NAINT DEPT DUMPSTER
04/20193
1615
74.55
110-43100-223
74.55
TJ AUTO PARTS
NAINT DEPT EQUIP REPAIR
04/20/93
1516
75.16
100-43100-221
75.16
GOPHER STATE ONE -CALL
NAINT DEPT NISC
04/28193
1517
5.00
100-43110-223
5.60
EARL F. ANDERSEN, INC.
MAINT DEPT-SPEED LIMIT SI6NS
O4/20/93
1518
129.29
100-43164-226
129.29
OAKDALE, CITY OF
MARCH WATER PURCHASED
94/20193
1519
692.77
611-49400-250
592.77
MINN. DEPT. OF REVENUE
QUARTERLY WATER CONNECTION FEE
04/20/93
1521
320.00
601-49400-216
328.00
TOTAL 14,931.29 14,931.29
14,931.29 14,931.29
Susan Dunn
11018 Upper 33rd St.
Lake Elmo, MN 55042
612-777-0197
Steve C. DeLapp
8468 Lake Jane Trail
Lake Elmo, MN 55042
612-777-2345
April 20, 1993
This document is a resident response to the EAW prepared by the Washington
County Public Works Department regarding an "improvement" for CSAH 10 from
1/2 mile east of Inwood Ave.to I-694. In particular, the response challenges the
proposed design east of Helmo Ave. In this stretch of CSAH 10, the County Public
Works Department is attempting to replace a deteriorated, 22 foot wide, two-lane
road with a four -lane divided highway having similar design and the impact of
State pTH-5 from Ideal Ave. to Stillwater Boulevard.
VIA e
This response includes comments on misleading, inaccurate, or unfounded
statements in the EAW and suggests a balanced solution (Proposal No. 6) which
addresses issues of traffic volume, destruction of the wetlands and woodlands,
effects on adjacent land uses. In addition, comments are provided on issues of
metropolitan significance such as regional transportation, public transit, and
extension of the MUSA line.
Proposal No. 6, located in the Cities of Oakdale and Lake Elmo will extend the
existing design for CSAH 10 from Hadley Ave. to I-694, east to Helmo Ave. In
addition, the grading for a pedestrian trail will be included. Proposal No. 6
includes a 1/4 mile transition east of Helmo Avenue from a four -lane highway
with a raised concrete median to a two-lane road with 12 foot wide lanes, 8 foot
bituminous shoulders, and concrete curbs to CSAH 13 (also known as Ideal Ave.
North). Supplemental left and right turn lanes will be constructed at all agreed
upon intersections. The posted speed for this work will be reduced to 45 mph to
increase lane capacity and to reflect the increasingly urban location.
Three years ago most of the privately owned parcels in Sections 32 and 33 were
annexed from Lake Elmo to Oakdale with the expectation of expedited commercial
development. A Walmart discount store proposed for a site just west of Helmo was
canceled and no other commercial development has been announced. A low
density housing project by Good Value Homes is being proposed for land that was
formerly planned for mixed commercial/high density residential by Lake Elmo,
Proposal No. 5 by Washington County Public Works Department, would relocate
390,000 cubic yards of material and alter 38 acres. The Proposal would effectively
destroy the adjacent seasonal wetlands defined by vegetation such as pussy
willows and cattails west of Armstrong Lake and totally re -configure the Lake.
Proposal No. 6 will substantially reduce the impact on all wetlands and will
provide remediation with a 2:1 ratio for the loss of all wetlands, including seasonal
wetlands. Proposal No. 5 would provide remediation with a 1 1/2 to 1 ratio only for
the losses to Armstrong Lake. Proposal No. 6 will balance the mitigation
requirements equally between both participating Cities instead of creating
compensating wetlands only in Lake Elmo. Mitigation design at Armstrong Lake
will follow design parameters provided in the March 1993 EAW by WCPWD.
However the impact will be substantially reduced because the paved road width
will be only 40 feet compared with approximately 88 feet.in WCPWD Proposal 5.
Because Proposal No. 6 provides curb and gutter instead of slopes and ditches, the
impact on wetlands and woodlands is substantially reduced. No more than 50 feet
of clearcut width will be required. Proposal No. 5 will have a clearcut width of
over 150 feet.
Proposal No. 6 will include a full allowance for landscaping. Trees and shrubs
will be planted beyond the concrete curbs on either side of the 40 foot wide road.
Roadsides will be planted with native prairie grasses and a native wildflower mix
with an interim crop of annual oats to reduce runoff and improve initial visual
concerns. This work will be coordinated with the landscaping staff of MnDOT.
Proposal No. 6 is in full compliance with the Comprehensive Plans of Lake Elmo
on that portion within Lake Elmo. Oakdale jurisdiction includes the north half of
CSAH 10 for 1/2 mile east of I-694. Lake Elmo's jurisdiction includes all the road
on the south half of CSAH 10 and the north half of CSAH 10 for 1/2 mile west of
Inwood Ave. The 1990 Lake Elmo Comprehensive Plan reads as follows:
County Road 70 (Minnehaha Avenue) has the potential of becoming
a route between West lakeland, Woodbury and Oakdale,
paralleling the Freeway. The City would oppose any proposal by
the County to make this another major east west thoroughfare
! like TH 5, which has proven to be damaging to the cohesiveness
of the City and the safety of the residents.
The Wahington County Public Works Department has written that Proposal 5 is
not part of a plan to extend a 4 lane divided highway east into West Lakeland.
Conversely, the County has stated to the Lake Elmo City Council and the Lake
Elmo Planning Commission that this design would gradually be implemented to
the east with work to begin outside the 1993-1997 Capital Improvement Program.
During the reconstruction of I-94, Federal funds were used to make Inwood Ave.
into a four land divided highway. The road, which was built about 5 years ago, is
functioning at less than 25% of design capacity.
CSAH 10 and CSAH 13 are often used as a route between Woodbury and Oakdale.
Traffic has diminished as retail businesses have developed in Woodbury adjacent
to I-494, eliminating the need for some of its residents to shop in Oakdale. Oakdale
has shopping malls on either side of CSAH 10, just west of I-694. The mall to the
north failed as the "Oakdale Outlet Mall" and was mostly vacated a second time in
anticipation of demolition in favor of a Walmart. This transfer was cancelled and
the mall remains largely vacant. Across the street to the south, a mall is
anchored by Rainbow Foods and K-Mart. The K-Mart has never generated traffic
anticipated by its parking lot, and the parking lot at the Rainbow has seen a
dramatic drop in traffic since a new Rainbow was built 4 miles to the south in
Woodbury.
In April 1993, all the land inside the MUSA on the south side of CSAH 10 from
Helmo Ave to Inwood has been changed in the Future Land Use Map from Urban
Office Commercial to Low Density Residential since being annexed from Lake
Elmo to Oakdale. The land outside the MUSA was shown on the Lake Elmo
Future Land Use Map as 3 acre residential. Oakdale is suggesting a golf course.
The net result will be reduced traffic increase on CSAH 10.
Traffic:
The Spring 1992 AADT on CSAH 10 between Helmo and CSAH 10, measured by
Strgar, Roscoe, Fausch was about 3,800. The September 1992 AADT measured by
the State of Minnesota was 4,650. Both traffic counts were omitted from Figure 1
CSAH 10 AADT Counts and Trend Line in the S-R-F Study prepared for the
County. Instead, a 20 year projection for CSAH 10 traffic growth from CSAH 13 to
Helmo is provided by extrapolating 8 earlier counts starting with 2,900 in 1980 and
ending with 5,100 in 1990. The 2000 count is projected as 8,600 and 2010 as 11,500.
This is easily within the upper limits of a two lane road, especially if additional
turn lanes are provided.
However, the actual projection should not include traffic counts when
construction projects on County 14, Fourth Street, or I-94 were diverting traffic to
CSAH 10 as in 1983, 1988, and 1989, or when traffic was diverted away from CSAH
10 as in the Spring of 1992. The exaggerated numbers are as so extreme that in
1982 the AADT was 2,800, in 1983 up to 5,600 (1,000 higher than 1992) and in 1984
back down to 3,100. In 1986 the count stayed steady at 3,100, but in then next count
in 1988 it more than doubled to 6,900. Discounting the irregular numbers, the
realistic straight line projection for 2010 is 7,900.
The downside risk of taking Alternate 6, and saving most of the associated
wetlands, keeping the highway speed a level consistent with the residential
development planned for the area is very low. The risk in building a 4 lane divided
highway is that it would destroy the ecological value of the lake and adjacent
seasonal wetlands, have a $2.8 million up front cost, have much greater
maintenance costs, increase the impervious surfaces by a factor of 3, and probably
end up as substantially underutillized as CSAH 13 between I-94 and 15th Street
and State Highway 5 from Ideal to Jamaica.
Proposal No. 5 would create an uncontrolled intersection with a convergence of 16
traffic lanes. There is no safe model for traffic flow with this size intersection
without signalization. Correction of this omission will require Lake Elmo share
with Oakdale a $100,000 cost.
Costs:
After spending less than $350,000 to resurface and provide paved shoulders for the
3 1/2 miles of CSAH 10 east of Inwood Avenue, the Washington County Public
Works Department is now proposing to spend $2,800,000 for re -construction of one
mile west of Inwood. The risk to spend, say only $ 500,000 to upgrade this one mile
of CSAH 10 as recommended in Proposal 6 would be that at a later date more
funds could be required to add two additional lanes from Helmo Avenue to a
transition zone ending 1/8 mile east of Inwood Avenue. (Similar to Larpenter
Avenue at McKnight). If the traffic were designed to be posted with an urban
speed of 45 mph, no consideration of the 4-lane option would be necessary unless
traffic increased by a factor of 3X the present AADT. This is the educated choice
for the taxpayer and the environment. Even under the inflated County AADT
projection, the life of the proposed 4 lane divided highway would be 60% expended
by the time 4 lanes could be of any benefit to maintaining high traffic on a fully
signalized roadway. By building two lanes now, the future maintenance coats will
be substantially reduced and the roadsalt and impervious surface runoff reduced
by 50%.
Washington County Public Works Department
Proposal No.1—'Do nothing alternative"
Due to the acceptance by the County to comply with the request of Oakdale, the
existing 22 foot wide road was not improved as part of the recent work on CSAH 10.
The improved portion now has a rural section with two 12 foot lanes and 8 foot
paved shoulders for a total of 40 feet. Further the road, which is considered by the
County to be a major transportation route, has been allowed to deteriorate to be one
of the poorest roads in the State.
Washington County Public Works Department
Proposal No. 5--Four-lane reconstruction, shifted alignment
This alternative includes the construction of a four -lane roadway on a shifted
alignment. The alignment of the proposed eastbound roadway is proposed to
be shifted approximately 20 feet to the north of the existing road into Lake
Elmo with a raised concrete median separating the eastbound and
westbound roadways. This design also includes construction of a guardrail
in the shoulders in the section through Armstrong Lake. This proposal
would leave 3/4 of a mile of CSAH 10 as underutilized and as out of character
with the rest of the road as the 4-land divided stretch of TH-5 The existence of
this over -built road is now being used as a primary justification for an
industrial -warehouse zone in Lake Elmo. As presented, Proposal No. 5
shows the construction of at least three stubs for future intersecting roads
which are directed into Armstrong Lake or into wetlands.
Residents for Environmental Responsibility
Proposal No.6--The Balanced Solution
This proposal is a 45 mph posted speed, two-lane/four-lane reconstruction of
CSAH 10 with an urban section, including curbs and gutters. The road will
accommodate 3 times the traffic volume currently using CSAH 10.
Considerable congestion in the segment between I-694 and--Helmo will be
relieved by an increase in traffic lanes as agreed to by the County and
Oakdale. East of Helmo, a 1/4 mile transition from the signalized
intersection at Helmo will bring the road to two lanes saving much of the
existing wetland and woodland and providing a safe, appropriate, value
engineered road for both vehicles and pedestrians.
A future right-of-way for an additional 2 lanes should not be obtained at this
time. The land is largely unbuildable because of its wetland condition, will
not be a significant consideration. There is no need to take the land off the
tax roles at this time and little prospect that it will ever be needed.
SUMMARY:
Currently, there are 4 near -by east west roads between CSAH 13 and I-649 not
counting Old Hudson Road in Woodbury. They are I-94, Fourth Street, CSAH 10
and 15th Street. All the roads have been recently reconstructed --except CSAH 10.
The 4 roads provide a total of 12 traffic lanes. I-94 can accommodate another
30,000 vehicles per day, Fourth Street another 10,000 vpd, CSAH 10 another 8,000
vpd and 15th Street another 10,000 vpd. Excluding the freeway, the excess capacity
is 28,000 vpd--almost as much as the total current AADT on I-94, more than the
total current traffic on State Highway 36, and almost 3 times the current traffic on
State Highway 5. County Proposal 5 would increase this over capacity by another
20,000 vpd. bringing the total level of over capacity to 38,000 vpd, excluding the
30,000 vpd excess on I-94. Even under the most rapid, high density development
scenario, acceptance of Proposal 5 will assure continuation of a very large over
capacity in the east west direction in 20 years. If the bridge over I-94 is built, and
there is great pressure by Woodbury and Oakdale to build it, the over capacity of a
4-lane CSAH 10 would be even greater.
According to the April 1992 Washington County Transit Planning Study, by
Strgar-Roscoe-Fausch, Inc. the 1992, population of the Washington County cities
affected by the CSAH 10 construction (Lake Elmo, Oakdale, West Lakeland, and
Woodbury) is 50,000. The 1992 AADT for CSAH 10 is about 5,000. The 2010
population of these cities (adjusted for 250 acres of newly proposed residential
housing in Oakdale) is projected to grow to 77,000 (adding 1,500 in Lake Elmo,
4,000 in Oakdale, and decreasing by 200 in West Lakeland). Proposal No. 6
projects a corresponding increase in the AADT on the referenced section of CSAH
10 to 7,900. The County Public Works Department suggests a 2010 AADT of 15,000.
(This compares with only 11,500 in a separate 1992 Strgar-Roscoe-Fausch, Inc.
report.) Thus, the County Public Works Department is suggesting increase in
AADT of 300 percent, compared with a population increase of only 50%.
Only a phenomenal change in local employment levels in the next 17 years could
account for anything like the Washington County Public Works Department's
suggested traffic growth. As previously discussed, with the transfer of Section 32
to Oakdale, most of the planned business use was eliminated.
Privately, highway engineers at MnDOT, legislators at the Capitol,
Commissioners of Washington, residents who are among the few who are aware
of the County's plans, and independent traffic engineers who have been consulted
oppose the County Public Works Department Proposal. They are reluctant to
publically oppose the County Public Works Department, which is seeking to fully
utilize its share of the Constitutionally guaranteed 29% of the State gasoline tax
allocated to counties. However, these people strongly support the need to repair
CSAH 10 and provide adequate shoulders for pedestrians and the occasional
vehicle forced to stop along the roadway. They also support separate turn lanes to
maintain a uniform traffic flow.
The curbs proposed will allow the trees and shrubs to be planted within the near-
by right-of-way and allow for better runoff control. Prairie grasses will be an
appropriate, low maintenance ground cover. MnDOT is now planting 50% of new,
unpaved highway property in prairie grasses --some 2,000 acres per year.
Proposal 6 is the only proposal that conforms to the Comprehensive Plans of both
Cities, that minimizes the over -capacity of the east -west roadways, and that
recognizes the environmental significance and sensitivity of the land surrounding
CSAH 10.
This Proposal will greatly improve the driving conditions on CSAH 10 will for the
first time provide for pedestrian and safe bicycle use, improve the landscape and
be a good neighbor to adjacent property uses.
i
si
. i.: ...J _a�. .,.. L.' •r�a�� I,, 'y _ !� _ tea. � �/ // 2 '� _ fi
! r
y�
1
Mud
.
7
i
n I
lrm� M W—WA—A AM ��-AAW'203AW�— M 0
A I
oo
— / — -, v
Since we do not have time to discuss every point presented, it
may seem that decisions are preconceived. However, background
information is provided for the City Council on each agenda item in
advance from City Staff and appointed Commissions; and decisions are
based on this information and past experiences. In addition, some
items may also have been discussed at previous Council meetings.
If you are aware of information that hasn't been discussed,
please fill out a "Request to Appear Before the City Council" slip;
or, if you came late, raise your hand to be recognized. Comments that
are pertinent are appreciated. Items requiring excessive time may be
continued to another meeting.
LAKE ELMO CITY COUNCIL MEETING
APRIL 20, 1993
7:00 P.M. MEETING CONVENES
1. AGENDA
2. MINUTES: March 23, 1993
March 27, 1993
March 30, 1993
3. CLAIMS
4. OLD BUSINESS:
A. Street Standards, Request for Modifications
to Engineering Standards Adopted 10/15/91
B. Animal Control
(1) Letter from Animal Control Officer
dated March 26, 1993
(2) Pay Increase for Animal Control Officer
Approval of 1993 Animal Control Contract
C. Other
5. PLANNING/LAND USE & ZONING:
A. Shafer Mining Conditional Use Permit
B. E.A.W. for Reconstruction of 10th Street
C. Other
6. CITY ENGINEER'S REPORT:
A. 1993 Seal Coat & Crackfill Program
B. 201 System User Fee
Water Rate Review for Lake Jane System
Old Village System
LAKE ELMO CITY COUNCIL AGENDA April 20, 1993 2
7. CITY ATTORNEY'S REPORT:
8. CITY COUNCIL REPORTS:
A. Mayor John
B. Council Member Conlin
C. Johnson
D. Johnston
E. Mottaz
9. CITY ADMINISTRATOR'S REPORT:
A. Liquor License Request: Guardian Angels Church
B. Other
10. ADJOURN