Loading...
HomeMy WebLinkAbout10-26-93 CCMLAKE ELMO CITY COUNCIL MINUTES OCTOBER 26, 1993 Mayor John called the council meeting to order at 7:08 p.m. in the city council chamber. PRESENT: Mottaz, Conlin, John, Johnston, Johnson, City Engineer Bohrer and Administrator Kueffner. 1. AGENDA M/S/C Conlin/Johnson - to approve the October 26, 1993 City Council agenda as presented. (Motion carried 5-0). 1993 MSA IMPROVEMENTS: Mayor John opened up the Public Hearing at 7:10 p.m. in the council chambers. The public hearing notice to pass upon the proposed assessment for the 1993 MSA Improvements, Reconstruction of Jamaca Avenue between TH5 and Lake Jane Trail and Lake Jane Trail between Jamaca Avenue and Jane Road was published in the October 12, 1993 Stillwater Gazette and the Stillwater Gazette Extra on October 13, 1993 and all affected property owners were notified. Larry Bohrer reported the total amount to be assessed is $48,950 which is only about 5 1/2% of what the total project actually costs. The remainder is made up of Municipal State Aid Funds. It is proposed to assess each buildable lot abutting these streets $1,100/1-ot. For the purpose of assessment, a lot is defined as the maximum number of lots which a parcel could be divided into under present zoning. No. of Units: 44 1/2 Total Assessment: $1,100/Unit Mayor John closed the public hearing at 7:15 p.m. Jim Jungmann, 9404 Lake Jane Trail, asked the following questions: When and who is going to take care of the damage done to his property? The brick columns on the west end of his driveway have been tilted because of excavation and the elevation of his driveway needs to be taken care of. He was asked if they could move the power pole back into his property 4'. If he allows this, how are the trimming of his trees going to be handled? Bohrer explained in order to qualify for state aid funds we have to construct the road in accordance to state standards. One of the standards is safety if a car should leave the road. There should not be any fixed objects within 32' of the center line of the road. Bohrer will inquire from NSP if alley arms could be used and will have a NSP representative in charge of tree trimming look at the trees to see if they can be trimmed uniformly. Bohrer will set up a meeting with Mr. Jungmann in order to review these concerns. LAKE ELMO CITY COUNCIL MINUTES OCTOBER 26, 1993 Elizabeth Halden, 8312 Deer Pond Trail, asked if the city would consider white lines on Deer Pond Trail because the line helps define the edge of road for night driving. Bohrer responded there is no plan to add white stripes and striping would be a maintenance item. Nancy Tschumperlin, 9149 Lake Jane Trail, voiced her concern about the bituminous curb matching the blacktop of their driveway. Bohrer has looked at the dirveway and felt the curb match her driveway very well. 1993 BITUMINOUS OVERLAYS: Larry Bohrer reported that annually the City Public Works Department and the City Engineer review the condition of the city streets and report to the City Council the streets which need overlays. Mayor John opened up the Public Hearing at 8:30 p.m. in the council chambers The pubic hearing notice to pass upon the proposed assessment for the 1993 Bituminous Overlays was published in the October 12, 1993 Stillwater Gazette and the Stillwater Gazette Extra on October 13, 1993 and affected property owners were notified. Hidden Bay Area: Assessable Units: 111 Previous Estimate: $922 Assessment Rate*:$710 *Based on actual construction costs The Council received a letter from Grant Nelson, President -Corporation 14, indicating the parcel of property, 37546-2750, is an unbuildable lake access lot located at the end of Birch Bark Trail. This lot is jointly owned in the name of Corporate 14 by approximately 18 lot owners in the Hidden Bay area and they object to the assessment of this lot and request an abatement of the assessment. Administrator Kueffner suggested they go in front of the Board of Review and request this lot to be designated as non -buildable. The Council received a letter from Anton & Donna Johnson, 8405 Deer Pond Trail questioning the need for the overlay because the asphalt road was removed and replaced when the VBWD 1007 project was done in 1987. Bohrer explained during the Watershed project some pipes went through and the road was cut and patched and they were not assessed. The overlay did go over this patch and the road is uniform. Everyone in the neighborhood travels the same roads to get out so he didn't look at what was in front of each house Eleanor Skoog, 8573 Hidden Bay Trail, pointed out a deep rut on the inside of the curve which was made from large vehicles turning that needs to be patched. Bohrer responded that this is one of the hazards when roads are so narrow and he would look into patching the rut. LAKE ELMO CITY COUNCIL MINUTES OCTOBER 2G, 1993 The council received a letter from James Fisher, 8249 Deer Pond Ct N., indicating he ( felt the repair was unneeded and the assessment extensive. 37th Street (West of Jamaca) Assessable Units: 11 Previous Estimate:$827 Assessment Rate*:$715 *Based on actual construction costs. There was no one to speak for or against the street assessment. Kraft Circle Assessable Units:8 Previous Estimate:$751 Assessment Rate*:$596 *Based on actual construction costs The Council received a letter from Ronald Naatz, 3311 Kraft Circle N., indicating he felt the assessment was extreme and did not call this a $751 improvement. Naatz submitted suggestions to help overcome some problems for the next street project. Langley Court Assessable Units:4 Previous Estimate:$975 Assessment Rate*:$650 *Based on actual construction costs There was no one to speak for or against the street assessment. Legion Avenue (20th Street to Legion Lane) Assessable Units:10.5 Previous Estimate:$1,686 Assessment Rate*:$1,536 *Based on actual construction costs John & Mary Leslie, 11546 20th Street, stated they thought the assessment was too high for the benefit derived and should be given consideration for payment of resurfacing of 20th Street. They cannot access off Legion Avenue because of the terrain. Councilman Johnson responded that he thinks the assessment policy is fair Laverne Avenue (TH5 to 39th) Assessable Units:6 Previous Estimate:$2,413 Assessment Rate*:$1,681 *Based on actual construction costs There was no one to speak for or against the street assessment. Highlands Trail Assessable Units:24 Previous Estimate:$1,488 Assessment Rate*:$940 *Based on actual construction costs There was no one to speak for or against the street assessment LAKE ELMO CITY COUNCIL MINUTES OCTOBER 26, 1993 Highlands Trail Ct.N. Assessable Units:8 Previous Estimate:$1,238 Assessment Rate*:$1,233 *Based on actual construction costs There was no one to speak for or against the street assessment. 20th Street Court N. Assessable Units:3 Previous Estimate:$1,233 Assessment Rate*:$1,069 *Based on actual construction costs There was no one to speak for or against the street assessment. The Council closed the public hearing at 9:30 p.m. M/S/C Mottaz/Conlin - to adopt Resolution No. 93-72, Resolution Adopting Assessment for 1993 MSA Project and Bituminous Patching and Overlay of Hidden Bay with the exception of Corporate #14 (37546-2750), 37th Street (west of Jamaca), Kraft Circle, Langley Court, Legion Avenue (20th to Legion Avenue), Laverne Avenue (TH5 to 39th Street), Highlands Trail, Highlands Trail Court, 20th Street Court, at 6 percent interest over a period of five years. (Motion carried 5-0). M/S/C Mottaz/John - to adjourn the meeting at 9:35 p.m. (Motion carried 5-0). Grant E. Nelson 8549 Cherrywood Trail No. OCT 2 5 1993 Lake Elmo, MN 55042 (612) 770-6919 October 25, 1993 Lake Elmo City Clerk 3800 Laverne Avenue North Lake Elmo, MN 55042 Re: Protest of special Assessment for Hidden Bay area street improvement. This letter is in response to the notice of proposed assessnnt in the amount of $922.00 against a property parcel on Birchbark Trail (PIN No. 37546-2750). This piece of property is an unbuildable lake access lot located at the end of Birchbark Trail. The frontage of.this:lot on. Birchbark.Trail is approximately the width of one driveway. The lot. n question•is.,jbintly`ow.ried,:in.the!name,af Corporation 14.by approximately 18 lot :t civarer� i7rfilie k'iirliieri-Bay;are r::iCll-of whom -am subject twho ;special assessment:.on their 'buildah).0—Jots. By this letter,Thereby object to the assessment of the Corporation 14 lot, and request an abatement of the assessment on the basis that it will create a: double assessment to the owners of an unbuildable lot who are already being assessed on their buildable lots. Respectfully submitted, �/ 4 Corporation 14 Grant Nelson, President GEN/cjn cc.Corporation 14 members Oct. 26, 1993 To: City of Lake Elmo ( Vrom: Anton V. & Donna. ":. Jo'^nson I : PI_d NO. 37547-2300 Overlay Project We are questioning the need for the overlay on our portion of Deer Pond Trail. The asphalt road was removed and replaced when the VE 1007 Project ,Vas done in 1987. Please ses the attached letter from Mr. Allen Dornfeld dated 5-4-87. ;We sent in a prior letter on 6-2-93 questioning the overlay. Please respond to us in writing. Sincerely, Anton V. Joli 'son Donna. M. Jo_n son 8405 Deer Pond. Trl. No. Lake Elmo, 1JU9T 550J2 Telenhone: (612) 777-6803 Kenneth and Mary Gatzke 8415 Deer Pond Trail Lake Elmo, MN 55042 Anton and Donna Johnson 8405 Deer Pond Trail Lake Elmo, MN 55042 Re: Valley Branch Project 1007 Work Along Deer Pond Trail Dear Ladies and Gentlemen: May 4, 1987 John and Rose Mary Meyer 8409 Deer Pond Trail Lake Elmo, MN 53042 Leon and Lorraine Wald 8401 Deer Pond Trail Lake Elmo, MN 55042 The Board of Managers of Valley Branch Watershed District, our staff and our contractor, Barbarossa and Sons, Inc. would like to inform you of future construction along Deer Pond Trail and also the names and phone numbers of individuals who may be contacted for additional information. As' part of Project 1007, a 30-inch diameter reinforced concrete pipe will be installed within the right-of-way of Deer Pond Trail. The purpose of this pipe is to connect Deer Pond, Hedges' Pond, Hedges' Bog and Lake Jane to Crombie Pond and the outlet system which extends from Crombie Pond to the St. Croix River. Two existing catch basins along Deer Pond. Trail will also be replaced' as part of this project. Because of the depth pipe (12 to 15 feet), the existing Deer Pond Trail`itfrbe copy of the plans for As you have seen, site preparation activities including clearing and dewatering have already begun. Pipe installation will likely.begin this week. About three weeks will likely be required to install the pipe and an additional week will be required for restoration of Deer Pond Trail. Schedule can be affected by weather and other factors over which there is little control. Project construction will result in some temporary inconvenience, primarily in the area of vehicle access to your home. During pipe laying operations, Deer Pond Trail will be closed to thru traffic, but emergency vehicle access will be maintained to your homes at all times. ALLEN DORNFELD E.E. MOYNAGH GORDON C. MOOSBRUGGER RAY BRENNER RICHARD MURRAY VALLEY BRANCH WATERSHED DISTRICT P.O. BOX 142 LAKE ELMO, MINNESOTA 55402 If you have any questions or desire any additional information, please contact the following individuals: Barr Engineering Co. Al Fandrey Mark Hibbs Nets Nelson Barbarossa and Sons Inc. Bucky Ledden Work Home 830-0555 941-3771 830-0555 884-7579 830-0555 867-5277 Board of Managers Allen Dornfeld 777-5590 On behalf of the Managers, our staff, and our contractor, we thank you in advance for your patience and'understanding. SSiiacceerrely, Allen Dornfeld, President Board of Managers Valley Branch Watershed District AJF/lsf Enclosure VBLTR/314,12 IRwµ IYWNEww I - NED01 )AH ATMeVA' 1 / CONHT MOTION LIM1 9 � • ww I i' ON IT J I 1 sv 3 (' P PLORAOL CNANNE 1 1 H ~ vWW la i I Y' 6 y �• Y a CONSTRUCTION Ll4i AERIAL L CTPIC � MICTU e 1 tt-T to 'REYO E EXISTING MN .37 a I SENDS Ads E AND C 1 H,e wi s _ _- )� 17 OSNA POND EXISTING 30" RCP 0 l / Ir '•t,; O REMOV " J 'EXCITIN SC PCP AMC APRON AERIAL CATV h. �e INV. EL. PROX 08=.0 I AERIAL ELECTRIC REMOVE CO" RCP BURIED TELEPHON UNDOES POND / 1: BURIED DAB _ AERIAL CAW 1 REMOVE EXI GS Y"gR.N0R61f a-T 1$2-9ENC0 0 SPLIT RAIL PEND TV q �b I111�, •i' �/'�(l� Dies RHRO illAll CROYa/E PONa "EXS=���SHOYH/LfEONG� pL �Y:SZCE1/�Ey� 7Nl!:" Itllr-.YSd'l I j tl iSEG21aN�GB��, , V Y �YNMF IYI IIN NN •Y YNMN ��aTyl YTIIR�� -- �_ 1 .. M YYI Y•Yw•y. •N Y•.w • VALLEY BRANCH WATERSHED DIS7 ENGINEERING CO. MlnneaDaNa. Mn. 79: To. T he C-4 From-, 3�✓K2s A f rs r 52 99 J.�er {Pc, J C-f . N. Lae eimb T have -�o4 receI4 no4r-_e oC ckn QSSc��S�e�l� U��ec 1� -la The ptvtcb�W� 0' 4e CS, to e i / Fdock, -The s ftg4 coon-AzaS oyv "bee-r Povd Vllevv� ber azk pb4-1+ (zs QvL P-. ` 6_ crm cKrtld �Svlt4 J bt 6V� c�Cl(2s S�e�cQS acre bb{ Ib iS MPH � �Lre (S %o4 M.UCh 5�cee4 t,aojlSul+ eve Aee'P'9 oqr' relqFrr' _ v` Cak� z U3-e Z: -Pee. ( OQ_ ceb w (A_"t. S Uat n;ea6v p C,C' /45- 25'_/C.`/;-5 7 oA I A C- A IV /f /t ir- - 33ii IrinFr c✓� v . L•ahC' C:`c,� c; Mir ,1'S`uv•�... To /IIC Z.4)k - EL/Lr0 C/T� i 5 vvCiL- -Svr3,Iccr /3IJ�'sstit�,vr 1 v� /3!i✓.vi/,vdvs o'�c'nLn� ,7 LC`JJL`rZ t7uS,",v)r7i2/2'L'/� �7CTG13C'� S' l9y3 sJe'J-f me--M T Folz j riz�ET /,�,r��zvvc :+ra-:v; C C /t/fi r-T CCZ. jNN /}niul,u� !u 13t� E-_clnLcy �}Iieif&7Ti 7f _%?/rr�-piZ j7ranctvc U!- G.q.vA IJ� 5/Gi ✓Zli .�•✓)tit�' c�� ADA+Zt'1J G2 1/!t IJ/:rr 0 varIcc- T&,vr /7 )7 •!7 L' ✓,L iC r ra 13 e q i= P /z.'Lt G e ?,,r & r(. i(. o r iz e P' ' /z T y /F l' 71,i e f .ra .r , E= �-s? o .V r is 6 c`". %✓ u w L, v v c *A'/O w % HI J L�- X r iY & vt i e- /? IJ L ` f ,f ,,E4 c4 vVc.''J` l0 33/I t, lry -J� I f Y �`xrVZ&A't4 i�IlrfsMc�.�.r.' ,�hc 4•- o v k- /-)L r %t'rc n r- r C ti r= ez c,,, T �' C 0 K IV L It (i , %J?s1T-- / C in.. >L' , (4 n.D13 '10 r c• r /} M 1./ y' v L. L. t � t ,r Cl e L ✓7 L, I ,} r e a(.( TAIL`y h n.. p J li ,And) l r u fa - '�� p 4 %/// f %}' .1 / % .vl /7 /Z a iJ t_' .• Ll % 6fn, u w ,M e N y c 1,7 iv L n& c, t -L r c9 cnV, v v t !) i/ I%-o ru c &p t 'r L. / fr I�F A / } tii / S !4 Co / , F�vc 1� rI/7cN�A C ili}r c7vv VV? ay C/atc P- Cv1 L=t' J3il�" /k Jl4C`c'Y T/fn.r Mr+i, /f �C,�? %u UuCltC c�,�e.��= .1�t�>N� ,�.M �l •-E- ��Ra9CL MJ' . L' ev i./ 4:� iv j U it C . / %/l rndvLi 1/c•�r /^c2 t/cvrz %/•'Nt`-17 :�/J (ter .•vJ�tIL l; /}%/z:(J / .Cr - .� I - / aY'3 444v jU NI/;lI,C' UT1-FL'a2 PIZu)vCrf .Y L,vl un.rvtinPe - c'tiUvG�d TA`e Galan Cr�-,yc Coliciu t�c'J�nI=✓�cC ssrcr�T-r�rt.nJ. Ow Gci'0,3t-4A 9•)L) /-993 Ai of S Cc` N'c CavneC/ a+t C ,ry G /)ecyec' ;.v/ny jFnucU /-}/ctr`iz.%C`D�r/7J`-tNG�` 17'3o✓• Cu Mr.u¢ liFnT pny -. 'J-< /V u es.. r) 2 ry / N Ci J<, 6 ,�• r a r' C v ni J J r2 � c,- / o .V �.. jirrrrrrn 7`//rrN %3 C�.ci,ti c-'AGc Carr/wG na �,ciF/.�tr� ea,vG- CG t/c'r 14 CZc4-LL�'rz 332�J/� TrfnT It f/,.r vp r/tL Jo'iJ F}n�i� IT T�rrCf iT /a-Ce. ovi.=i'( ro ! ft7'1rC` �c-c.2 Cam/ no{w(; 7Nc wG/2y" /¢ns To 7f0dre /-- pon7-/4-G4& /3Zucvts2 /)-n,,11 Tftaws J>•��- 7111J 7,12A)-rq //uTU yP Ir f}n(P 7jizGU&fv/+yJ nc/ Cizrr- CuazFZL r% wrrN ?/� c/F/�i f� �'n .0 Jul] eTc J sT L crry f'a M e� a k C f ✓z a M G /7 h e? L C' a 2 Lar a c ,? <3 c re y L. !} _r /tw o f c.-+r>`IF /a µ,Cw us'IfleLc�o T//<'�(✓ %ttanlC- C'uitic f !> Tn•u.�c j+r�ck^ f'/7/t�/�JJiNCd ,FTIC�'Gf� ,iC'ofJL�` �R-tvc' JZ/6ff% TJ,'•a2vuG1-, 1T�. (fJNA i.vay.�U jr ev ,v11 //N f'C' 11c-&?Vt f /ue'+,ISy -A"V /V4'/G//lja✓2 juj f7uT !,v /3�1/Ur//:u� sw,�,ry c"cvC,7G'Tc ValvCwrir Jf d ,� rZ f�JNLII i%u&r+L l}No SCr �J' JT I3Rihltrcn.DCr 7-0 A ua, n n-c. 'y-la-c' /3 "c & rn is e-�, J �•Vvu.: 6C(- rt"I"r foc,n. Pr pv.a 3 Fan-. Mr %<U u'`X �7 /tCf( MYIUcF /v 7'/f/f avr �fYlar-h y�'v ,1 /,(cpL4 yvv qi)) c.orJpis� �vrz C r,:c=c' I C?a Since we do not have time to discuss every point presented, it may seem that decisions are preconceived. However, background information is provided for the City Council on each agenda item in advance from City Staff and appointed Commissions; and decisions are based on this information and past experiences. In addition, some items may also have been discussed at previous Council meetings. If you are aware of information that hasn't been discussed, please fill out a "Request to Appear Before the City Council" slip; or, if you came late, raise your hand to be recognized. Comments that are pertinent are appreciated. Items requiring excessive time may be continued to another meeting. LAKE ELMO CITY COUNCIL MEETING OCTOBER 26, 1993 7:00 p.m. MEETING CONVENES 1. AGENDA 2. PUBLIC HEARING ON PROPOSED ASSESSMENT: 1993 MSA IMPROVEMENTS: Jamaca Avenue between TH5 and Lake Jane Trail, and Lake Jane Trail between Jamaca Avenue and Jane Road 3. PUBLIC HEARING ON PROPOSED ASSESSMENT: 1993 BITUMINOUS PATCHING AND OVERLAYS: Hidden Bay Area 37th Street (west of Jamaca) Kraft Circle Langley Court Legion Avenue (20th to Legion Avenue) Laverne Avenue (TH5 to 39th) Highlands Trail Highlands Trail Court 20th Street Court 4. Other Adjourn 0