HomeMy WebLinkAbout10-26-93 CCMLAKE ELMO CITY COUNCIL MINUTES
OCTOBER 26, 1993
Mayor John called the council meeting to order at 7:08 p.m. in the city council chamber.
PRESENT: Mottaz, Conlin, John, Johnston, Johnson, City Engineer Bohrer and
Administrator Kueffner.
1. AGENDA
M/S/C Conlin/Johnson - to approve the October 26, 1993 City Council agenda as
presented. (Motion carried 5-0).
1993 MSA IMPROVEMENTS:
Mayor John opened up the Public Hearing at 7:10 p.m. in the council chambers. The
public hearing notice to pass upon the proposed assessment for the 1993 MSA
Improvements, Reconstruction of Jamaca Avenue between TH5 and Lake Jane Trail
and Lake Jane Trail between Jamaca Avenue and Jane Road was published in the
October 12, 1993 Stillwater Gazette and the Stillwater Gazette Extra on October 13,
1993 and all affected property owners were notified.
Larry Bohrer reported the total amount to be assessed is $48,950 which is only about 5
1/2% of what the total project actually costs. The remainder is made up of Municipal
State Aid Funds. It is proposed to assess each buildable lot abutting these streets
$1,100/1-ot. For the purpose of assessment, a lot is defined as the maximum number of
lots which a parcel could be divided into under present zoning.
No. of Units: 44 1/2 Total Assessment: $1,100/Unit
Mayor John closed the public hearing at 7:15 p.m.
Jim Jungmann, 9404 Lake Jane Trail, asked the following questions: When and who is
going to take care of the damage done to his property? The brick columns on the west
end of his driveway have been tilted because of excavation and the elevation of his
driveway needs to be taken care of. He was asked if they could move the power pole
back into his property 4'. If he allows this, how are the trimming of his trees going to be
handled?
Bohrer explained in order to qualify for state aid funds we have to construct the road in
accordance to state standards. One of the standards is safety if a car should leave the
road. There should not be any fixed objects within 32' of the center line of the road.
Bohrer will inquire from NSP if alley arms could be used and will have a NSP
representative in charge of tree trimming look at the trees to see if they can be
trimmed uniformly. Bohrer will set up a meeting with Mr. Jungmann in order to review
these concerns.
LAKE ELMO CITY COUNCIL MINUTES OCTOBER 26, 1993
Elizabeth Halden, 8312 Deer Pond Trail, asked if the city would consider white lines on
Deer Pond Trail because the line helps define the edge of road for night driving. Bohrer
responded there is no plan to add white stripes and striping would be a maintenance
item.
Nancy Tschumperlin, 9149 Lake Jane Trail, voiced her concern about the bituminous
curb matching the blacktop of their driveway. Bohrer has looked at the dirveway and felt
the curb match her driveway very well.
1993 BITUMINOUS OVERLAYS:
Larry Bohrer reported that annually the City Public Works Department and the City
Engineer review the condition of the city streets and report to the City Council the
streets which need overlays.
Mayor John opened up the Public Hearing at 8:30 p.m. in the council chambers The
pubic hearing notice to pass upon the proposed assessment for the 1993 Bituminous
Overlays was published in the October 12, 1993 Stillwater Gazette and the Stillwater
Gazette Extra on October 13, 1993 and affected property owners were notified.
Hidden Bay Area:
Assessable Units: 111 Previous Estimate: $922 Assessment Rate*:$710
*Based on actual construction costs
The Council received a letter from Grant Nelson, President -Corporation 14, indicating
the parcel of property, 37546-2750, is an unbuildable lake access lot located at the end
of Birch Bark Trail. This lot is jointly owned in the name of Corporate 14 by
approximately 18 lot owners in the Hidden Bay area and they object to the assessment
of this lot and request an abatement of the assessment. Administrator Kueffner
suggested they go in front of the Board of Review and request this lot to be designated
as non -buildable.
The Council received a letter from Anton & Donna Johnson, 8405 Deer Pond Trail
questioning the need for the overlay because the asphalt road was removed and
replaced when the VBWD 1007 project was done in 1987. Bohrer explained during the
Watershed project some pipes went through and the road was cut and patched and
they were not assessed. The overlay did go over this patch and the road is uniform.
Everyone in the neighborhood travels the same roads to get out so he didn't look at
what was in front of each house
Eleanor Skoog, 8573 Hidden Bay Trail, pointed out a deep rut on the inside of the curve
which was made from large vehicles turning that needs to be patched. Bohrer
responded that this is one of the hazards when roads are so narrow and he would look
into patching the rut.
LAKE ELMO CITY COUNCIL MINUTES
OCTOBER 2G, 1993
The council received a letter from James Fisher, 8249 Deer Pond Ct N., indicating he
( felt the repair was unneeded and the assessment extensive.
37th Street (West of Jamaca)
Assessable Units: 11 Previous Estimate:$827 Assessment Rate*:$715
*Based on actual construction costs.
There was no one to speak for or against the street assessment.
Kraft Circle
Assessable Units:8 Previous Estimate:$751 Assessment Rate*:$596
*Based on actual construction costs
The Council received a letter from Ronald Naatz, 3311 Kraft Circle N., indicating he felt
the assessment was extreme and did not call this a $751 improvement. Naatz
submitted suggestions to help overcome some problems for the next street project.
Langley Court
Assessable Units:4 Previous Estimate:$975 Assessment Rate*:$650
*Based on actual construction costs
There was no one to speak for or against the street assessment.
Legion Avenue (20th Street to Legion Lane)
Assessable Units:10.5 Previous Estimate:$1,686 Assessment Rate*:$1,536
*Based on actual construction costs
John & Mary Leslie, 11546 20th Street, stated they thought the assessment was too
high for the benefit derived and should be given consideration for payment of
resurfacing of 20th Street. They cannot access off Legion Avenue because of the
terrain. Councilman Johnson responded that he thinks the assessment policy is fair
Laverne Avenue (TH5 to 39th)
Assessable Units:6 Previous Estimate:$2,413 Assessment Rate*:$1,681
*Based on actual construction costs
There was no one to speak for or against the street assessment.
Highlands Trail
Assessable Units:24 Previous Estimate:$1,488 Assessment Rate*:$940
*Based on actual construction costs
There was no one to speak for or against the street assessment
LAKE ELMO CITY COUNCIL MINUTES
OCTOBER 26, 1993
Highlands Trail Ct.N.
Assessable Units:8 Previous Estimate:$1,238 Assessment Rate*:$1,233
*Based on actual construction costs
There was no one to speak for or against the street assessment.
20th Street Court N.
Assessable Units:3 Previous Estimate:$1,233 Assessment Rate*:$1,069
*Based on actual construction costs
There was no one to speak for or against the street assessment.
The Council closed the public hearing at 9:30 p.m.
M/S/C Mottaz/Conlin - to adopt Resolution No. 93-72, Resolution Adopting Assessment
for 1993 MSA Project and Bituminous Patching and Overlay of Hidden Bay with the
exception of Corporate #14 (37546-2750), 37th Street (west of Jamaca), Kraft Circle,
Langley Court, Legion Avenue (20th to Legion Avenue), Laverne Avenue (TH5 to 39th
Street), Highlands Trail, Highlands Trail Court, 20th Street Court, at 6 percent interest
over a period of five years. (Motion carried 5-0).
M/S/C Mottaz/John - to adjourn the meeting at 9:35 p.m. (Motion carried 5-0).
Grant E. Nelson
8549 Cherrywood Trail No. OCT 2 5 1993
Lake Elmo, MN 55042
(612) 770-6919
October 25, 1993
Lake Elmo City Clerk
3800 Laverne Avenue North
Lake Elmo, MN 55042
Re: Protest of special Assessment for Hidden Bay area street improvement.
This letter is in response to the notice of proposed assessnnt in the amount of $922.00
against a property parcel on Birchbark Trail (PIN No. 37546-2750). This piece of
property is an unbuildable lake access lot located at the end of Birchbark Trail. The
frontage of.this:lot on. Birchbark.Trail is approximately the width of one driveway.
The lot. n question•is.,jbintly`ow.ried,:in.the!name,af Corporation 14.by approximately 18 lot
:t civarer� i7rfilie k'iirliieri-Bay;are r::iCll-of whom -am subject twho ;special assessment:.on their
'buildah).0—Jots.
By this letter,Thereby object to the assessment of the Corporation 14 lot, and request an
abatement of the assessment on the basis that it will create a: double assessment to the
owners of an unbuildable lot who are already being assessed on their buildable lots.
Respectfully submitted,
�/ 4
Corporation 14
Grant Nelson, President
GEN/cjn
cc.Corporation 14 members
Oct. 26, 1993
To: City of Lake Elmo
( Vrom: Anton V. & Donna. ":. Jo'^nson
I : PI_d NO. 37547-2300 Overlay Project
We are questioning the need for the overlay on our portion of
Deer Pond Trail.
The asphalt road was removed and replaced when the VE 1007
Project ,Vas done in 1987. Please ses the attached letter
from Mr. Allen Dornfeld dated 5-4-87.
;We sent in a prior letter on 6-2-93 questioning the overlay.
Please respond to us in writing.
Sincerely,
Anton V. Joli 'son
Donna. M. Jo_n son
8405 Deer Pond. Trl. No.
Lake Elmo, 1JU9T 550J2
Telenhone: (612) 777-6803
Kenneth and Mary Gatzke
8415 Deer Pond Trail
Lake Elmo, MN 55042
Anton and Donna Johnson
8405 Deer Pond Trail
Lake Elmo, MN 55042
Re: Valley Branch Project 1007
Work Along Deer Pond Trail
Dear Ladies and Gentlemen:
May 4, 1987
John and Rose Mary Meyer
8409 Deer Pond Trail
Lake Elmo, MN 53042
Leon and Lorraine Wald
8401 Deer Pond Trail
Lake Elmo, MN 55042
The Board of Managers of Valley Branch Watershed District, our staff
and our contractor, Barbarossa and Sons, Inc. would like to inform you of
future construction along Deer Pond Trail and also the names and phone
numbers of individuals who may be contacted for additional information.
As' part of Project 1007, a 30-inch diameter reinforced concrete pipe
will be installed within the right-of-way of Deer Pond Trail. The purpose
of this pipe is to connect Deer Pond, Hedges' Pond, Hedges' Bog and Lake
Jane to Crombie Pond and the outlet system which extends from Crombie Pond
to the St. Croix River. Two existing catch basins along Deer Pond. Trail
will also be replaced' as part of this project. Because of the depth
pipe (12 to 15 feet), the existing Deer Pond Trail`itfrbe
copy of the plans for
As you have seen, site preparation activities including clearing and
dewatering have already begun. Pipe installation will likely.begin this
week. About three weeks will likely be required to install the pipe and an
additional week will be required for restoration of Deer Pond Trail.
Schedule can be affected by weather and other factors over which there is
little control.
Project construction will result in some temporary inconvenience,
primarily in the area of vehicle access to your home. During pipe laying
operations, Deer Pond Trail will be closed to thru traffic, but emergency
vehicle access will be maintained to your homes at all times.
ALLEN DORNFELD E.E. MOYNAGH GORDON C. MOOSBRUGGER RAY BRENNER RICHARD MURRAY
VALLEY BRANCH WATERSHED DISTRICT
P.O. BOX 142 LAKE ELMO, MINNESOTA 55402
If you have any questions or desire any additional information, please
contact the following individuals:
Barr Engineering Co.
Al Fandrey
Mark Hibbs
Nets Nelson
Barbarossa and Sons Inc.
Bucky Ledden
Work Home
830-0555 941-3771
830-0555 884-7579
830-0555
867-5277
Board of Managers
Allen Dornfeld 777-5590
On behalf of the Managers, our staff, and our contractor, we thank you
in advance for your patience and'understanding.
SSiiacceerrely,
Allen Dornfeld, President
Board of Managers
Valley Branch Watershed District
AJF/lsf
Enclosure
VBLTR/314,12
IRwµ
IYWNEww
I
-
NED01
)AH
ATMeVA'
1 /
CONHT MOTION LIM1 9
� • ww
I
i'
ON
IT
J I
1
sv
3
(' P
PLORAOL CNANNE
1 1
H
~
vWW
la
i
I
Y'
6
y
�•
Y
a
CONSTRUCTION Ll4i
AERIAL L CTPIC
�
MICTU
e
1
tt-T to
'REYO E EXISTING MN
.37
a
I
SENDS Ads E
AND C 1
H,e wi
s
_ _-
)�
17
OSNA POND
EXISTING 30" RCP
0
l /
Ir
'•t,;
O REMOV
"
J
'EXCITIN
SC PCP AMC APRON
AERIAL CATV
h. �e
INV. EL.
PROX 08=.0
I
AERIAL ELECTRIC
REMOVE CO" RCP
BURIED TELEPHON
UNDOES POND
/
1:
BURIED DAB
_
AERIAL CAW
1 REMOVE EXI GS
Y"gR.N0R61f
a-T 1$2-9ENC0
0
SPLIT RAIL PEND
TV
q
�b
I111�, •i'
�/'�(l�
Dies RHRO illAll
CROYa/E PONa
"EXS=���SHOYH/LfEONG�
pL �Y:SZCE1/�Ey�
7Nl!:" Itllr-.YSd'l I j tl
iSEG21aN�GB��, ,
V Y �YNMF IYI IIN NN •Y YNMN ��aTyl YTIIR�� -- �_ 1 ..
M YYI Y•Yw•y. •N
Y•.w •
VALLEY BRANCH WATERSHED DIS7
ENGINEERING CO. MlnneaDaNa. Mn.
79:
To. T he C-4
From-, 3�✓K2s A f rs r
52 99 J.�er {Pc, J C-f . N.
Lae eimb
T have -�o4 receI4 no4r-_e oC ckn QSSc��S�e�l�
U��ec 1� -la The ptvtcb�W� 0' 4e CS, to e i /
Fdock,
-The s ftg4 coon-AzaS oyv "bee-r Povd
Vllevv� ber azk pb4-1+ (zs QvL P-. ` 6_ crm cKrtld �Svlt4
J
bt 6V� c�Cl(2s
S�e�cQS acre bb{ Ib iS MPH � �Lre (S %o4 M.UCh
5�cee4 t,aojlSul+ eve Aee'P'9 oqr' relqFrr' _ v`
Cak� z U3-e Z: -Pee. ( OQ_ ceb w (A_"t. S Uat n;ea6v
p C,C'
/45- 25'_/C.`/;-5
7 oA I A C- A IV /f /t ir- -
33ii IrinFr c✓� v .
L•ahC' C:`c,� c; Mir ,1'S`uv•�...
To /IIC Z.4)k - EL/Lr0 C/T� i 5 vvCiL-
-Svr3,Iccr /3IJ�'sstit�,vr 1 v� /3!i✓.vi/,vdvs o'�c'nLn�
,7 LC`JJL`rZ t7uS,",v)r7i2/2'L'/� �7CTG13C'� S' l9y3
sJe'J-f me--M T Folz j riz�ET /,�,r��zvvc :+ra-:v; C C
/t/fi r-T CCZ. jNN /}niul,u� !u 13t� E-_clnLcy �}Iieif&7Ti
7f _%?/rr�-piZ j7ranctvc U!-
G.q.vA IJ� 5/Gi
✓Zli .�•✓)tit�' c�� ADA+Zt'1J G2 1/!t IJ/:rr 0 varIcc- T&,vr
/7 )7 •!7 L' ✓,L iC r ra 13 e q i= P /z.'Lt G e ?,,r & r(. i(. o r
iz e P' ' /z T y /F l' 71,i e f .ra .r , E= �-s? o .V r is 6 c`". %✓ u w L, v v c
*A'/O w % HI J L�- X r iY & vt i e- /? IJ L ` f ,f ,,E4 c4 vVc.''J`
l0 33/I
t, lry -J� I f Y �`xrVZ&A't4 i�IlrfsMc�.�.r.' ,�hc
4•- o v k- /-)L r %t'rc n r- r C ti r= ez c,,, T �' C 0 K IV L It (i ,
%J?s1T-- / C in.. >L' , (4 n.D13 '10 r c• r
/} M 1./ y' v L. L. t � t ,r Cl e L ✓7 L, I ,} r e a(.(
TAIL`y
h n.. p J
li ,And) l r u fa -
'�� p 4
%/// f %}' .1 / % .vl /7 /Z a iJ t_' .• Ll
% 6fn, u w ,M e N y c 1,7 iv L n& c, t -L r c9 cnV, v v t !) i/ I%-o ru
c &p t 'r L. / fr I�F A / } tii / S !4 Co
/ , F�vc 1� rI/7cN�A C ili}r c7vv VV? ay C/atc P- Cv1 L=t' J3il�" /k Jl4C`c'Y
T/fn.r Mr+i, /f �C,�? %u UuCltC c�,�e.��= .1�t�>N� ,�.M �l •-E- ��Ra9CL MJ' .
L' ev i./ 4:� iv j U it C .
/ %/l rndvLi 1/c•�r /^c2 t/cvrz %/•'Nt`-17 :�/J (ter .•vJ�tIL l; /}%/z:(J
/ .Cr - .� I - / aY'3
444v jU NI/;lI,C' UT1-FL'a2 PIZu)vCrf
.Y
L,vl un.rvtinPe
-
c'tiUvG�d
TA`e Galan Cr�-,yc Coliciu t�c'J�nI=✓�cC ssrcr�T-r�rt.nJ.
Ow Gci'0,3t-4A 9•)L) /-993
Ai of S Cc` N'c CavneC/ a+t C ,ry G /)ecyec'
;.v/ny jFnucU /-}/ctr`iz.%C`D�r/7J`-tNG�` 17'3o✓•
Cu Mr.u¢ liFnT pny -.
'J-< /V u es.. r) 2 ry / N Ci J<, 6 ,�• r a r' C v ni J J r2 � c,- / o .V
�.. jirrrrrrn 7`//rrN %3 C�.ci,ti c-'AGc Carr/wG na �,ciF/.�tr� ea,vG-
CG t/c'r 14 CZc4-LL�'rz 332�J/� TrfnT It f/,.r vp r/tL Jo'iJ F}n�i�
IT T�rrCf iT /a-Ce. ovi.=i'( ro ! ft7'1rC` �c-c.2 Cam/ no{w(; 7Nc
wG/2y" /¢ns To 7f0dre /-- pon7-/4-G4& /3Zucvts2 /)-n,,11 Tftaws J>•��-
7111J 7,12A)-rq //uTU yP Ir f}n(P 7jizGU&fv/+yJ nc/ Cizrr-
CuazFZL r% wrrN ?/� c/F/�i f� �'n .0 Jul] eTc J sT L crry
f'a M e� a k C f ✓z a M G /7 h e? L C' a 2 Lar a c ,? <3 c re y L. !} _r /tw o f
c.-+r>`IF /a µ,Cw us'IfleLc�o T//<'�(✓ %ttanlC- C'uitic f !> Tn•u.�c j+r�ck^
f'/7/t�/�JJiNCd ,FTIC�'Gf� ,iC'ofJL�` �R-tvc' JZ/6ff% TJ,'•a2vuG1-, 1T�.
(fJNA i.vay.�U jr ev ,v11 //N f'C' 11c-&?Vt f /ue'+,ISy -A"V
/V4'/G//lja✓2 juj f7uT !,v /3�1/Ur//:u� sw,�,ry c"cvC,7G'Tc
ValvCwrir Jf d ,� rZ f�JNLII i%u&r+L l}No SCr �J' JT I3Rihltrcn.DCr
7-0 A ua, n n-c. 'y-la-c' /3 "c & rn is e-�, J
�•Vvu.: 6C(- rt"I"r foc,n. Pr pv.a 3 Fan-. Mr %<U u'`X �7 /tCf( MYIUcF
/v 7'/f/f avr
�fYlar-h
y�'v
,1
/,(cpL4
yvv
qi)) c.orJpis�
�vrz C r,:c=c'
I C?a
Since we do not have time to discuss every point presented, it
may seem that decisions are preconceived. However, background
information is provided for the City Council on each agenda item in
advance from City Staff and appointed Commissions; and decisions are
based on this information and past experiences. In addition, some
items may also have been discussed at previous Council meetings.
If you are aware of information that hasn't been discussed,
please fill out a "Request to Appear Before the City Council" slip;
or, if you came late, raise your hand to be recognized. Comments that
are pertinent are appreciated. Items requiring excessive time may be
continued to another meeting.
LAKE ELMO CITY COUNCIL MEETING
OCTOBER 26, 1993
7:00 p.m. MEETING CONVENES
1. AGENDA
2. PUBLIC HEARING ON PROPOSED ASSESSMENT:
1993 MSA IMPROVEMENTS:
Jamaca Avenue between TH5 and Lake Jane Trail,
and Lake Jane Trail between Jamaca Avenue and Jane Road
3. PUBLIC HEARING ON PROPOSED ASSESSMENT:
1993 BITUMINOUS PATCHING AND OVERLAYS:
Hidden Bay Area
37th Street (west of Jamaca)
Kraft Circle
Langley Court
Legion Avenue (20th to Legion Avenue)
Laverne Avenue (TH5 to 39th)
Highlands Trail
Highlands Trail Court
20th Street Court
4. Other
Adjourn
0