Loading...
HomeMy WebLinkAbout12-14-60 PZM.12, NORTHERN MINNEAPOLIS 2 MINNESOTA Mr. Ken Sovereign 2410 Olson Lake Road North St, Paul, Minnesota Dear Mr. Soverign: December 14, 1960 RED ROCK-DULUTH SWITCHING STATION In our conversation on the phone the other day I mentioned to you that we had taken an option on a piece of the Lawrence Kleis property on Highway 36. The area that we have optioned is shown on the drawing attached to this letter. We have two different projects that involve our transmission lines in this area. One being the widening of our existing right of way running East and West to accommodate additional transmission lines, and the other project being the purchasing of right of way running North and South through the East end of the property we propose to purchase from Kleis. This last right of way will be for a transmission line from our Red Rock Station at Newport and will run North to Duluth, Minnesota. The reason for this switching station is so that we can switch these two lines at this point from one source of supply to another and thereby provide for the least possible interruptions in our service. These switching stations are built of structural steel but they do not have any transformers like we usually have in our substations, and will not require the area that a substation does. Our plans are not far enough along at present to be able to advise exactly where on this property this switching station will be, but it is anticipated that the switching station itself will not be constructed for at least five years. As you are perhaps aware, there is very little access off from Highway 36; therefore, it was necessary for us to purchase a piece of property where there was already access available and which was also near the junction of these two lines. I think you will recall that I mentioned to you that we did not feel that any rezoning would be necessary for the installation of this switching station as we are a public utility and are permitted by the City of Minne- apolis and many other cities and villages in this vicinity to construct substations and switching stations in areas regardless of zoning. Should it be necessary for your Council to take any action on this matter I would suggest that a special permit be issued covering the installation, and in that way you would not be opening up the rezoning in this area to Commercial or Industrial for other parties that might be interested. NORTHERN STATES POWER COMPANY Mr. Sovereign -2- December 14, 1960 The Zoning Ordinance of the City of Minneapolis provides as follows: "The Council may by special permit, by affirmative vote of three -fifths of all the members of the Council, after public hearing, authorize the location or extension of any of the following buildings or uses in any district from which they are prohibited by this ordinance, except as noted and provided that due notice of the time and purpose of such public hearing shall be published in the official paper of the City at least 15 days previous to the time of the holding of such public hearing." The Ordinance then goes on to list nine different types of uses, of which a public utility is one, that may be permitted by this special permit in any district. I would appreciate very much your talking over this matter with the other members of your Committee, and if you think it necessary to issue a permit and have additional explanation made we would be very pleased to appear at your next meeting, which I understand is on January 4, 1961. When you have had a chance to discuss this matter will you please call me, or write me, and advise me what additional steps you think will be required of us . Yours very truly, D. F. McELROY General Superintendent of Engineering / (() By X/ ( ) //% ��-C.- J/� i.l � �� �i''�-�fr�f/ LJ H. A. McDaniel, Supervisor, Lands and Right of Way. HAMcD/cm Attachment