HomeMy WebLinkAbout03-13-73 PZMVILLAGE OF LAKE ELMO
PLANNING AND ZONING COMMISSION
MINUTES OF THE MEETING MARCH 13, 1973
Meeting called to order at 7:50 p.rn. Members present: Chairman
Wm. Lundquist, B. Folz, D. Lyons, J. Sovereign. M. Eder arrived
at 8:15.
Minutes of February 26 meeting approved as submitted.
Mrs. Veronica Crombie and Brian Crombie, Box 108, Lake Elmo, appeared.
PZC reviewed Mrs. Crornbie's proposed Registered Land Survey. The
following questions should be answered prior to final Council approval:
1. The present zoning of that land is agricultural, requiring
a minimum five -acre lot size for building, to which the
proposed Registered Land Survey does not comply.
2. A preliminary map is to be submitted, showing the present
water elevation and the flood plain elevation as estab-
lished by the Water Shed District in relation to the pro-
posed boundary lines.
Prior to approval of a plat, if the intent is building, soil or
percolation tests should be taken to determine the feasibility of
granting a permit for a septic system that will comply with the
ordinance.
Lowell Rieks, 2035 - 7th Ave.,No. St. Paul, appeared regarding
development of 35 acres in the S1/2 of NW4 of Section 11 (Carlson
tract). This land was proposed for development a few months ago.
This agricultural use relieves PZC of any confrontation at such time
that we wish to rezone this land to agricultural.
Mr. Rieks proposes to put one home on the 35 acres and to have
approximately 20 beef stock on the 35 acres. He is in agreement
with agricultural use and zoning.
Mr. & Mrs. Tingstad appeared regarding obtaining a building permit
in the Lake Demontreville area.
Motion by B. Folz, seconded by J. Sovereign that PZC recommend that
they be permitted to build on the 80-foot lot providing the following
provisions are met:
1. The title must include lots 465, 466, 467, 468, 669, 670,
671, and 672 of Lane's Demontreville Country Club, and
must, in addition, include either lots 675, 676, 461, and
462, or lots 463, 464, 673, and 674. The intent of this
is to include 120 feet of the 160 feet to allow only one
structure on the entire 160 foot tract. (See attached
drawing.)
VILLAGE OF LAKE ELMO
PLANNING AND ZONING COMMISSION
MINUTES - MAPCH 13, 1973
Page 2
2. Percolation tests must be taken at the site of the proposed
septic system and must meet village ordinance requirements.
Also, the minimum building setback from the flood plain
elevation established by the Watershed District must be
75 feet, in compliance with the State Shotline Management
Act, unless said setback is inconsistent with existing
building lines.
Motion passed.
NOTE: It is suggested that the septic system he an the roadside of
the structure.
Ronald Colosimo, 101 Lyon St., St. Paul, appeared regarding a building
permit on lots 3 and 4 of Berschens Shores. It was recommended that
he submit the following information to the Valley Watershed Board of
Managers and also to the Village Council:
Map showing the present water location and elevation,
the 928-foot elevation in relationship to the property
boundaries (this should include elevations at the
proposed building and septic system locations), and
proposed final contours supplemented by final cross -
sections (road through building) to determine the volume
of fill and the location said fill is to be placed.
This matter will be handled by the Valley Watershed District and €he
Village Council.
Walter Witzel, 3220 Century Ave., White Bear Lake, appeared to
inquire about building on Carl Olinger land for a woodworking shop.
The building he presently occupies has been sold and he has two
months in which to vacate said premises. PZC recommended that he
try to get land that is already zoned industrial such as the land
between 212 and the railroad tracks west of the viaduct or the land
immediately east of the old village.
Bruce Kalcinski wants a Special Use Permit for a small kennel before
he will buy Jamieson land. Either a hearing date will be set or,
if applicant gets written permission from land owners within 250 feet,
the hearing may not be required. The S.U.P., when granted, may be
allowed only until the area develops sufficiently to force its
discontinuation.
Carl Berwald, North Country Ski Shop, must get dimensions of the
proposed sign before final action can be taken.
VILLAGE OF LAKE ELMO
PLANNING AND ZONING COMMISSION
MINUTES - MARCH 13, 1973
Page 3
Ely Salus is requesting permission to move a mobile home onto the
remaining portion of his land (Minn. State Highway Department is
in the process of acquiring part of his land), and reside there
for up to six months or until suitable replacement farm is found.
A hearing date will be set, or if Mr. Salus gets written permission
from land owners within 250 feet, the hearing may be waived.
Sign Ordinance, as it exists, will be enforced. People requesting
information on signs should be given copies of the appropriate
ordinance, (page 97, 98 of Model Zoning Regulation Code for
Communities in Washington County).
A continuation of the discussion on signs will be held at the next
PZC meeting.
Respectfully submitted,
Sandy Phernetton
Rec. Secretary
March 13, 1973
Telephone conversation between Maynard Eder and Carl Erickson, County
Administrator (Washington County) 439-3220
Should land areas northerly from the landfill be reduced in grade
to the final landfill grade?
C.E. It is not necessary that this be done, buti do understand
materials are being removed on Olinger property which will
ultimately result in lowering present topographical conditions
to the North, the degree of which is unknown to him.
Changes planned or undertaken in the areas adjacent to the landfill
property should be accomplished in a manner which will not
contribute drainage to it.
Present plans, upon completion of the landfill operation, call
for the county to change the contour adjacent to the filled
areas by construcing a valley (slight ditch) to provide drainage
to the pond to the Northeast which lies entirely within the
landfill property. This will prevent any external drainage
into the filled area. The filled in portion should only accept
water that falls upon it.
Q. When do anticipate the present landfill operation to have consumed
all available fill area?
C.E. A site is presently under consideration in Blaine which would
lessen the volume of material being delivered to the Washington
County site.
Q-
Without the Blaine silo , it appears the Washington County landfill
could not accept material beyond Spring 1974.
Does the county plan to develop the landfill as a park?
C.E. This has not been decided. The county intends to review the
matter with the Village of Lake Elmo, after completion of the
landfill operation.
(At one time it was indicated by Lake Elmo that a water tower be
erected on one high point within the site.)
you '
it