Meeting called to order at 7:35 P.M. by Chairman Lundquist.
PRESENT: Lundquist, Williams, Dreher, Sovereign and Armstrong.
Also present: Lyons
Springborn: Howard Springborn request the PZC approval on the
erection of a temporary directional sign on the SE
corner of 13 and 36. This sign would be for his
recreational area. Springborn indicated that because
his was a new business people were having difficulty
finding it.
MOTION: by Sovereign to allow Springborn to erect
the sign at the intersection for this season only,
the permission would have to be renewed each season.
Second: Dreher
Williams stated that the PZC policy is to prevent
further signs from being placed on 36 and 12.
Sovereign indicated that this was the first year of
operation, the sign was temporary, it was directional
and the recreation area was very close to the sign.
Springborn brought part of the sign to display.
VOTE: Motion carried: For: Lundquist, Dreher, Sovereign
Armstrong. Against: Williams
Goals Discussion: A discussion was had concerning the use to
which a possible Federal grant under the Community
Development Act could be put. The Goals List, copy
attached was formulated, and general agreement given
that the first five items were of most importance.
Some of the items listed would be completed by
agencies, groups or the PZC and would be done without
the Federal grant, but the consensus was that the list
contained the needed projects and should be used as
input into any decisions on the Federal grant and its
use.
Adjournment: The meeting was adjourned at 9:05P.M.
Respectfully
I IL
submitted,
`,AL,.
Thomas G. Armstrong
LAKE ELMO PLANNING COMMISSION
GOALS FOR 1975 -
1. Projected population growth timetable.
Ultimate sewer plan and staged sewer timetable to match
population needs; with a detailed engineering study for
sewering specific areas ie: old Lake Elmo Village and the
Tri-Lakes area
3. Ultimate road plan with surveyed boundaries and a road
implementation timetable.
Park plan
a. development plan for each site.
b. development of each site.
c. playground and recreational site plan.
5. Ultimate land use plan and a staged timetable.
6. Ultimate and staged plans for:
a. Public water needs.
b. Public buildings.
c. Fire protection.
d. Churches.
e. Cultural centers.
f. Schools.
g. Local small commercial centers.
h. 12-94 corridor.
7. Development plan for land next to airport.
8. Ground water analysis and storm sewer plan. Plan to keep
water from leaving the Village of Lake Elmo. Study of
recharge.
9. Study of environmental constraints to land use.