HomeMy WebLinkAbout06-24-91 PZMThe Planning Commission is an advisory body to the City
Council. One of the Commission's functions is to hold public
hearings and make recommendations to the City Council. The City
Council makes all final decisions on these matters.
Lake Elmo Ordinances require that certain documents and
information be included in applications. The Planning Commission
may postpone consideration of an application that is incomplete
and may for other reasons postpone final action on an application.
For each item, the Commission will receive reports
prepared by the City Staff, open the hearing to the public, and
discuss and act on the application. If you are aware of
information that hasn't been discussed, please fill out a "Request
to Appear Before the Planning Commission" slip; or, if you came
late, raise your hand to be recognized. Comments that are
pertinent are appreciated.
AGENDA
LAKE ELMO PLANNING COMMISSION
JUNE 24, 1991
7:30 p.m. MEETING CONVENES
1. AGENDA
2. MINUTES: June 10, 1991
3. Fox Fire Manor. Final Plat
4. Thoroughfare Plan
5. Review of Flood Plain Ordinance;
Call a public hearing
6. Set Joint Meeting with City Council
7. Other
8. ADJOURN
Date Aonroved: 7-8-91
Date Issued: 7-19-91
LAKE ELMO PLANNING COMMISSION MINUTES
JUNE 10, 1991
Chairman John called the Planning Commission meeting to order at 7:35
p.m. in the City Council Chambers. Present: John, Conlin, Johnston,
Stevens, Thomas, Weeks, Enes, DeLapp, Bucheck, Schubert, City Planner
Black. Absent: McLeod.
1. AGENDA
Add - 7. Other - Discuss comments from City Attorney on Minutes.
M/S/P Enes/DeLapp - to approve the Agenda as amended. (Motion carried
9-0) .
2. MINUTES: May 13, 1991
M/S/P DeLapp/Thomas - to approve the minutes as amended. (Motion
carried 8-0, abstain: Bucheck). Commissioner Bucheck wished to add
that the comments made by Jim Burns at the May 13 meeting were not up
to date and that she had talked to him before the public hearing in
February or March.
3. PUBLIC HEARING: C.U.P. AMENDMENT - LINDER'S GREENHOUSES
Chairman John opened the public hearing at 7:50 p.m. Notice of the
public hearing was published in the St. Croix Valley Press on May 22,
1991, and all property owners within 350 feet were notified. Chairman
John acknowledged receipt of the City Planner's review, dated June 6,
1991, and made part of the minutes by reference.
Rob Linder and his brother Peter, representing Linder's Greenhouses,
presented their request for amendment of the Linder's Greenhouses
C.U.P. for expansion of Phase II or 200,000 square feet of additional
greenhouse space. Mr. Linder went through his answers to the City
Planner's review, and answered questions from the Planning Commission.
Mr. Linder stated he would prefer to continue to use the dust
treatment on the street, and does not see the maintenance cost
becoming so excessive at this time that the street needs to be paved.
There were no further comments from the public, either for or against
this proposal, and Chairman John closed the public hearing at 8:20
p.m. and opened discussion from the Planning Commission.
M/S/P DeLapp/Enes - to recommend approval of the amendment to the
C.U.P. with the addition to the conditions that (1) if at any time
Linder's decides to use high intensity growth lights that shade covers
will be required, (2) adequate exterior screening in the form of trees
will be required (if not already in place), (3) that liaisons with
Washington County on road maintenance continue. Findings of Fact:
(1) There was no public comment against this amendment. (2) Linder's
has complied with the C.U.P. to date. (3) Ponding has been
constructed to meet this phase. (4) This amendment does not
automatically approve Phase III. (Motion carried 5-4, against:
Schubert - gravel road will be adversely affected by the increase in
traffic, Thomas - has not been provided with sufficient statistics to
decide if traffic increases will be reasonable, finds C.U.P. lacking,
Stevens - same reasons as Thomas, Bucheck - should wait two weeks to
consider any other aspects which may be relevant).
Lake Elmo Planning Commission Minutes June 10, 1991 Page 2
4. CONCEPT REVIEW: "GOOSE LAKE" DEVELOPMENT
Jim Peterson, Trail Head Development, and Marlo Glines, John Oliver &
Assoc., presented a concept of a 67 lot Residential Estates
subdivision located on approximately 235 acres at the Southwest corner
of 10th Street and County Road 19. This property will require
rezoning from RR to RE. This property was purchased by Trail Head
from Dayton Development (Heritage Builders signed their interest to
Trail Head in the Purchase Agreement). Soil Borings have been done.
Mr. Peterson would like to do this project in two phases. The Parks
Commission has given their recommendation. Goose Lake is a DNR
protected wetland and only 3.7 acres on the North and East side of the
lake are above the 100 year flood plain (11.8 acres is below the
Ordinary High Water Mark). The 20 foot wide trail (part of the Park
Land Dedication) equals 1.55 acres. The DNR will not allow direct
discharge of storm water into the lake without a sediment area or
ponding.
The Planning Commission comments were for Mr. Peterson to be prepared
to present answers to questions on drainage, ponding, grading, traffic
(speak with the County), streets, length of cul-de-sacs and landscape.
5. CONCEPT REVIEW: GOLF DOME ON I-94
Rick Hansen, Curt Mages and Steve Dahlby introduced themselves as 3 of
5 potential owners, and Ron Flanagan was introduced as -the owner of
the Airena Golf Center in Spring Lake Park. Mr. Hansen stated they
chose Lake Elmo because it is East of the Cities, has an open space
atmosphere, and I-94 is an ideal spot for this unique concept. There
is the potential to franchise if the owners wish. The primary use of
this dome would be as a golf driving range, but other uses include
softball, volleyball, touch football, soccer, etc. Its use would be
year round, therefore it would stay inflated all year. Lighting would
be a dim glow The cost of the dome structure would be approximately
$350,000.00 ($10.00 per square foot). The entire project cost (not
including capital) would be approximately $1,000,000.00. The
assessment value would be approx. $600,000.00 (building and land).
The size of the dome structure would be 165 feet wide, 210 feet long,
68 feet high. There would be 88 parking spaces (2:1 ratio). Mr.
Flanagan gave specifics on the building structure and material, and
suggested the Commission visit the Spring Lake Park facility located
at Hwy 65 and Osborne (NE corner). Chairman John stated the Planning
Commission is mixed in that some like the idea, some do not, and some
felt it does not fit the Limited Business District Zone. Chairman
John stated the Commission must resolve how it might fit the LB
distict zone or where it would fit if not in the LB district. The
Commission stated it needs to review the Limited Business District
Ordinance in order to properly address this.
Lake Elmo Planning Commission Minutes
6. APOSTOLIC CHURCH SITE (10th Street)
June 10, 1991 Page 3
M/S/P Conlin/Johnston - the Planning Commission concurs to (1) verify
that the Apostolic Church will not be building a church here, and (2)
rezone this property back to RR. (Motion carried 9-0).
7. OTHER: Comments from City Attorney regarding Minutes
M/S/P DeLapp/Enes - to keep the minutes of the Planning Commission
down to: comments made by the public, motions, findings of fact, -
votes, reasons for or against, and any facts necessary. (Motion
carried 9-0).
The meeting was adjourned at 10:35 p.m.
REQUEST FOR PLANNING COMMISSION REVIEW
Meeting Date:
AGENDA TOPIC: Fox Fire Manor (Final Plat)
June 24, 1991
ITEM
NO.
3.
Attached please find the Final Plat of Fox Fire Manor. Tom Prew,
City Engineer and Planner, Mike Black have reviewed the final plat
and found it was in conformance with the preliminary plat. (See
attached Reports)
JAMES R. HILL, INC.
PLANNERS ENGINEERS SURVEYORS
( _ 2500 WEST COUNTY ROAD 42, SUITE 120, OunsvILLE, MINNESOTA 55337 (612) 890-6044 FAX 890-6244
MEMORANDT
TO: take Elmo pinning Commission and City Administrator
FROM: Mike $lackl/1,(Jkek,
DATE: June 20, 1991
RE: FOX FIRE MANOR
Final Plat
I have reviewed the proposed Final Plat of Fox Fire Manor and find it in
concert with the preliminary plat approved by the City Council. I have
also reviewed the fallowing other final drawings:
* Final grading and drainage plan.
* Final street and storm sewer plan and profile.
* Final landscaping and wastewater disposal plan.
I recommend approval of the final plat of Fox Fire Manor subject to the
following conditions:
1. The final plat shall include street names. The extension of
55th Street North shall be labeled 55th Street North and the
east/west street shall be labeled 57th Street North.
2 The developer shall enter into a standard development agreement
with the City prior to any construction. The development
agreement shall require posting of a financial guarantee to
assure completion of all public improvements.
3. The developer shall pay a parkland dedication fee of 7% of the
property's fair market value.
4. The developer shall indicate how he intends to implement the
landscaping requirement with future lot owners.
JUJH cIJ "731 14:41U I . K. Li HHbbU'..
TKDA
�` ..aINEERS ARCHITECTS PLANNERS
June 20, 1991
Planning and Zoning Commission
City of Lake Elmo, Minnesota
Re: Final Plat Approval
Poxftre Manor
Commission No, 9150-001
Dear Commission Members:
TOLT2. KONO, DUVALL, ANDER&ON
AND ASSOOIATBS, INOORPORATSD
ae00 AMSRIOAN NATIONAL BANK WILDING
SAINT PAUL, MINNESOTA 66101.1500
01SR03.41400
PAX e19/R0a•0006
We have received and reviewed the final plat and find it in conformance with the preliminary
plat. The final plat should be available for your review at the meeting.
We have reviewed the street and grading plans and specifications and find them to be in
conformance with City 'Standards. Ponding meets the City requirements.
The Developer's Agreement has been drafted and sent to the developer and attorney for
execution.
The estimated cost for improvements for this plat are as follows:
Grading and Restoration $40,200,00
Storm Sewer 25,076.00
Streets 41,375.00
Staking and Inspection 5.332.55
Total Improvement Cost $111,983,55
+ 2596 28.016A5
Total Security Deposit $140,000,00
We recommend approval of the final plat contingent upon the following:
1.
2,
3,
Execution of the Developer's Agreement.
Deposit of $140,000.00 Performance Bond or other security.
Payment of all platting and park dedication fees.
Sincerely,
re --
Thomas D. Frew, P.B.
TDP/mha
May 9, 1991
City of Lake Elmo
3800 Laverne Avenue N.
Lake Elmo, MN 55042
I, Frank Langer, do hereby state that upon the request of Mary
Kueffner, I have made an investigation and analysis of the
following described property.
The proposed plat of Fox Fire Manor in Lake Elmo, MN.
The following opinion of market value is for the land only and
does not include any existing improvements to the land.
This property was viewed as fee simple, with no liens, judgements,
or encumbrances of any kind against it.
It is my opinion that the estimated market value on the above
described property is $180,000 , One Hundred Eighty Thousand
Dollars as of May 9, 1991.
Sincerely,
Frank nger�A.P
REQUEST FOR PLANNING CO?2tISSION REVIEW
•
Meeting Date:
AGENDA TOPIC: Thoroughfare Plan
June 24, 1991
ITEM 4.
NO.
At the direction of the City Council, a Street Plan Commmittee was
formed to study and prepare for the City a thoroughfare plan. The
Planning Commission members who served on this committee are: Wyn
John, Jim McLeod, Rita Conlin and Steve DeLapp
Please review the thorough plan and any comments or suggestions
will be appreciated. Once accepted by the City Council a
Resolution should be passed adopting the Plan and stating the
City's intention to use it as a reference when considering future
development plans.
JAMES R. HILL, INC.
PLANNERS ENGINEERS SURVEYORS
2500 WEST COUNTY ROAD 42, Sum 120, BURNSVILLE, MINNESOTA 55337 (612) 890-6044 FAX 890-6244
MEMORANDUM
TO: Lake Elmo P1 nniingClommission and City Administrator
FROM: Mike Black.. 2>LX.
DATE: June 19, 1991
RE: THOROUGHFARE PLAN
At the direction of the City Council, a Street Plan Committee was formed
to study and prepare for the City of Lake Elmo a thoroughfare plan. The
Planning Commission members who have served on this Committee are: Wyn
John, Jim McLeod, Rita Conlin and Steve Delapp.
The purpose of a thoroughfare plan is to project and forecast the
location of future through streets connecting existing vacant parcels in
the City's planned areas for residential growth. The plan is to be used
as a guide by the City, property owners, and developers when land
development is proposed. Is is intended to show the approximate
location and extension of roads for reasons of safety, convenience and
orderly access to developable properties in the City. It is also
intended to help alleviate future high cost of public infrastructure by
avoiding areas with severe building limitations while at the same time
planning the extension of through streets to adjoining and developable
properties.
The focus of the plan is in the Residential Estate Density (RED) areas
shown on the City's Future Land Use Map. It is the RED areas in which
the City has planned for residential growth at 6 units per 20 acres.
The plan shows the existing roadways and their functional classification
as identified in the Comprehensive Plan. The plan also shows certain
areas with severe road construction constraints based upon information
from Washington County Soil Survey. Future local residential streets
are shown connecting areas without building constraints.
A couple of items should be kept in mind when reviewing this
Thoroughfare Plan. First, it is intended that the future local street
locations are general and schematic. They are intended to display a
plan for through street connections and not exact locations. Although
in many areas the locations of future intersections are important, the
exact alignment of public right-of-ways will be determined through the
subdivision review process when development proposals are considered.
The other thought to keep in mind is that the restrictive soils overlay
is a very general analysis of soils with building limitations. These
limitations are typically organic soils, high water table and/or severe
slopes. Again, the exact location of future street right-of-ways will
depend upon further review and analysis of each development proposal as
they occur.
City of Lake Elmo
June 19, 1991
Page 2
The Street Plan Committee has completed their review of this plan and it
is now being presented to the full Planning Commission prior to City
Council consideration. At this time the plan should be considered
preliminary and any comments or suggestions would be appreciated. Once
reviewed and accepted by the City Council a Resolution should be passed
adopting the Plan and stating the City's intention to use it as a
reference and tool when considering future development plans. A sample
Resolution for City Council approval is attached.
CITY OF LAKE ELMO
CITY COUNCIL RESOLUTION NO.
WHEREAS, the City Council has planned for and anticipates
residential land development in the areas designated as Residential
Estate Density shown on the City's Future Land Use Map; and,
WHEREAS, it has been determined to be in the best interest of
public health, safety, convenience and orderly growth to plan where
possible local through streets; and,
WHEREAS, it is appropriate to avoid the construction of roads in
areas with severe building limitations; and,
WHEREAS, the Lake Elmo Street Plan Committee and Planning
Commission have reviewed and recommended approval of the Thoroughfare
Plan for Lake Elmo.
NOW THEREFORE BE IT RESOLVED, that the Thoroughfare Plan prepared
by James R. Hill, Inc. is hereby adopted and shall be used as a
reference and guide for future roadways when new development proposals
are made and considered for approval.
REQUEST FOR PLANNING COt^`1T_SSION REVIEW
Meeting Date:
AGENDA Topic:Review of Flood Plain Ordinance;
Call Public Hearing
June 24, 1991
ITEM
NO.
5.
Attached is a copy of the proposed revised flood plain regulations
for the City of Lake Elmo. The Department of Natural Resources
has completed its review and informed the City that the draft
ordinance has been found to be in compliance with "Statewide
Standards and Criteria for Management of Floodplain Areas of
Minnesota."
After the Planning Commission has reviewed the revised flood plain
regulations, you should proceed to schedule a public hearing for
an amendment to the City's zoning regulations.
STATE OF
DEPARTMENT OF NATURAL RESOURCES
(
MR INPORMA'NON
(6121 296-4157
May 29, 1991
500 LAFAYETiE ROAD • ST, PAUL, MINNESOTA • 55155.40
Michael J. Black
Vice President
James R. Hill, Inc.
2500 West County Road 42
Suite 120
Burnsville, MN 55337
Dear Mr. Black:
STATE APPROVAL OF DRAFT FLOODPLAIN ORDINANCE
RECEIVED
MAY 3 0 1991
NES R. HILL INC,
The Department of Natural Resources has completed its review of the draft
ordinance the City of Lake Elmo is considering for adoption. The ordinance was
entitled Floodplain Management ordinance and was dated May 23, 1991.
On behalf of the Commissioner of Natural Resources, I am pleased to inform you
that the draft ordinance has been found to be in compliance with "Statewide
Standards and Criteria for Management of Floodplain Areas of Minnesota,"
Minnesota Regulations, Parts 6120,5000 to 6120.6200. Therefore, in accordance
with Minnesota Statutes, Section 103F, 1 hereby conditionally certify state
approval of the above cited draft ordinance.
This approval is valid upon receipt (within 90 days) of three (3) certified,
signed copies of the adopted version and a completed copy of the Ordinance
Certification Checklist (attached) by Area Hydrologist Molly Shodeen located at
the following address:
DNR-Division of Waters
1200 Warner Road
St. Paul, MN 55106
(612) 772-7910
Any changes of the subject draft ordinance prior to adoption must be approved by
this agency prior to adoption before they can be considered valid. Also be
advised that any future amendments of this ordinance or change in the
designation of flood prone areas requires prior approval of the Commissioner.
Note that you are required to send copies of hearing notices and final decisions
relating to variances and conditional use permits relating to this ordinance to
the Department. Please send these directly to Area Hydrologist Molly Shodeen
and rely on her for assistance in administering your ordinance.
AN EQUAL OPPORTUNITY EMPLOYER
Page Two
Since your administration of a floodplain zoning ordinance is a pre -requisite of
your eligibility in the National Flood Insurance Program, a certified copy of
the adopted ordinance will be sent by this office to the Federal Emergency
Management Agency.
Your cooperation and initiative in providing for the reduction in flood damage
through the administration of this ordinance is greatly appreciated.
Sincerely,
DIVISION
Paul Swens cting Administrator
Permits and Land Use Section
PS/OA:fw
cc: John Stine, Regional Hydrologist
Molly Shodeen, Area Hydrologist
David Schein, FEMA
City of Lake Elmo
May 23, 1991
FLOODPLAIN MANAGEMENT ORDINANCE
TABLE OF CONTENTS
PAGE
SECTION 304.010 STATUTORY AUTHORIZATION, FINDINGS OF
FACT AND PURPOSE 1
A. Statutory Authorization 1
B. Findings of Fact 1
C. Statement of Purpose 1
SECTION 304.020 GENERAL PROVISIONS 1
A. Lands to Which Ordinance Applies 1
B. Establishment of Official Zoning Map 1
C. Regulatory Flood Protection Elevation 2
D. Interpretation 2
E. Abrogation and Greater Restrictions 2
F. Warning and Disclaimer of Liability 2
G. Severability 2
SECTION 304.030 DEFINITIONS 3
SECTION 304.040 ESTABLISHMENT OF ZONING DISTRICTS 4
A. Districts 4
B. Compliance 5
SECTION 304.050 FLOODWAY DISTRICT (FW) 5
A. Permitted Uses 5
B. Standards for Floodway Permitted Uses 6
C. Conditional Uses 6
D. Standards for Floodway Conditional Uses 7
SECTION 304.060 FLOOD FRINGE DISTRICT (FF) 9
A. Permitted Uses 9
B. Standards for Flood Fringe Permitted Uses 9
C. Conditional Uses 9
D. Standards for Flood Fringe Conditional Uses 9
E. Standards for A11 Flood Fringe Uses 11
SECTION 304.070 GENERAL FLOOD PLAIN DISTRICT 12
A. Permissible Uses 12
B. Procedures for Floodway and Flood
Fringe Determinations 13
SECTION 304.080 PUBLIC UTILITIES, RAILROADS, ROADS,
AND BRIDGES 14
A. Public Utilities
B. Public Transportation Facilities
C. On -site Sewage Treatment and Water
Supply Systems
14
14
14
SECTION 304.090 ADMINISTRATION 15
A. Zoning Administrator 15
5. Permit 15
C. Application for Permit 15
D. State and Federal Permits 15
E. Certificate of Zoning Compliance 15
F. Construction and Use 15
G. Certification 16
H. Record of First Floor Elevation 16
I. Subdivisions 16
SECTION 304.100 APPEALS AND VARIANCES/DUTIES OF THE
BOARD OF ADJUSTMENT 16
A. Rules 16
B. Administrative Review 16
C. Variances 16
D. Hearings 17
E. Decisions 17
F. Appeals 17
G. Flood Insurance Notice and Record Keeping 17
SECTION 304.110 CONDITIONAL USES - STANDARDS OF
EVALUATION PROCEDURES 18
A. Hearings 18
B. Procedures 18
C. Factors 18
D. Conditions 19
SECTION 304.120 NONCONFORMING USES 20
SECTION 304.130 PENALTIES FOR VIOLATION 21
SECTION 304.140 AMENDMENTS 22
i
ii
i
1
FLOOD PLAIN MANAGEMENT ORDINANCE
SECTION 304.010 STATUTORY AUTHORIZATION, FINDINGS OF FACT
AND PURPOSE
A. Statntnry Anthorization: The legislature of the State of
Minnesota has, in Minnesota Statutes Chapter 103F and 462.357
delegated the responsibility to local government units to adopt
regulations designed to minimize flood losses. Therefore, the
City Council of Lake Elmo, Minnesota does ordain as follows:
B. Findinaa of Fact:
1. The flood hazard areas of Lake Elmo, Minnesota, are
subject to periodic inundation which results in potential
loss of life, loss of property, health and safety hazards,
disruption of commerce and governmental services,
extraordinary public expenditures or flood protection and
relief, and impairment of the tax base, all of which
adversely affect the public health, safety, and general
welfare.
2. Methods Used to Analyze Flood Hazards. This Ordinance
is based upon a reasonable method of analyzing flood hazards
which is consistent with the standards established by the
Minnesota Department of Natural Resources.
C. Statement of Purpose: It is the purpose of this Ordinance to
promote the public health, safety, and general welfare and to
minimize those losses described in Section 1.21 by provisions
contained herein.
SECTION 304.020 GENERAL PROVISIONS
A. Lands to Which Ordinance Anniies: This ordinance shall apply
to all lands within the jurisdiction of the City of Lake Elmo
shown on the City's Flood Boundary and Flooding Map and the Flood
Insurance Rate Map (hereafter "Official Maps") as being located
within the boundaries of the Floodway, Flood Fringe, or General
Flood Plain Districts.
B. Establishment of nffin4a1 2nnYna Matz: The Official Zoning
Map together with all materials attached thereto is hereby adopted
by reference and declared to be a part of this ordinance. The
attached material shall include the Flood Insurance Study for the
City of Lake Elmo prepared by the Federal Insurance Administration
dated January 1979, and the Flood Boundary and Floodway Map and
Flood Insurance Rate Map dated July 2, 1979 therein.
1
C. Rer„tatnry Fined Rrntortinn F.tevat;on: The Regulatory Flood
Protection Elevation shall be an elevation no lower than one foot
above the elevation of the regional flood plus any increases in
flood elevation caused by encroachments on the flood plain that
result from designation of a floodway.
D. Interoratarina:
1. In their interpretation and application, the provisions
of this Ordinance shall be held to be minimum requirements
and shall be liberally construed in favor of the Governing
Body and shall not be deemed a limitation or repeal of any
other powers granted by State Statutes
2. The boundaries of the Floodway, Flood Fringe and General
Flood Plain districts shall be determined by scaling
distances on the Official Maps. Where interpretation is
needed as to the exact location of the boundaries of the
district as shown on the Official Maps, as for example where
there appears to be a conflict between a mapped boundary and
actual field conditions and there is a formal appeal of the
decision of the Zoning Administrator, the Board of Adjustment
shall make the necessary interpretation. All decisions will
be based on elevations on the regional (100-year) flood
profile and other available technical data. Persons
contesting the location of the district boundaries shall be
given a reasonable opportunity to present their case to the
Board and to submit technical evidence.
E. A.roaatinn an rAa- r Rcgfiri,;r;n : It is not intended by
this Ordinance to repeal, abrogate, or impair any existing
easements, covenants, or deed restrictions. However, where this
Ordinance imposes greater restrictions, the provisions of this
Ordinance shall prevail. All other ordinances inconsistent with
this Ordinance are hereby repealed to the extent of the
inconsistency only.
F. Warning and Disclaimer of Tiahi7_jt: This Ordinance does not
imply that areas outside the flood plain districts or land uses
permitted within such districts will be free from flooding or
flood damages. This Ordinance shall not create liability on the
part of the City of Elmo Elmo or any officer or employee thereof
for any flood damages that result from reliance on this Ordinance
or any administrative decision lawfully made thereunder.
G. severabilitv: If any section, clause, provision, or portion
of this Ordinance is adjudged unconstitutional or invalid by a
court of competent jurisdiction, the remainder of this Ordinance
shall not be affected thereby.
2
SECTION 304.030 DEFINITIONS
Unless specifically defined below, words or phrases used in this
Section shall be interpreted so as to give them the same meaning
as they have in common usage and so as to give this Ordinance its
most reasonable application. In the event that a definition in
Section 301.040 is different than the definition herein, the
definition found in this Section shall apply.
Accessory Use or Structure - a use or structure on the same lot
with, and of a nature customarily incidental and subordinate to,
the principal use or structure.
Basement - means any area of a structure, including crawl spaces,
having its floor or base subgrade (below ground level) on all four
sides, regardless of the depth of excavation below ground level.
Conditional Use - means a specific type of structure or land use
listed in the official control that may be allowed but only after
an in-depth review procedure and with appropriate conditions or
restrictions as provided in the official zoning controls or
building codes and upon a finding that: (1) certain conditions as
detailed in the zoning ordinance exist and (2) the structure
and/or land use conform to the comprehensive land use plan if one
exists and are compatible with the existing neighborhood.
Equal Degree of Encroachment - a method of determining the
location of floodway boundaries so that flood plain lands on both
sides of a stream are capable of conveying a proportionate share
of flood flows.
Flood - a temporary increase in the flow or stage of a stream or
in the stage of a wetland or lake that results in the inundation
of normally dry areas.
Flood Frequency - the frequency for which it is expected that a
specific flood stage or discharge may be equalled or exceeded.
Flood Fringe - that portion of the flood plain outside of the
floodway. Flood fringe is synonymous with the term "floodway
fringe" used in the Flood Insurance Study for the City of Lake Elmo.
Flood Plain - the beds proper and the areas adjoining a wetland,
lake or watercourse which have been or hereafter may be covered by
the regional flood.
Flood -Proofing - a combination of structural provisions, changes,
or adjustments to properties and structures subject to flooding,
primarily for the reduction or elimination of flood damages.
Floodway - the bed of a wetland or lake and the channel of a water-
course and those portions of the adjoining flood plain which are
reasonably required to carry or store the regional flood discharge.
3
Obstruction - any dam, wall, wharf, embankment, levee, dike, pile,
abutment, projection, excavation, channel modification, culvert,
building, wire, fence, stockpile, refuse, fill, structure, or
matter in, along, across, or projecting into any channel, water-
course, or regulatory flood plain which may impede, retard, or
change the direction of the flow of water, either in itself or by
catching or collecting debris carried by such water.
Principal Use or Structure - means all uses or structures that are
not accessory uses or structures.
Reach - a hydraulic engineering term to describe a longitudinal
segment of a stream or river influenced by a natural or man-made
obstruction. In an urban area, the segment of a stream or river
between two consecutive bridge crossings would most typically
constitute a reach.
Regional Flood - a flood which is representative of large floods
known to have occurred generally in Minnesota and reasonably
characteristic of what can be expected to occur on an average
frequency in the magnitude of the 100-year recurrence interval.
Regional flood is synonymous with the term "base flood" used in
the Flood Insurance Study.
Regulatory Flood Protection Elevation - The Regulatory Flood
Protection Elevation shall be an elevation no lower than one foot
above the elevation of the regional flood plus any increases in
flood elevation caused by encroachments on the flood plain that
result from designation of a floodway.
Structure - anything constructed or erected on the ground or
attached to the ground or on -site utilities, including, but not
limited to, buildings, factories, sheds, detached garages, cabins,
manufactured homes and other similar items.
Variance - means a modification of a specific permitted
development standard required in this ordinance to allow an .
alternative development standard not stated as acceptable in the
official control, but only as applied to a particular property for
the purpose of alleviating a hardship, practical difficulty or
unique circumstance.
SECTION 304.040 ESTABLISHMENT OF ZONING DISTRICTS
A. Districts:
1. Floodway District. The Floodway District shall include
those areas designated as floodway on the Flood Boundary and
Floodway Map.
f
4
2. Flood Fringe District. The Flood Fringe District shall
include those areas designated as floodway fringe on the
Flood Boundary and Floodway Map.
3. General Flood Plain District. The General Flood Plain
District shall include those areas designated as unnumbered A
Zones on the Flood Insurance Rate Map.
B. Compliance• No new structure or land shall hereafter be used
and no structure shall be located, extended, converted, or
structurally altered without full compliance with the terms of
this Ordinance and other applicable regulations which apply to
uses within the jurisdiction of this Ordinance. Within the
Floodway, Flood Fringe and General Flood Plain Districts, all uses
not listed as permitted uses or conditional uses in Sections
304.050, 304.060, and 304.070 that follow, respectively, shall be
prohibited. In addition, a caution is provided here that:
1. New manufactured homes, replacement manufactured homes
and certain travel trailers and travel vehicles are subject
to the general provisions of this Ordinance;
2. Modifications, additions, structural alterations or
repair after damage to existing nonconforming structures and
nonconforming uses of structures or land are regulated by the
general- provisions of this Ordinance and specifically Section.
304.120; and
3. As -built elevations for elevated or flood proofed
structures must be certified by a Registered Land Surveyor
and flood proofing techniques must be designed and certified
by a registered professional engineer, architect and/or land
surveyor as specified in the general provisions of this
Ordinance and specifically as stated in Section 304.090 of
this Ordinance.
SECTION 304.050 FLOODWAY DISTRICT (FW)
A. Permitted tTcAc: The following uses have a low flood damage
potential and do not obstruct flood flows. These uses shall be
permitted within the Floodway District to the extent that they are
not prohibited by any other ordinance and provided they do not
require structures, fill, or storage of materials or equipment.
In addition, no use shall adversely affect the capacity of the
channels or floodways or any tributary to the main stream or of
any drainage ditch, or any other drainage facility or system.
1. Agricultural uses such as general farming, pasture,
grazing, outdoor plant nurseries, horticulture, truck
farming, forestry, sod farming and wild crop harvesting.
5
2. Industrial -Commercial uses such as loading areas,
parking areas and airport landing strips.
3. Private and public recreational uses such as golf
courses, tennis courts, driving ranges, archery ranges,
picnic grounds, boat launching ramps, swimming areas, parks,
wildlife and nature preserves, game farms, fish hatcheries,
shooting preserves, target ranges, trap and skeet ranges,
hunting and fishing areas, and single or multiple purpose
recreational trails. -
4. Residential uses such as lawns, gardens, parking areas,
and play areas.
B. Standards fnr Wlnndway Porrnittad iisas:
1. The use shall have a low flood damage potential.
2. The use shall be permissible in the underlying zoning
district if one exists. -
3. The use shall not obstruct flood flows or increase flood
elevations and shall not involve structures, fill,
obstructions, excavations or storage of materials or equipment.
C. Cnnditinnal Uses.:
1. Structures accessory to the uses listed in 304.060 A.
above and the uses listed in 2 through 8 below.
2. Extraction and storage of sand, gravel, and other
materials.
3. Marinas, boat rentals, docks, piers, wharves, and water
control structures.
4. Railroads, streets, bridges, utility transmission lines,
and pipelines.
5. Storage yards for equipment, machinery, or materials.
6. Placement of fill.
7. Travel trailers and travel vehicles either on individual
lots of record or in existing or new subdivisions or
commercial or condominium type campgrounds, subject to the
exemptions and provisions of this Ordinance.
8. Structural works for floodcontrol such as levees, dikes
and floodwalls constructed to any height where the intent is
to protect individual structures and levees or dikes where the
intent is to protect agricultural crops for a frequency flood
event equal to or less than the 10-year frequency flood event.
I
D. Srandards fnr Flnndtjay Conditional tJsec:
1. All Uses. No structure (temporary or permanent), fill
(including fill for roads and levees), deposit, obstruction,
storage of materials or equipment, or other uses may be
allowed as a Conditional Use that will cause any increase in
the stage of the 100-year or regional flood or cause an
increase in flood damages in the reach or reaches affected.
2. All floodway Conditional Uses shall be subject to the
procedures and standards contained in Section 304.110 of this
Ordinance.
3. The Conditional Use shall be permissible in the
underlying zoning district if one exists.
4. Fill:
(a) Fill, dredge spoil and all other similar materials
deposited or stored in the flood plain shall be
protected from erosion by vegetative cover, mulching,
rip -rap or other acceptable method.
(b)- Dredge spoil sites and sand and gravel operations
shall not be allowed in the floodway unless a long-term
site development plan is submitted which includes an
erosion/sedimentation prevention element to the plan.
(c) As an alternative, and consistent with Subsection
(b) immediately above, dredge spoil disposal and sand
and gravel operations may allow temporary, on -site
storage of fill or other materials which would have
caused an increase to the stage of the 100-year or
regional flood but only after the Governing Body has
received an appropriate plan which assures the removal
of the materials from the floodway based upon the flood
warning time available. The Conditional Use Permit must
be title registered with the property in the Office of
the County Recorder.
5. Accessory Structures:
(a) Accessory structures shall not be designed for
human habitation.
(b) Accessory structures, if permitted, shall be
constructed and placed on the building site so as to
offer the minimum obstruction to the flow of flood
waters. (1) Whenever possible, structures shall be
constructed with the longitudinal axis parallel to the
direction of flood flow, and, (2) So far as practicable,
structures shall be placed approximately on the same
flood flow lines as those of adjoining structures.
7
(c) Accessory structures shall be elevated on fill or
structurally dry flood proofed in accordance with the
FP-1 or FP-2 flood proofing classifications in the State
Building Code. As an alternative, an accessory
structure may be flood proofed to the FP-3 or FP-4 flood
proofing classification in the State Building Code
provided the accessory structure constitutes a minimal
investment, does not exceed 500 square feet in size, and
for a detached garage, the detached garage must be used
solely for parking of vehicles and limited storage. All
flood proofed accessory structures must meet the
following additional standards, as appropriate:
(1) The structure must be adequately anchored to
prevent flotation, collapse or lateral movement of
the structure and shall be designed to equalize
hydrostatic flood forces on exterior walls; and
(2) Any mechanical and utility equipment in a
structure must be elevated to or above the
Regulatory Flood Protection Elevation or properly
flood proofed.
6. Storage of Materials and Equipment:
(a) The storage or processing of materials that are, in
time of flooding, flammable, explosive, or potentially
injurious to human, animal, or plant life is prohibited.
(b) Storage of other materials or equipment may be
allowed if readily removable from the area within the
time available after a flood warning and inaccordance
with a plan approved by the Governing Body.
7. Structural works for flood control that will change the
course, current or cross section of protected wetlands or
public waters shall be subject to the provisions of Minnesota
Statute, Chapter 105. Community -wide structural works for
flood control intended to remove areas from the regulatory
flood plain shall not be allowed in the floodway.
8. A levee, dike or floodwall constructed in the floodway
shall not cause an increase to the 100-year or regional flood
and the technical analysis must assume equal conveyance or
storage Loss on both sides of a stream.
SECTION 304.060 FLOOD FRINGE DISTRICT (FF)
A. EarmittP.d ucAq: Permitted Uses shall be those uses of land
or structures listed as Permitted Uses in the underlying zoning
use district(s). If no pre-existing, underlying zoning use
districts exist, then any residential or non residential structure
or use of a structure or land shall be a Permitted Use in the
Flood Fringe provided such use does not constitute a public
nuisance.
B. Standards for Flood Frinae Permitted. Uses:
1. All structures, including accessory structures, must be
elevated on fill so that the lowest floor including basement
floor is at or above the Regulatory Flood Protection
Elevation. The finished fill elevation for structures shall
be no lower than one (1) foot below the Regulatory Flood
Protection Elevation and the fill shall extend at such
elevation at least fifteen (15) feet beyond the outside
limits of the structure erected thereon.
2. As an alternative to elevation on fill, accessory
structures that constitute a minimal investment and that do
not exceed 500 square feet for the outside dimension at
ground level may be internally flood proofed in accordance
with Section 304.050 5. (c).
3. The cumulative placement of fill where at any one time
in excess of one -thousand (1,000) cubic yards of fill is
located on the parcel shall be allowable only as a
Conditional Use, unless said fill is specifically intended to
elevate a structure in accordance with Section 304.060 B. of
this ordinance.
4. The storage of any materials or equipment shall be
elevated on fill to the Regulatory Flood Protection
Elevation.
C. Conditional Users: Any structure that is not elevated on fill
or flood proofed in accordance with Section 304.060 B.1. and 2. or
any use of land that does not comply with the standards in Section
304.060 B.3. and 4. shall only be allowable as a Conditional Use.
An application for a Conditional Use shall be subject to the
standards and criteria and evaluation procedures specified in
Sections 304.110 of this Ordinance.
D. Standards for Flood Frinae Conditional Uses:
1. Alternative elevation methods other than the use of fill
may be utilized to elevate a structure's lowest floor above
the Regulatory Flood Protection Elevation. These alternative
methods may include the use of stilts, pilings, parallel
walls, etc., or above -grade, enclosed areas such as crawl
9
spaces or tuck under garages. The base or floor of an
enclosed area shall be considered above -grade and not a
structure's basement or lowest floor if: 1) the enclosed
area is above -grade on at least one side of the structure; 2)
it is designed to internally flood and is constructed with
flood resistant materials; and 3) it is used solely for
parking of vehicles, building access or storage. The above -
noted alternative elevation methods are subject to the
following additional standards:
(a) Design and Certification - The structure's design
and as -built condition must be certified by a registered
professional engineer or architect as being in compliance
with the general design standards of the State Building
Code and, specifically, that all electrical, heating,
ventilation, plumbing and air conditioning equipment and
other service facilities must be at or above the
Regulatory Flood Protection Elevation or be designed to
prevent flood water from entering or accumulating within
these components during times of flooding.
(b) Specific Standards for Above -grade, Enclosed Areas
- Above -grade, fully enclosed areas such as crawl spaces
or tuck under garages must be designed to internally
flood and the design plans must stipulate:
(1) The minimum area of openings in the walls where
internal flooding is to be used as a flood proofing
technique. When openings are placed in a
structure's walls to provide for entry of flood
waters to equalize pressures, the bottom of all
openings shall be no higher than one -foot above
grade. Openings may be equipped with screens,
louvers, valves, or other coverings or devices
provided that they permit the automatic entry and
exit of flood waters.
(2) That the enclosed area will be designed of
flood resistant materials in accordance with the
FP-3 or FP-4 classifications in the State Building
Code and shall be used solely for building access,
parking of vehicles or storage.
2. Basements, as defined by Section 304.030 of this
Ordinance, shall be subject to the following:
(a) Residential basement construction shall not be
allowed below the Regulatory Flood Protection Elevation.
(b) All areas of non residential structures including
non-residential basements to be placed below the
Regulatory Flood Protection Elevation shall be flood
proofed in accordance with the structurally dry flood
proofing classifications in the State Building Code.
10
Structurally dry flood proofing must meet the FP-1 or
FP-2 flood proofing classification in the State Building
Code and this shall require making the structure
watertight with the walls substantially impermeable to
the passage of water and with structural components
having the capability of resisting hydrostatic and
hydrodynamic loads and the effects of buoyancy.
Structures flood proofed to the FP-3 or FP-4
classification shall not be permitted.
3. When at any one time more than 1,000 cubic yards of fill
or other similar material is located on a parcel for such
activities as on -site storage, landscaping, sand and gravel
operations, landfills, roads, dredge spoil disposal or
construction of flood control works, an erosion/sedimentation
control plan must be submitted unless the community is
enforcing a state approved shoreland management ordinance.
In the absence of a state approved shoreland ordinance, the
plan must clearly specify methods to be used to stabilize the
fill on site for a flood event at a minimum of the 100-year
or regional flood event. The plan must be prepared and
certified by a registered professional engineer or other
qualified individual acceptable to the Governing Body. The
plan may incorporate alternative procedures for removal of
the material from the flood plain if adequate flood warning
time exists.
4. Storage of Materials and Equipment:
(a) The storage or processing of materials that are, in
time of flooding, flammable, explosive, or potentially
injurious to human, animal, or plant life is prohibited.
(b) Storage of other materials or equipment may be
allowed if readily removable from the area within the
time available after a flood warning and in accordance
with a plan approved by the Governing Body.
E. Standardq fnr All Flnnrl Fringe Uses:
1. All new principal structures must have vehicular access
at or above an elevation not more than two (2) feet below the
Regulatory Flood Protection Elevation. If a variance to this
requirement is granted, the Board of Adjustment must specify
limitations on the period of use or occupancy of the
structure for times of flooding and only after determining
that adequate flood warning time and local flood emergency
response procedures exist.
2. Commercial Uses - accessory land uses, such as yards,
railroad tracks, and parking lots may be at elevations lower
than the Regulatory Flood Protection Elevation. However, a
permit for such facilities to be used by the employees or the
11
general public shall not be granted in the absence of a flood
warning system that provides adequate time for evacuation if
the area would be inundated to a depth greater than two feet
or be subject to flood velocities greater than four feet per
second upon occurrence of the regional flood.
3. Manufacturing and Industrial Uses - measures shall be
taken to minimize interference with normal plant operations
especially along streams having protracted flood durations.
Certain accessory land uses such as yards and parking lots
may be at lower elevations subject to requirements set out in
Section 304.060 E.2. above. In considering permit
applications, due consideration shall be given to needs of an
industry whose business requires that it be located in flood
plain areas.
4. Fill shall be properly compacted and the slopes shall be
properly protected by the use of rip -rap, vegetative cover or
other acceptable method. The Federal Emergency Management
Agency (FEMA) has established criteria for removing the
special flood hazard area designation for certain structures
properly elevated on fill above the 100-year flood elevation -
FEMA's requirements incorporate specific fill compaction and
side slope protection standards for multi -structure or multi -
lot developments. These standards should be investigated
prior to the initiation of site preparation if a change of
special flood hazard area designation will be requested.
5. Flood plain developments shall not adversely affect the
hydraulic capacity of the channel and adjoining flood plain
of any tributary watercourse or drainage system where a
floodway or other encroachment limit has not been specified
on the Official Zoning Map.
6. All manufactured homes must be securely anchored to an
adequately anchored foundation system that resists flotation,
collapse and lateral movement. Methods of anchoring may
include, but are not to be limited to, use of over -the -top or
frame ties to ground anchors. This requirement is in
addition to applicable state or local anchoring requirements
for resisting wind forces.
SECTION 304.070 GENERAL FLOOD PLAIN DISTRICT
A. Perrni i b1P uses: The uses listed in Section 304.060 A. of
this Ordinance shall be permitted uses. All other uses shall be
subject to the floodway/flood fringe evaluation criteria pursuant
to Section 304.070 B. below. Section 304.050 shall apply if the
proposed use is in the Floodway District and Section 304.060 shall
apply if the proposed use is in the Flood Fringe District.
12
B. PrnrednrP.s for rloodway and Flood FrinaP fPterminatinn%
Within the AAnPra1 Flnnd fain nistrint.
1. Upon receipt of an application for a Conditional Use
Permit for a use within the General Flood Plain District, the
applicant shall be required to furnish such of the following
information as is deemed necessary by the Zoning
Administrator for the determination of the Regulatory Flood
Protection Elevation and whether the proposed use is within
the Floodway or Flood Fringe District.
(a) A typical valley cross-section showing the channel
of the stream, elevation of land areas adjoining each
side of the channel, cross -sectional areas to be
occupied by the proposed development, and high water
information.
(b) Plan (surface view) showing elevations or contours
of the ground; pertinent structure, fill, or storage
elevations; size, location, and spatial arrangement of
all proposed and existing structures on the site;
location and elevations of streets; photographs showing
existing land uses and vegetation upstream and
downstream; and soil type.
(c) Profile showing the slope of the bottom of the
channel or flow line of the stream for at least 500 feet
in either direction from the proposed development.
2. The applicant shall be responsible to submit one copy of
the above information to a designated engineer or other
expert person or agency for technical assistance in
determining whether the proposed use is in the Floodway or
Flood Fringe District and to determine the Regulatory Flood
Protection Elevation. Procedures consistent with Minnesota
Regulations 1983, Parts 6120.5000 - 6120.6200 shall be
followed in this expert evaluation. The designated engineer
or expert is strongly encouraged to discuss the proposed
technical evaluation methodology with the respective
Department of Natural Resources' Area Hydrologist prior to
commencing the analysis. The designated engineer or expert
shall:
(a) Estimate the peak discharge of the regional flood.
(b) Calculate the water surface profile of the regional
flood based upon a hydraulic analysis of the stream
channel and overbank areas.
(c) Compute the floodway necessary to convey or store
the regional flood without increasing flood stages more
than 0.5 foot. A lesser stage increase than .5' shall
be required if, as a result of the additional stage
13
increase, increased flood damages would result. An
equal degree of encroachment on both sides of the stream
within the reach shall be assumed in computing floodway
boundaries.
3. The Zoning Administrator shall present the technical
evaluation and findings of the designated engineer or expert
to the Governing Body. The Governing Body must formally
accept the technical evaluation and the recommended Floodway
and/or Flood Fringe District boundary or deny the permit
application. The Governing Body, prior to official action,
may submit the application and all supporting data and
analyses to the Federal Emergency Management Agency, the
Department of Natural Resources or the Planning Commission
for review and comment. Once the Floodway and Flood Fringe
Boundaries have been determined, the Governing Body shall
refer the matter back to the Zoning Administrator who shall
process the permit application consistent with the applicable
provisions of Section 304.050 and 304.060 of this Ordinance.
SECTION 304.080 PUBLIC UTILITIES, RAILROADS, ROADS, AND
BRIDGES
A. Pnhlic ttri,lities.. All public utilities and facilities such
as gas, electrical, sewer, and water supply systems to be located
in the flood plain shall be flood -proofed in accordance with the
State Building Code or elevated to above the Regulatory Flood
Protection Elevation.
B. Public! Tranaonrtati r Fat`4l4riaa, Railroad tracks, roads,
and bridges to be located within the flood plain shall comply with
Sections 304.050 and 304.060 of this Ordinance. Elevation to the
Regulatory Flood Protection Elevation shall be provided where
failure or interruption of these transportation facilities would
result in danger to the public health or safety or where such
facilities are essential to the orderly functioning of the area.
Minor or auxiliary roads or railroads may be constructed at a
lower elevation where failure or interruption of transportation
services would not endanger the public health or safety.
C. nn-Rite Sewaap Traarment and WatPr Simply Systems. Where
public utilities are not provided: 1) On -site water supply
systems must be designed to minimize or eliminate infiltration of
flood waters into the systems; and 2) New or replacement on -site
sewage treatment systems must be designed to minimize or eliminate
infiltration of flood waters into the systems and discharges from
the systems into flood waters and they shall not be subject to
impairment or contamination during times of flooding. Any sewage
treatment system designed in accordance with the State's current.
state-wide standards for on -site sewage treatment systems shall be
determined to be in compliance with this Section.
14
SECTION 304.090 ADMINISTRATION
A. Znnina Administratnr: A Zoning Administrator or other
official designated by the Governing Body shall administer and
enforce this Ordinance. If the Zoning Administrator finds a
violation of the provisions of this Ordinance the Zoning
Administrator shall notify the person responsible for such
violation in accordance with the procedures stated in Section
304.120 of the Ordinance.
B. permit Rpollirements. A Permit issued by the Zoning
Administrator in conformity with the provisions of this Ordinance
shall be secured prior to the erection, addition, or alteration of
any building, structure, or portion thereof; prior to the use or
change of use of a building, structure, or land; prior to the
change or extension of a nonconforming use; and prior to the
placement of fill, excavation of materials, or the storage of
materials or equipment within the flood plain.
C. Anolinatinn for Permit. Application for a Permit shall be
made in duplicate to the Zoning Administrator on forms furnished
by the Zoning Administrator and shall include the following where
applicable: plans in duplicate drawn to scale, showing the
nature, location, dimensions, and elevations of the lot; existing
or proposed structures, fill, or storage of materials; and the
location of the foregoing in relation to the stream channel.
D. State and Federal Permits. Prior to granting a Permit or
processing an application for a Conditional Use Permit or
Variance, the Zoning Administrator shall determine that the
applicant has obtained all necessary State and Federal Permits.
E. Certificate of Zonina Compliance for a New, Altered. 9L
Nonconformina Use. It shall be unlawful to use, occupy, or permit
the use or occupancy of any building or premises or part thereof
hereafter created, erected, changed, converted, altered, or
enlarged in its use or structure until a Certificate of Zoning
Compliance shall have been issued by the Zoning Administrator
stating that the use of the building or land conforms to the
requirements of this Ordinance.
F. Constr'Iction acd Use to be as provided on Aonlirations,
plans. Permits. Variances and Certificates of Zoning Compli?nrp.
Permits, Conditional Use Permits, or Certificates of Zoning
Compliance issued on the basis of approved plans and applications
authorize only the .use, arrangement, and construction set forth in
such approved plans and applications, and no other use,
arrangement, or construction. Any use, arrangement, or
construction at variance with that authorized shall be deemed a
violation of this Ordinance, and punishable as provided by Section
304.130 of this Ordinance.
15
G. Cerrificar4on,. The applicant shall be required to submit
certification by a registered professional engineer, registered
architect, or registered land surveyor that the finished fill and
building elevations were accomplished in compliance with the
provisions of this ordinance. Flood-proofing.measures shall be
certified by a registered professional engineer or registered
architect.
H. Record of First Floor Elevation. The Zoning Administrator
shall maintain a record of the elevation of the lowest floor
(including basement) of all new structures and alterations or
additions to existing structures in the flood plain. The Zoning
Administrator shall also maintain a record of the elevation to
which structures or alterations and additions to structures are
flood -proofed.
I. Snhdivision.a,. No land shall be subdivided which is
unsuitable for the reason of flooding, inadequate drainage, water
supply or sewage treatment facilities. All lots within the flood
plain districts shall contain a building site at or above the
Regulatory Flood Protection Elevation. All subdivisions shall
have water and sewage treatment facilities that comply with the
provisions of this Ordinance and have road access both to the
subdivision and to the individual building sites no lower than two
feet below the Regulatory Flood Protection Elevation. For all
subdivisions in the flood plain, the Floodway and Flood Fringe
boundaries, the Regulatory Flood Protection Elevation and the
required elevation of all access roads shall be clearly labelled
on all required subdivision drawings and platting documents. For
all residential structures in the flood plain, the floodway and
the flood fringe boundaries, the basement construction or the
lowest floor if there is no basement shall not be allowed below
the Regulatory Flood Protection Elevation.
SECTION 304.100 BOARD AND ADJUSTMENT AND APPEALS
A. Ruing. The Board of Adjustment shall adopt rules for the
conduct of business and may exercise all of the powers conferred
on such Boards by State law.
B. Administrative Review. The Board shall hear and decide
appeals where it is alleged there is error in any order,
requirement, decision, or determination made by an administrative
official in the enforcement or administration of this Ordinance.
C. Variances. The Board may authorize upon appeal in specific
cases such relief or variance from the terms of this Ordinance as
will not be contrary to the public interest and only for those
circumstances such as hardship, practical difficulties or
circumstances unique to the property under consideration, as
provided for in the respective enabling legislation for planning
and zoning for cities or counties as appropriate. In the granting
16
of such variance, the Board of Adjustment shall clearly identify
in writing the specific conditions that existed consistent with
the criteria specified in the respective enabling legislation
which justified the granting of the variance. No Variance shall
have the effect of allowing in any district uses prohibited in
that district, permit a lower degree of flood protection than the
Regulatory Flood Protection Elevation for the particular area, or
permit standards lower than those required by State law.
D. Hearings, Upon filing with the Board of Adjustment of an
appeal from a decision of the Zoning Administrator, or an
application for a variance, the Board shall fix a reasonable time
for a hearing and give due notice to the parties in interest as
specified by law. The Board shall submit by mail to the
Commissioner of Natural Resources a copy of the application for
proposed Variances sufficiently in advance so that the
Commissioner will receive at least ten days notice of the hearing.
E. Decisions. The Board shall arrive at a decision on such
appeal or Variance within 30 days. In passing upon an appeal, the
Board may, so long as such action is in conformity with the
provisions of this Ordinance, reverse or affirm, wholly or in
part, or modify the order, requirement, decision or determination
of the Zoning Administrator or other public official. It shall
make its decision in writing setting forth the findings of fact
and the reasons for its decisions. In granting a Variance the
Board may prescribe appropriate conditions and safeguards such as
those specified in Section 304.100, which are in conformity with
the purposes of this Ordinance. Violations of such conditions and
safeguards, when made a part of the terms under which the Variance
is granted, shall be deemed a violation of this Ordinance
punishable under Section 304.130. A copy of all decisions
granting Variances shall be forwarded by mail to the Commissioner
of Natural Resources within ten (10) days of such action.
F. Appeals. Appeals from any decision of the Board may be made,
and as specified in Section 301.060 C. Minnesota Statutes.
G. Flood Tnsurance Notice and Record Keeoina. The Zoning
Administrator shall notify the applicant for a variance that: 1)
The issuance of a variance to construct a structure below the base
flood level will result in increased premium rates for flood
insurance up to amounts as high as $25 for $100 of insurance
coverage and 2) Such construction below the 100-year or regional
flood level increases risks to life and property. Such
notification shall be maintained with a record of all variance
actions. A community shall maintain a record of all variance
actions, including justification for their issuance, and report
such variances issued in its annual or biennial report submitted
to the Administrator of the National Flood Insurance Program.
17
SECTION 304.110 CONDITIONAL USES
The Planning Commission shall hear and decide applications for
Conditional Uses permissible under this Ordinance. Applications
shall be handled in accordance with Section 301.060 D.
A. Rearinas. Upon filing with the City of Lake Elmo an
application for a Conditional Use Permit, the City Council shall
submit by mail to the Commissioner of Natural Resources a copy of
the application for proposed Conditional Use sufficiently in
advance so that the Commissioner will receive at least ten days
notice of the hearing.
B. procedures to he fnllnwed by the City of Take Flmn in P9ssina,
nn Cnndit,inra1 Use permit Applications Within all Flood Plain
Distr1rt.
1. Require the applicant to furnish such of the following
information and additional information as deemed necessary by
the City Council for determining the suitability of the
particular site for the proposed use:
(a) Plans drawn to scale showing the nature, location,
dimensions, and elevation of the lot, existing or
proposed structures, fill, storage of materials, flood -
proofing measures, and the relationship of the above to
the location of the stream channel.
(b) Specifications for building construction and
materials, flood -proofing, filling, dredging, grading,
channel improvement, storage of materials, water supply
and sanitary facilities.
(c) Transmit one copy of the information described
above to a designated engineer or other expert person or
agency for technical assistance, where necessary, in
evaluating the proposed project in relation to flood
heights and velocities, the seriousness of flood damage
to the use, the adequacy of the plans for protection,
and other technical matters.
(d) Based upon the technical evaluation of the
designated engineer or expert, the City Council shall
determine the specific flood hazard at the site and
evaluate the suitability of the proposed use in relation
to the flood hazard.
C. Factors Upon Which the Decision of the City Council Shall Be
Based. In passing upon Conditional Use applications, the City of
Lake Elmo shall consider all relevant factors specified in other
sections of this Ordinance, and:
18
1. The danger to life and property due to increased flood
heights or velocities caused by encroachments.
2. The danger that materials may be swept onto other lands
or downstream to the injury of others or they may block
bridges, culverts or other hydraulic structures.
3. The proposed water supply and sanitation systems and the
ability of these systems to prevent disease, contamination,
and unsanitary conditions.
4. The susceptibility of the proposed facility and its
contents to flood damage and the effect of such damage on the
individual owner.
5. The
facility
6. The
location.
importance of the services provided by the proposed
to the community.
requirements of the facility for a waterfront
7. The availability of alternative locations not subject to
flooding for the proposed use.
S. The compatibility of the proposed use with existing
development and development anticipated in the foreseeable
future.
9. The relationship of the proposed use to the
comprehensive plan and flood plain management program for the
area.
10. The safety of access to the property in times of flood
for ordinary and emergency vehicles.
11. The expected heights, velocity, duration, rate of rise,
and sediment transport of the flood waters expected at the
site.
12. Such other factors which are relevant to the purposes of
this Ordinance.
D. Cnndition.Attached to Conditional Use Permits, Upon
consideration of the factors listed above and the purpose of this
Ordinance, the City of Lake Elmo shall attach such conditions to
the granting of Conditional Use Permits as it deems necessary to
fulfill the purposes of this Ordinance. Such conditions may
include, but are not limited to, the following:
1. Modification of waste treatment and water supply
facilities.
2. Limitations on period of use, occupancy, and operation.
19
3. Imposition of operational controls, sureties, and deed
restrictions.
4. Requirements for construction of channel modifications,
compensatory storage, dikes, levees, and other protective
measures.
5. Flood-proofing'measures, in accordance with the State
Building Code and this Ordinance. The applicant shall submit
a plan or document certified by a registered professional
engineer or architect that the flood -proofing measures are
consistent with the Regulatory Flood Protection Elevation and
associated flood factors for the particular area.
SECTION 303.120 NONCONFORMING USES
A. A structure or the use of a structure or premises which was
lawful before the passage or amendment of this Ordinance but which
is not in conformity with the provisions of this Ordinance may be
continued subject to the following conditions:
1. No such use shall be expanded, changed, enlarged, or
altered in a way which increases its nonconformity.
2. Any alteration or addition to a nonconforming structure
or nonconforming use which would result in increasing the
flood damage potential of that structure or use shall be
protected to the Regulatory Flood Protection Elevation in
accordance with any of the elevation on fill or flood
proofing techniques (i.e. , FP-1 through FP-4 flood proofing
classifications) allowable in the State Building Code, except
as further restricted below.
3. The cost of any structural alterations or additions to
any nonconforming structure over the life of the structure
shall not exceed 50 percent of the market value of the
structure unless the conditions of this Section are
satisfied. The cost of all structural alterations and
additions constructed since the adoption of the Community's
initial flood plain controls must be calculated into today's
current cost which will include all costs such as
construction materials and a reasonable cost placed on all
manpower or labor. If the current cost of all previous and
proposed alterations and additions exceeds 50 percent of the
current market value of the structure, then the structure
must meet the standards of Section 4.0 or 5.0 of this
Ordinance for new structures depending upon whether the
structure is in the Floodway or Flood Fringe, respectively.
20
4. If any nonconforming use is discontinued for 12
consecutive months, any future use of the building premises
shall conform to this Ordinance. The assessor shall notify
the Zoning Administrator in writing of instances of
nonconforming uses which have been discontinued for a period
of 12 months.
5. If any nonconforming use or structure is destroyed by
any means, including floods, to an extent of 50 percent or
more of its market value at the time of destruction, it shall
not be reconstructed except in conformity with the provisions
of this Ordinance. The applicable provisions for
establishing new uses or new structures in Sections 304.050,
304.060 or 304.070 will apply depending upon whether the use
or structure is in the Floodway, Flood Fringe or General
Flood Plain District, respectively.
SECTION 304.130 PENALTIES FOR VIOLATION
A. Violation of the provisions of this Ordinance or failure to
comply with any of its requirements (including violations of
conditions and safeguards established in connection with grants of
Variances or Conditional Uses) shall constitute a misdemeanor and
shall be punishable
as defined by law.
B. Nothing herein contained shall prevent the City of Lake Elmo
from taking such other lawful action as is necessary to prevent or
remedy any violation. Such actions may include but are not
limited to:
1. In responding to a suspected ordinance violation, the
Zoning Administrator and Local Government may utilize the
full array of enforcement actions available to it including
but not limited to prosecution and fines, injunctions, after -
the -fact permits, orders for corrective measures or a request
to the National Flood Insurance Program for denial of flood
insurance availability to the guilty party. The community
must act in good faith to enforce these official controls and
to correct ordinance violations to the extent possible so as
not to jeopardize its eligibility in the National Flood
Insurance Program.
2. When an ordinance violation is either discovered by or
brought to the attention of the Zoning Administrator, the
Zoning Administrator shall immediately investigate the
situation and document the nature and extent of the violation
of the official control. As soon as is reasonably possible,
this information will be submitted to the appropriate
Department of Natural Resources' and Federal Emergency
Management Agency Regional Office along with the Community's
plan of action to correct the violation to the degree possible.
21
3. The Zoning Administrator shall notify the suspected
party of the requirements of this Ordinance and all other
Official Controls and the nature and extent of the suspected
violation of these controls. If the structure and/or use is
under construction or development, the Zoning Administrator
may order the construction or development immediately halted
until a proper permit or approval is granted by the
Community. If the construction or development is already
completed, then the Zoning Administrator may either (1) issue
an order identifying the corrective actions that must be made
within a specified time period to bring the use or structure
into compliance with the official controls, or (2) notify the
responsible party to apply for an after -the -fact permit/
development approval within a specified period of time not to
exceed 30-days.
4. If the responsible party does not appropriately respond
to the Zoning Administrator within the specified period of
time, each additional day that lapses shall constitute an
additional violation of this Ordinance and shall be
prosecuted accordingly. The Zoning Administrator shall also
upon the lapse of the specified response period notify the
landowner to restore the land to the condition which existed
prior to the violation of this Ordinance.
SECTION 304.140 AMENDMENTS
The flood plain designation on the Official Zoning Map shall not
be removed from flood plain areas unless it can be shown that the
designation is in error or that the area has been filled to or
above the elevation of the regional flood and is contiguous to
lands outside the flood plain. Special exceptions to this rule
may be permitted by the Commissioner of Natural Resources if he
determines that, through other measures, lands are adequately
protected for the intended use.
All amendments to this Ordinance, including amendments to the
Official Zoning Map, must be submitted to and approved by the
Commissioner of Natural Resources prior to adoption. Changes in
the Official Zoning Map must meet the Federal Emergency Management
Agency's (FEMA) Technical Conditions and Criteria and must receive
prior FEMA approval before adoption. The Commissioner of Natural
Resources must be given 10-days written notice of all hearings to
consider an amendment to this Ordinance and said notice shall
include a draft of the ordinance amendment or technical study
under consideration.
22
(204.015)
of the year; and a new Vice Chairperson shall be elected by
the Commission at a Special Election to be held at the next
regularly scheduled Commission meeting, after at least two
days written notice to each Commission member. The Secretary
shall perform those duties assigned by State Statute only.
A recording secretary shall be appointed by the City Council
to take and keep the minutes and records of the Commission.
204.016 Annual Meeting. The Commission shall hold an annual
meeting. the second Monday in the month of January in each
year. Such meeting shall be devoted to the election of of-
ficers and such other business as -,shall be scheduled.
204.017 Annual Work Plan. The Planning Commission shall meet
with the City Council at their first meeting in May each year
to develop an annual work plan, including a list of projects,
points of interaction on projects, programs and goals for the
year. 4
204.018 Regular Meetings. Regular meetings shall be held in
the City Hall at 7:30 p.m. on the second and fourth Mondays
of each month. No action shall be taken in the absence of a
quorum except to adjourn the meeting to a subsequent date. A
regular meeting may be cancelled or rescheduled by the Commis-
sion at a prior meeting or if there are no scheduled agenda
items on the Thursday prior to the meeting. All action taken
by the commission shall be by the affirmative vote of a
majority of the members present.
204.019 Special Meetings. Special meetings of the Commission
shall be held in the City Hall at a time and place designated
or at a public place at a time designated and shall be called
by the Chairperson. Upon the written request of at least
four members the Chairperson shall be required to call a Spe-
cial meeting to be held within seven days of the request.
Written notice thereof shall be given to all members not less
than forty-eight hours in advance of the meeting.
204.020 Ouorum. A quorum shall consist of two-thirds (2/3)
of the members,
204.021 Voting. Each member attending any meeting shall be
entitled to cast one vote. Voting shall be by voice vote.
In the event that any member shall have a personal interest
of any kind in the matter then before the Commission, he shall
disclose his interest and be disqualified from voting upon the
matter, and the Secretary shall record in the minutes that no
vote was cast by such member. Alternate members shall be
entitled to cast one vote in the absence of any member. The
second alternate shall be entitled to cast one vote in the
absence of any two members.
Amended by Ord. 7934
204-2
LAKE ELMO PLANNING COMMISSION MINUTES JANUARY 8, 1990 PAGE 4
7. COMPREHENSIVE PLAN
Councilman Todd Williams encouraged every PZ member to attend at least
one PZ seminar every year they are on board. Todd felt even the
experienced members would get additional insight and knowledge at
these various seminars. The City staff will inform the PZ when they
come up.
Williams urged the PZ to follow the direction given by the City
Council at its November 21st meeting. The Council requested the PZ to
come to a consensus on any changes on the Plan they feel should be
made. The consensus does not have to be 100% unanimous.
The PZ called a workshop on the Comprehensive Plan for Thursday,
1/11/90, at 7:00 p.m. in the Conference Room at City Hall.
8. OTHER:
A. WORK PLAN
The Commission agreed the Work Plan will not be discussed until the
Comprehensive Plan is completed.
B. Set up a Public Hearing for PUD's
The Commission requested setting up a public hearing for elimination
of the PUD. Staff suggested waiting because "The Forest" application
is in the final stages of a Planned Residential Development, and they
didn't want to eliminate something that they are still working on.
OTHER: ELECTION OF OFFICERS
Chairman Rob Enes did not show up for the meeting. The Commission
desired a seventh member in case of a tie vote and recommended tabling
this. Therefore, the following motion was made:
M/S/P Bucheck/John - to table the election of officers until the next
PZ meeting. (Motion carried 6-0).
M/S/P Johnson/Conlin - to adjourn the Planning Commission meeting at
10:36 p.m. (Motion carried 6-0).
1989 PLANNING COMMISSION WORK PLAN
PRIORITIZED BY THE CITY COUNCIL ON MAY 16, 1989
1.R.Review all applications in accordance to the Comprehensive Plan,
comment and make recommendations to the City Council.
2.A.Complete the revision of the Comprehensive Plan and update
Ordinances to relate to the Plan.
3.8.Consider local responses to State of MN proposed revisions to
Shoreland Management regulations.
4.A.Residential Estates Zoning
a. Definition and Length of cul-de-sacs.
b. Road Design
c. Creation of a volunteer, City Forester Position
S.Q.Review of Highway Business Zoning on I-94.
6.B•Building height limitation --Eliminate the exception which allows
broadcast transmission towers.
7.B.Stronger restrictions for accessory structures in the R1 Zone --
the size and number of parcels of less than 5 acres. Definition
of garage and storage accessory structures. Size and number of
accessory structures in RR Zone on parcels of 20 acres or more.'
(Check amended ordinances).
8.C.Conditions or possible restrictions on residential subdivisions
wherelarge accessory structures exist.
9.C.Meet with the county and adjacent community planners to discuss
common issues on an "as -needed" basis.
10.R.Future Road Plan (ties in with road design).
11:S.Retention of wildlife habitat and wetland areas --adequacy of
wetland overlay district.
12.B:1-Recommend to the City Council a committee be established, comprising
of PZ members, business owners, and interested residents
(5-7 members) to study an Historic Building/Architectural Design
Overlay District in the Old Village Area.
13.C,Adopt an ordinance for utility (pipeline and power lines) setbacks
in the City's Subdivision and platting regulations.
14.C.Sign Ordinance
15.C..Review sideyard setbacks relative to lot size.
16.C.Amend the Subdivision Ordinances (Section 400-14, 400-15)
requesting the signatures on the Certificate for approval by
the Chairman and Secretary of the Planning Commission.
*A - TOP PRIORITY
LAKE ELMO CITY COUNCIL MINUTES NOVEMBER 21, 1989
FILL ORDINANCE WITH ESCROW
Mayor Dunn liked the idea of a fill ordinance with an escrow and would
like the Planning Commission and staff to work on a proposed
ordinance.
M/S/P Hunt/Williams - the Planning Commission be directed at their
December llth meeting to consider placing on their list of work items
(as a Class A Priority, 1990), creation of a fill ordinance that would
incorporate escrow amounts based on the cost of removal of fill and
taking into account the fact that a site and grading plan be submitted
before the fill permit is approved and consider any other aspect th PZ
seems appropriate. (Motion carried 4-0).