HomeMy WebLinkAbout04-26-04 & 04-12-04 PZM1 MY OF
LAKE
ELMO
C v Lake Elmo 651 /777-5510
3800 Laverne Avenue North / Lake Elmo, MN 55042
The Lake Elmo Planning Commission
Will hold a meeting on
Monday, April 26, 2004 at 7:00 p.m.
in Council Chambers,
Lake Elmo City Hall
3800 Laverne Ave. N.
Lake Elmo, MN 55042
AGENDA
1) Pledge of Allegiance
2) Agenda
3) Minutes of April 12, 2004
4) Public Hearing: CUP Amendment — Country Sure Farm
5) 520 Site Plan — Addition to Building — Retail Construction
6) City Council Update
7) Adjourn
The public is invited to attend.
ILO printed an recycled paper
AMENDED,APPROVED: MAY 10, 2004
City of Lake Elmo
Planning Commission Meeting
Minutes of April 26, 2004
Chairman Helwig called to order the Planning Commission Meeting at 7:00 p.m. COMMISSIONERS
PRESENT: Pelletier, Van Pelt, Deziel, Berg, Helwig, Sessing, Sedro, Bunn, and Johnson. STAFF
PRESENT: Chuck Dillerud, City Planner and Kimberly Schaffel, Recording Secretary.
PLEDGE OF ALLEGIANCE
AGENDA
M/S/P, Berg/Johnson, To accept the Agenda as presented. VOTE: 9:0.
MINUTES OF APRIL 12, 2004
MIS/P, Sessing/Johnson, To accept the Minutes of April 12, 2004 as presented. VOTE: 7:0:2 (Abstain:
Deziel/Sedro).
PUBLIC HEARING: CUP AMENDMENT — COUNTRY SUN FARM
The Planner presented the applicant's plans for an expansion of the CUP to add two greenhouses to the
retail structure at Country Sun Farm. He reported that the applicant proposes to add a greenhouse to the
east and a greenhouse to the west of the existing sales facility; and that there is significant history on this
site dating back to at least the early 1980's, when the city approved the first Conditional Use Permit. He
noted that he could not determine the basis of approval of the CUP with a retail sales structure included,
since the Zoning Ordinance appears to only allow "Open Sales Lots" in the AG zone in which this site is
located.
The Planner explained that this proposal would effectively result in an addition to the retail facility, since
customers circulating through them. He observed that allowing continued retail growth on this site may
be creating a de facto retail zone. If the landscape material growing use ever ended, it might be difficult
to prevent another type of retail use of this site in the future.
The Planner said that another issue is access off of Highway 36. He reported that Mn/DOT would like to
see that Highway 36 access disappear some day due to safety considerations. He also suggested to the
Commission that increasing volumes of retail use on this site will compound the traffic safety
consideration, while noting that the signalization of Highway 36/Lake Elmo Avenue may mitigate one
safety problem created by `U-Turns' by westbound traffic on Highway 36 to access the site.
The Planner noted that when the AG Minor Subdivision Cluster Development was recently approved for
this site, the side setback standard was effectively reduced from 200 feet to 10 feet, resulting in the
proposed 37.5 side setback for the east expansion becoming Code compliant.
The Planner said the city allowed a retail structure on this site in 1984, but now staff suggests it might be
wise to recommend denial of the CUP amendment based on the de facto increase in the retailing function
that would result in the AG zoning district, and the potential for the expanded facility to attract more retail
traffic, compounding the Highway 36 safety problems He observed that, if greenhouses were instead
placed elsewhere on this 47 acre site, the retail would not be functionally expanded while the growing
function would be.
Commissioner Bunn asked if the city has any other retail outlet on Highway 36. The Planner replied that
there is Lauseng Stone, but none others that access Highway 36
Commissioner Bunn asked about plans for this intersection. The Planner said that between 694 and the
river, limited access is allowed, but most will be closed to access over time. Grant and Lake Elmo
received the Highway 36 Study from Mn/DOT, and neither adopted that report. The plan said that some
intersections along Highway 36 might become overpasses.
Lake Elmo Planning Commission Minutes of April 26, 2004 1
( 1
AMENDED/APPROVED: MAY 10, 2004
Commissioner Bunn asked if the city knows the proportion of retail products sold at this site from off -site
sources versus what is grown and sold on -site. The Planner said the applicant grows most of what is sold,
and sells some collateral products related to the growing business.
Commissioner Berg pointed out that the Site Plan was a little bit thin in details. He asked about the
increased safety that could be expected from the new traffic signal at 36 and Lake Elmo Avenue. The
Planner said that with the improvements at that intersection, it will be safer for motorists.
Keith Bergmann, Owner
Keith, Chad, Troy, Eileen, and Richard Bergmann were all in attendance. Keith Bergmann prepared a
response to the staff report, and that was distributed to the commission. He read that response to the
commission. That response is attached to these minutes.
Commissioner Van Pelt said he is supportive of what the family is trying to do. He said he appreciates
how nice everything looks at the site. He noted that the applicant presented an eloquent case for
additional growing space, but he said it appears that the Bergmanns started out with an expansion plan
that was not for growing at all. Keith Bergmann explained that the original plan was to add a greenhouse
to the west side, and on the east side add to the hard building with an expansion of bathrooms for the
customers, a larger break room, and a small office. He continued that the City Planner told the applicants
that such a plan might not get approved, so they changed their plans. He advised the Commission that
less than one-half of that original expansion plan was for retail.
THE CHAIR OPENED THE PUBLIC HEARING AT 7:38 P.M.
The Planner said the city received a call from an adjoining property owner to the east, Leroy Rossow,
indicating he had no objection to the proposal. F1e reported that Mr. Rossow owns about 56 acres, and is
the adjacent property owner on that side of the applicants' site where the setback is proposed to be 10
feet.
Ron Weber
Mr. Weber said he owns property adjacent to Bergmann's on the west side, on Lake Elmo Avenue, and he
has no problem with the proposal.
Doug Dahlbloom
Mr. Dahlbloom said his property is adjacent on the south end, west side. The Bergmanns run a clean
operation. He has no problem with their proposal.
Bill Lundquist
Mr. Lundquist said he lives across the street, and he said he practically does not know what goes on there
at all. The Bergmanns' operation does not affect him at all.
THE CHAIRMAN CLOSED THE PUBLIC HEARING AT 7:42 P.M.
Commission Deziel said there is an inevitable nature with what the commission is dealing with. He said
that if the city is going to preserve AG uses and allow greenhouses as an AG use, a family business is
going to need some marginal growth. The applicant has articulated well what those reasons are. There
are concerns but we have to balance them, and this proposal is well within the balance. Traffic is dealt
with. The only remaining issues are inevitable with growth. He asked if the City is going to clamp down
on home grown businesses, or let them make it in the marketplace.
Commission Sedro asked if retail use fits in requirements for Alternate AG use.
The Planner replied that there are specific ground coverage and CUP area requirements with Alternative
AG. He said the site is large enough to qualify for Alternative AG, but suggested that the CUP Area
Lake Elmo Planning Commission Minutes of April 26, 2004 2
AMENDED/APPROVED: MAY 10, 2004
would be difficult to define, and may already exceed the percentage of total site area specified in
Alternative AG standards.
Commissioner Sedro said Alternative AG might be a nice compromise.
Commission Berg wondered if retail comes with the product or the facility.
Keith Bergmann said the quantity and size of what is grown there will increase. He said they also sell
pottery, chemicals, and fertilizers. If there is a 10% increase in flower sales, hard good sales will
probably also increase by 10%.
Commissioner Berg said he lived where there was AG use, and when a dairy barn was added, that did not
increase the scale of AG use. Keith said if the greenhouse was placed elsewhere on the site, they would
still have the same amount of product flowing through the doors.
Commissioner Van Pelt said he had no strong opinion, but this proposal appears to have started out with a
different purpose and intent. The original design was a material increase in retail space, and nominal
greenhouse increase. Only if the City is comfortable with an increase in retail, should the City approve
this CUP amendment.
Chairman Helwig suggested that anyone making a motion should strongly state the reasons - especially
around the retail issues - in order to put the issue to sleep for twenty years more.
Commissioner Bunn said this site accommodates both a commercial retail space and the growing of small
plants. Growing and sales are duplicated within the proposed space. Originally she was leaning toward
the staff position because of the Comprehensive Plan for this site. Listening to the response by the
applicant about the intended use of the space, she said she is now leaning completely in the other
direction. She observed that the applicant grows most or all of their product at the facility. She suggested
that if Lake Elmo wants agriculture to succeed at all, we have to grow a superior product. She said she
would like to see the city support that goal. She would be comfortable with either this proposal or the
original proposal. A public restroom might be a desirable thing. She would be willing to look at a
portion of this plan being a hard building addition, since most of the use is Alternate AG use, and retail
sales are consistent with AG use.
Commissioner Berg explained that he comes from a family farm, and has a bias in favor of preserving AG
in Lake Elmo. He said he would be comfortable with trying to find a way for the applicant and City to
work something out. He would be willing to table until the applicant talks to Mn/DOT regarding
prohibiting "U-Turns" at Highway 36 and Lake Elmo Avenue.
Keith Bergmann said that the problem with tabling is that the contractor needs a firm date before June 1.
Commissioner Sessing asked the Planner if he knew what the original CUP said. He said the intensity of
use is probably higher today because that is what things grow into. He suggested that slipping the
structure farther to the east is a concern, since the intensity of this use in AG really shouldn't go with the
Cluster Development setback. He said he would like to see 50 foot setback for the greenhouse. He noted
that the normal AG side yard setback standard is 200 feet today.
The Planner said the Commission could recommend an alternative side setback for this plan because it is
a Conditional Use Permit Amendment, where any relevant condition can be added.
Commissioner Sedro said she believes the applicant wants to keep their family farm going, but based on
the City's incremental actions over time, the City may lose control over the true function of the site.
Commission Pelletier said he appreciates the family business, but is very concerned with the safety issue
on Highway 36. She is not comfortable without knowing what Mn/DOT is planning.
Lake Elmo Planning Commission Minutes of April 26, 2004 3
( (
AMENDED/APPROVED: MAY 10, 2004
The Planner said the applicant could join the city requesting a "No U-Turn" sign at that intersection.
Keith Bergmann said he would be glad to also ask the State for the sign, but he thinks it will be a better
situation when the signal light is constructed.
Chairman Helwig asked the applicant to consider maintaining 50 feet setback, and balance the resulting
building addition on both sides.
Keith Bergmann said they would rather not do that.
Commissioner Deziel said he does not wish to redesign without a site plan. He said the additions as
planned mean that there is a lot less use of heating and cooling than if the greenhouse additions were in a
different location. He said it is better to put them together with the existing retail building for energy
efficiency. He observed that there might be a solar gain with this design; and, that the applicant has done
a good job planning it.
Commissioner Van Pelt said there are potential precedents created by approval of this proposal including
retail point -of -sale and relationship to on site -growth. He questioned which other properties in the City
might see this proposal as a precedent?
The Planner stated that he could not think of others beyond the Lindner facility.
Commissioner Van Pelt said his reservations relate to use and its relationship to the present zoning. He
asked if there is any latitude to rezone the property in order to call a duck a duck.
The Planner said the Commission can recommend a Comp Plan Amendment, and rezoning after
appropriate hearings. The city does not do that often. The Planner said the more money that is invested
in retail -capable structures on a site like this; the tougher it will be to say, "No more," some day.
Commission Van Pelt said that if the desire is 4000 square feet more of greenhouse, is there a problem if
the applicant extended the greenhouses more to the south.
Keith Bergmann said they are now located six feet from a large NSP easement to the south. He said he
doubted that the power company would permit structural encroachment on that easement. He said it
would be easier for the family to operate the business if this plan is approved.
Commissioner Deziel said the Commission is looking at a CUP, not zoning. He observed that the
applicant reported that bathroom facilities are inadequate for a retail facility. He noted that
accommodating agriculture is a key point of the City's Comp Plan; and, the City has to anticipate that
agriculture may not take the same forms in the future. He concluded that, therefore, the City has to make
some accommodation for those changes. He stated that he is confident that this plan will happen exactly
as the applicant expressed it.
Commission Pelletier said she would abstain, since it is difficult to differentiate between retail and
growing. She noted that the applicant reported that, if the new greenhouses are relocated elsewhere on
the site, there are the issues of a water source and power lines; and, that she did not necessarily concur
with the City Planner's suggestion that moving the new greenhouse elsewhere on the site would mitigate
the "retailing" issue.
M/S/P, Bunn/Johnson, To recommend approval of the application to amend the Conditional Use Permit
for the addition of two greenhouses at Country Sun Farm with the following Alternative Findings:
1. Although the additional growing function at this facility may also result in additional retail
function, the traffic safety concern is mitigated by the traffic light that is about to be installed at
Highway 36 and Lake Elmo Avenue.
Lake Elmo Planning Commission Minutes of April 26, 2004 4
AMENDED/APPROVED: MAY 10, 2004
2. The planned addition to the facility will be used as a growing space, though it may have a
duplicate retail use.
3. The applicants are a family whose business is deeply rooted in agriculture. They are trying to
pass on an agriculture business from one generation to another, and with the hope to pass it on to
the next generation in the future. Their business is primarily growing and the sale of agricultural
products grown on site.
Commissioner Berg said he is supportive but asked for another condition of a fifty foot structure setback
to the east. He asked the Planner if precedence concerns could be overcome by Finding that the retail
uses is tied to an AG use, or performed only in certain locations.
The Planner said the commission can make that an additional finding, and they can add a condition to the
CUP regarding the east setback.
Commissioner Bunn said she does not support the fifty foot setback suggestion.
VOTE: 5:3:1 (Nay: Van Pelt/Sedro/Sessing), (Abstain: Pelletier).
Commissioner Sessing would like to see 50 feet of setback. Commissioner Sedro said her oppositions are
the setback and to Finding 2 because it was not definitive enough. She felt that the word, "Primarily"
meant 51%, and that percentage was not high enough.
Commissioner Van Pelt said that while he feels the plan is great, he also feels that the retail portion is
inconsistent with AG zoning.
M/S/P, Berg/Sessing, To direct the applicant to engage the City, County and Mn/DOT in discussion to
see about whether a "No U-turn" sign would be a good idea at the intersection of Highway 36 and Lake
Elmo Avenue.
Commissioner Johnson said that said a traffic light may already meet the safety concerns at Highway 36
and Lake Elmo Avenue.
Commissioner Bunn said a U turn at the light with a left turn arrow might even be safer.
Commissioner Berg said that is why Mn/DOT is being consulted. They are the experts.
VOTE: 9:0.
RECESS 8:30 P.M. RECONVENE AT 8:38 P.M.
520 SITE PLAN — ADDITION TO BUILDING —RETAIL CONSTRUCTION
The Planner said the proposal before the commission is to add 4,000 square feet onto the building situated
one block north of city hall, along with parking and proof of parking. He observed that although proof of
parking is in the plan, there is no provision for additional landscape islands should that parking ever be
constructed. The Planner suggested that this plan is a minor addition to the existing facility, and a motion
for approval would be in order. He reported that the applicant advises that the addition will look like the
same as the existing building.
Commissioner Deziel asked about the drainfield location, and if it might be too close to the building. He
asked if it would be adequate, and would the backup drainfield be compromised.
The Planner said he will look into it.
Lake Elmo Planning Commission Minutes of April 26, 2004 5
AMENDED/APPROVED: MAY 10, 2004
M/S/P, Johnson/Sessing, To recommend approval of the addition of 4,000 square feet to the building
located at 11343 39th Street North. VOTE: 9:0.
CITY COUNCIL UPDATE
The Planner said the Council again considered variance proposal for the property on 35th Street, where the
Planning Commission recommended the reduced garage size. He reported that the Council added the
condition that the back of the garage must align with the house, even though it created less setback.
The Planner said the Council asked to set up a Fence Workshop to include the Planning Commission.
Staff will try to do set up the workshop in May, either before or after a Planning Commission Meeting.
He also reported that the Whistling Valley 2"d addition was approved by the Council.
The Planner said the Council had a brief discussion of the Met Council issue. The Planner was instructed
to ask the City Attorney to check with the Met Council attorney to see if there was an alternative proposal
brought forward by a third party, and whether it was a legitimate proposal.
Commissioner Sedro noted that the minutes from the City Council about the Fence Ordinance sounds like
they did not like anything the Commission recommended. The Planner said that most members of the
Council were not supportive of the Planning Commission's Fence Ordinance proposal, but each disagreed
with different aspects of the ordinance. The Planner said the Commission did an excellent job on the
Fence Ordinance, and worked hard on it; and that the amendment is well structured.
ADJOURN 8:50 PM
Respectfully submitted,
Kimberly SchafFel
Recording Secretary
Lake Elmo Planning Commission Minutes of April 26, 2004 6
APPROVED: APRIL 26, 2004
City of Lake Elmo
Planning Commission Meeting Minutes
April 12, 2004
Chairman Helwig called to order the meeting of the Lake Elmo Parks Commission at 7:00 p.m.
Commissioners present: Johnson, Van Pelt, Sessing, Pelletier, Ptacek, Bunn, and Berg. STAFF
PRESENT: Chuck Dillerud, City Planner and Kimberly Schaffel, Recording Secretary.
Pledge of Allegiance
Agenda
M/S/P Berg/Johnson, To accept the Agenda as presented. VOTE: 8:0.
Minutes
M/S/P Ptacek/Sessing, To accept the Minutes of March 29, 2004 as amended. Change 3RD to
last paragraph of page two to read, "...Needs to be in tune with the scale of the neighborhood."
VOTE: 7:0:1 (Bunn: Abstain).
PUBLIC HEARING — WHISTLING VALLEY 2ND ADDITION
The Planner introduced the application for this OP Development Stage Plan, Preliminary Plat
and Conditional Use Permit. He said that OP Projects come to the city in three stages: first is
Concept which addresses the basics of the plan, second stage is this one with much greater detail,
and information is submitted to outside reviewing agencies for comment as well as to the city
engineer and city attorney, and the third and final stage will go directly to the City Council.
The Planner said the site is 45 acres of undeveloped land, and this plat is an extension of another
approved project. This project would be 18 single family lots, and half of buildable land will be
preserved as permanent open space.
The Planner said that at the Concept Stage, the developer responded to all conditions of the
Planning Commission by the time the Concept reached the City Council one week later. The
road was changed to connect to the other adjoining plat. Emergency access was indicated as
going out to the Keats Avenue entrance to the Lake Elmo Park Reserve, and that was rejected by
the county. The length of the trail system now exceeds the road length requirement in the OP
standards. The lot owner at the southeast corner had expressed concern about activities on their
parcel creating a problem to their new neighbors. The developer responded by volunteering a
screening plan with a berm.
The Planner said this Development Stage Plan and the plat meets the Concept Plan requirements.
FIe noted that one proposed lot is 1,300 feet below the a acre minimum lot size, but he said he
believes it can be adjusted. He reported that the staff report did not include many outside agency
comments since some of those agencies did not respond until after the staff report was drafted.
The Planner reported that the City Engineer and Washington County have responded. The
Planner said that the County's response was a bit confusing so he called Joe Lux asking what
was meant. He advised the Commission that the second bullet of the County's letter indicated
the County does not want to have direct access from this plat into the Regional Park. He
observed that the developer relocated the trail access to Keats Avenue in the Development Stage
Plan, but that the County does not like that arrangement either. The County has suggested that
from a traffic perspective, speed is faster at the proposed point of access than farther north
Planning Commission Meeting Minutes of April 12, 2004 1
APPkOVED: APRIL 26, 2004
toward the park.
The Planner suggested that access might be made from the northeast corner of the plat in the
outlot, if access is on a right angle going to Keats, and not into the park. The trail location going
east toward Keats is to be determined.
The Planner pointed out that the street section as proposed is 24 feet from curb to curb, the
maximum allowable, and only 22 feet wide along the preserved open space. He stated that staff
recommends approval of the OP Development Stage/Conditional Use Permit and Preliminary
Plat based on three findings in the staff report:
1. The OP Development Stage Plan is consistent with the Lake Elmo
Comprehensive Plan and the approved OP Concept Plan.
2. The OP Development Stage Plan complies with the documentation requirements
and standards of the OP Ordinance, except as noted.
3. The Preliminary Plat complies with the documentation requirements and
standards of Section 400 of the City Code (Subdivision),
and approval should be subject to two conditions
1. The area of the lot that is currently too small should be increased to a' acre minimum
size.
2. Compliance with recommendations of the City Attorney, City Engineer, Valley Branch
Watershed District, and Washington County (if the city deems those recommendations as
reasonable and proper).
The Planner suggested that the commission may wish to point out that the trail location is to be
specified at a later date.
Commissioner Bunn asked if the county has articulated a trail policy about not having direct
access in the Park Reserve. The Planner answered that the County had recently set Policy in that
regard. The Policy generally calls for only a minimum number of access points to the Regional
Park, and that they are all public trail accesses. The County is awaiting the city's Trails System
Plan to address the preferred points of access to the Park by City trails.
Dave Sorenson, Anderson -Sorenson Homes, Bald Eagle Development
Mr. Sorenson said he tried to work with County Parks about the trail issue. The developer
prefers any solution closer to the Park than going down 10th Street. He would be open to a
system that might have a gate or whatever is required to deter the entry into the park by vehicles.
He said the undersized lot won't be a problem to fix.
Chairman Helwig asked if the wetland on the undersized lot is deep. The developer's engineer
replied that it is a seasonally wet depression.
Bob Close, Landscape Architect
The road extension suggestions by the Planning Commission at the Concept Stage make for
better circulation on the trail for residents.
Commissioner Helwig asked if any of the private trails go to loth Street. Mr. Close said no, they
just go to Goose Lake.
Planning Commission Meeting Minutes of April 12, 2004 2
APF-rtOVED: APRIL 26, 2004
William McCully, Rehbein Company
In response to a comment by the city engineer to the preliminary sewer plan, Mr. McCully
explained that the sanitary sewer is placed where shown because they ran out of depth of cover,
which is why they are cutting the corner of a lot. They will abide by setbacks from a residence
to the sewer line but prefer not to lose the depth.
Commissioner Bunn asked how much depth is lost by maintaining the setback. Mr. McCully
said the resulting sewer line then becomes about five feet deep, and they prefer to have more
depth.
THE CHAIR OPENED THE PUBLIC HEARING AT 7:26 P.M.
Jim Kaufhold
Mr. Kaufhold spoke as a representative for his son, the owner of the lot being surrounded by this
development. He asked if the county would let his son put a road out to 10t1h Street. He asked if
the developer would allow his son road access if they wanted to develop their parcel.
The Planner said that on a 10-acre site, the County would probably allow no more than one point
of access to 10°i Street, and no access to Keats Avenue. The current driveway access is
permitted, and that won't be lost to the owner in the future.
Mr. Kaufhold asked what if his family created two lots in the back. Could he get access across
the outlot? The Planner said that the right-of-way does not extend to the east property line of the
plat so there would be no access.
William McCully said there is common space between the road and the Kaufhold Parcel.
THE CHAIR CLOSED THE PUBLIC HEARING AT 7:31 P.M.
Commissioner Ptacek said that, if the county permits only one point of access, Mr. Kaufhold
might be able to relocate his present access farther west. The Planner said that the closer the
driveway gets to the west property line, the safer the situation would be as to spacing access to
10'h Street. The Planner offered to provide The Kaufhold with the name and number of the
County Engineer to confirm access questions to 10'1' Street.
Commissioner Ptacek said he would be uncomfortable asking the developer to provide right-of-
way in this case.
M/S/P Ptacelc/Van Pelt, To recommend approval of the Open Space Development Stage Plan,
Conditional Use Permit and Preliminary Plat of WHISTLING VALLEY 2m1 ADDITION per
plans staff dated April 5, 2004, based on Findings and Conditions specified, and with the
additional condition that a satisfactory resolution of the trail connection to Keats Avenue be
found. VOTE: 8:0.
The Planner said this item will come before the City Council at its April 20, 2004 meeting.
CITY COUNCIL UPDATE
The Planner said the Eisele Variance request came before the council. They asked the applicant
Planning Commission Meeting Minutes of April 12, 2004 3
APPROVED: APRIL 26, 2004
to reduce the setback variance, and the property owner will redraw it. The request results in only
slight modifications and probably will be approved.
The Planner said that Mulligan Masters site plan amendment was approved unanimously.
The Planner said the City Council extended the Old Village Moratorium another 60 days.
Wastewater, Water Supply, and Traffic Studies have now been received, with the latter two
studies arriving last Tuesday. The city is still waiting for the Surface Water Study. The Council
wanted the time to ponder the results of the Surface Water Study and the Stormwater Study. He
noted that the new city administrator will need some time to look at the reports as well.
The Planner reported that the Commission's Fence Ordinance recommendation was brought to
the Council. The Council has scheduled a workshop to discuss fencing, and staff will notify the
commissioners of the date. This will be the Council's workshop but the Council wants the
Planning Commission there to participate.
Commissioner Bunn said the commission adopted a permitting ordinance for fences. She
suggested that the fee structure established should be in relation to the fence being built.
The Planner responded that one approach the staff is looking at is to use the fee structure in the
Building Code since it is a function of project value — the same as project scale.
Commissioner Bunn asked when the decision was made not to hire an assistant planner. She
said that whether or not we hired an administrator, she understood that the City was still planning
to hire an assistant planner.
The Planner said it would not be necessary to have an assistant planner if the City has a fully
functioning City Administrator.
7:50 pm adjourned.
Respectfully submitted,
Kimberly Schaffel
Recording Secretary
Planning Commission Meeting Minutes of April 12, 2004 4