NOTICE OF MEETING
The City of Lake Elmo
Planning Commission will conduct a meeting on
Monday, September 8, 2008, at 7:00 p.m.
AGENDA
1. Pledge of Allegiance
2. Approve Agenda
3. Approve Minutes
a. June 9, 2008 (to be mailed out in advance of meeting)
b. August 11, 2008
4. Public Hearings:
a.CONDITIONAL USE PERMIT: Consideration of an application to permit a
day spa at 8925 Highway 5; LB zoning; PID 16-029-21-41-0025.
b.VARIANCE: Consideration of an application to allow construction of a
detached garage 5 feet from the front lot line (30 foot required setback) at
11002 Upper 33`d Street North; R-1 zoning; PID: 13-029-21-32-0054.
5. Comprehensive Plan
a. Request for an extension of the deadline for completion of Comprehensive
Plan Elements
6. City Council Updates
a. August 19
i. Impervious Surface Ordinance in OP developments
ii. Torre Pines 2nd Addition Minor Subdivision
iii. Moving Permit for Accessory Building at 4150 Irish Court North
b. September 2 - Grading Permits for Valley Branch Watershed District
7. Adjourn
406
DRAFT
City of Lake Elmo
Planning Commission Meeting
Minutes of September 08, 2008
Chairman Ptacek called to order the meeting of the Lake Elmo Planning Commission at
7:00 p.m. COMMISSIONERS PRESENT: Anderson, Deziel, Helwig, Ptacek, Pelletier,
and Van Zandt. STAFF PRESENT: Planning Director Klatt and Planner Matzek.
Agenda
M/S/P, Helwig/Van Zandt, to approve the agenda as presented. Vote: 6:0.
Minutes —June 9, 2008
M/S/P, Helwig/Van Zandt, to approve the minutes as presented. Vote: 6:0.
August 11, 2008
M/S/P, Deziel/Pelletier, to approve the minutes as presented. Vote: 4:0.
Abstained: Anderson, Helwig
Public Hearing: Conditional Use Permit (CUP); 8925 Highway 5
Planning Director Klatt summarized the conditional use permit application for Belle
Amie Spa, a beauty salon, which would be located at 8925 Highway 5. The property is
zoned Limited Business and located in the Prairie Ridge Office Park where there is
adequate parking available. The use will take up a little over half of the building — 1,540
square feet of a vacant 2,500 square foot building. He is recommending approval of the
application because it meets the city code requirements for a CUP.
THE CHAIRMAN OPENED THE PUBLIC HEARING AT 7:14 P.M.
No one spoke.
THE CHAIRMAN CLOSED THE PUBLIC HEARING AT 7:14 P.M.
M/S/P, Van Zandt/Pelletier, move to recommend approval. Vote: 5:1.
Commissioner Helwig stated that the noxious weeds at the site need to be taken care of.
Public Hearing: Variance; 11002 Upper 33rd Street
Planner Matzek introduced the variance application requesting approval of a 25 foot
variance from the 30 foot front yard setback requirement to allow a one car detached
garage on the property 5 feet from the front property line. She said the short driveway
would not allow for a car to wait off the roadway for a garage door to open if the
roadway were ever widened. The property must continue to meet the impervious surface
requirements.
Commissioner DezieI asked why the garage could not be attached to the home. He asked
if the road would be widened and extended to the west in the future.
Lake Elmo Planning Commission Minutes; 9-08-08 1
DRAFT
Planning Director Klatt stated that it is possible that the road would be extended with
future development to the west, but that it is far out in the future and may not occur. The
proposed structure would continue to be outside the right-of-way.
Jill Martin, applicant
Ms. Martin stated that she had originally wanted to put a car port on the home, but was
told she could not. She said that if she moved the garage back any further it would block
a window and would not meet the side yard setback.
THE CHAIRMAN OPENED THE PUBLIC HEARING AT 7:31 P.M.
No one spoke.
THE CHAIRMAN CLOSED THE PUBLIC HEARING AT 7:31 P.M.
MIS/P, Helwig/Van Zandt, move to recommend approval as recommend. Vote: 5:1.
Commissioner Deziel voted against the motion because of his concern for the future
implications regarding Upper 33"d Street.
Comprehensive Plan Request for Extension
Planning Director Klatt asked the commission to review a request to the Metropolitan
Council for an extension for the City of Lake Elmo Comprehensive Plan Update. The
Local Water Plan, Local Surface Water Plan and Local Transportation Plan will be
updated. Lake Elmo will be requesting a submission extension to December 2010.
Chairman Ptacek asked if there would be any penalties for submitting the plan later than
the deadline.
Planning Director Klatt stated that while the Metropolitan Council could pursue civil
penalties, he thought the city had a good case given the progress and the upfront and open
request.
City Council Updates
Planning Director Klatt said the council had amended and approved an impervious
surface ordinance.
Adjourned at 7:58 p.m.
Respectfully submitted,
Kelli Matzek
Planner
Lake Elmo Planning Commission Minutes; 9-08-08 2
DRAFT
City of Lake Elmo
Planning Commission Meeting
Minutes of September 08, 2008
Chairman Ptacek called to order the meeting of the Lake Elmo Planning Commission at
7:00 p.m. COMMISSIONERS PRESENT: Anderson, Deziel, Helwig, Ptacek, Pelletier,
and Van Zandt. STAFF PRESENT: Planning Director Klatt and Planner Matzek.
Agenda
M/S/P, Heiwig/Van Zandt, to approve the agenda as presented. Vote: 6:0.
Minutes —June 9, 2008
M/S/P, Helwig/Van Zandt, to approve the minutes as presented. Vote: 6:0.
Augus111, 2008
M/S/P, Deziel/Pelletier, to approve the minutes as presented. Vote: 4:0.
Abstained: Anderson, Helwig
Public Hearing: Conditional Use Permit (CUP); 8925 Highway 5
Planning Director Klatt summarized the conditional use permit application for Belle
Arnie Spa, a beauty salon, which would be located at 8925 Highway 5. The property is
zoned Limited Business and located in the Prairie Ridge Office Park where there is
adequate parlcing available. The use will take up a little over half of the building — 1,540
square feet of a vacant 2,500 square foot building. He is recommending approval of the
application because it meets the city code requirements for a CUP.
THE CHAIRMAN OPENED TT-IE PUBLIC HEARING AT 7:14 P.M.
No one spoke.
THE CHAIRMAN CLOSED THE PUBLIC HEARING AT 7:14 P.M.
M/S/P, Van Zandt/Pelletier, move to recommend approval. Vote: 5:1.
Commissioner Helwig stated that the noxious weeds at the site need to be taken care of.
Public Hearing: Variance; 11002 Upper 33`d Street
Planner Matzek introduced the variance application requesting approval of a 25 foot
variance from the 30 foot front yard setback requirement to allow a one car detached
garage on the property 5 feet from the front property line. She said the short driveway
would not allow for a car to wait off the roadway for a garage door to open if the
roadway were ever widened. The property must continue to meet the impervious surface
requirements.
Commissioner Deziel asked why the garage could not be attached to the home.
Lake Elmo Planning Comrnission Minutes; 9-08-08 1
DRAFT
Jill Martin, applicant
Ms. Martin stated that she had originally wanted to putt a car port on the home, but was
told she could not. She said that if she moved the garage back any further it would block
a window and would not meet the side yard setback.
THE CHAIRMAN OPENED THE PUBLIC HEARING AT 7:31 P.M.
No one spoke.
THE CHAIRMAN CLOSED THE PUBLIC HEARING AT 7:31 P.M.
MIS/P, HelwiglVan Zandt, move to recommend approval as recommend. Vote: 5:1.
Commissioner Deziel voted against the motion because of his concern for the future
implications regarding Upper 33Td Street.
Comprehensive Plan Request for Extension
Planning Director IClatt asked the commission to review a request to the Metropolitan
Council for an extension for the City of Lake Elmo Comprehensive Plan Update. The
Local Water Plan, Local Surface Water Plan and Local Transportation Plan will be
updated. Lake Elmo will be requesting a submission extension to December 2010.
Chaimran Ptacek asked if there would be any penalties for submitting the plan later than
the deadline.
Planning Director Klatt stated that while the Metropolitan Council could pursue civil
penalties, he thought the city had a good ease given the progress and the upfront and open
request.
City Council Updates
Planning Director Klatt said the council had amended and approved an impervious
Adjourned at 7:58 p.m.
Respectfully submitted,
Kelli Matzek
Planner
Lake Elmo Planning Commission Minutes; 9-08-08 2
DRAFT
City of Lake Elmo
Planning Commission Meeting
Minutes of August 11, 2008
Chairman Ptacek called to order the meeting of the Lake Elmo Planning Commission at
7:02 p.m. COMMISSIONERS PRESENT: Deziel (7:05), Fliflet, Pearson, Pelletier,
Ptacek, Roth, and Van Zandt. STAFF PRESENT: Planning Director Klatt and Planner
Matzek OTHERS PRESENT: Angie Hong, Washington Conservation District; John
Bilotta, NEMO; John Hanson, Valley Branch Watershed District
Agenda
Chairman Ptacek added 3B "Introduction of new commissioner"
M/S/P, Roth/Van Zandt, to approve the agenda as amended. Vote: 6:0.
Minutes — July 14, 2008
Commissioner Fliflet said she would like her comment on page two expanded to include
why she does not agree with the proposed accessory building setbacks in the Residential
Estates District. She does not believe it is consistent with the large lot development
district.
M/S/P, Roth/Fliflet, to approve the minutes as amended. Vote: 5:0. Abstained: Pearson
Commissioner Deziel arrived at 7:05 p.m.
Introduction of New Commissioner
Commissioner Mike Pearson introduced himself to the commission.
Public Hearing: Moving Permit for Accessory Building at 4150 Irish Court North
Planner Matzek stated that the city received an application for a moving permit to allow
an accessory building on the property at 4150 Irish Court North. She explained the
application, process, and recommended approval of the application with the conditions
that a building permit was needed and a security was necessary before the building could
be moved to the site.
THE CHAIRMAN OPENED THE PUBLIC HEARING AT 7:15 P.M.
No one spoke.
THE CHAIRMAN CLOSED THE PUBLIC HEARING AT 7:15 P.M.
Commissioner Deziel identified that the building should not be used for cars as they
might compact the septic system.
The applicant, Karen Lerol said the building would be no where near the drainfield. She
also stated their intentions to remove the existing shed.
Lake Elmo Planning Commission Minutes; 8-11-08 1
DRAFT
M/S/P, Pelletier/Roth, move to recommend approval with conditions outlined in the staff
report. Vote:7:0
Public Hearing: Front Yard Variance at 11002 Upper 33rd Street
Planner Matzek identified that a discrepancy was found in the submitted site plan which
is being corrected.
THE CHAIRMAN OPENED THE PUBLIC HEARING AT 7:18 P.M.
No one spoke.
THE CHAIRMAN CLOSED THE PUBLIC HEARING AT 7:18 P.M.
M/S/P, Deziel/Van Zandt, move to table the variance application. Vote: 7:0.
Public Hearing: Zoning Code Text Amendment
Planning Director Klatt identified that the commission had previously agreed to revisit
the impervious surface code requirement in the Open Space Preservation (OP)
developments. He said that staff has found that most built lots in OP developments are
either very close to the maximum currently allowed or over. After reviewing the
impervious surface in a number of existing developments, staff is recommending an
increase to allow twenty percent with an additional five percent if using engineering
approved mitigation system such as pavers.
Commissioner Deziel stated that there were calculations for each of the OP developments
to size the storm water ponding and those numbers should be reviewed when revisiting
the ordinance.
Planning Director Klatt said that he spoke with the engineer who was unable to look up
each one, but that maybe John Hanson with the Valley Branch Watershed District could
address that comment.
John Bilotta, Nonpoint Education for Municipal Officials (NEMO) Regional Coordinator
Mr. Bilotta gave a presentation on linking land use decisions to water quality and
identified multiple tools that can be used such as rain gardens, infiltration and filtration
processes.
Chairman Ptacek asked if the proposed ordinance would allow for more advanced tools
and leading edge research.
Planning Director Klatt said that the ordinance requires engineering approval for the
additional five percent of impervious surface, which allows some additional flexibility
than what the current code allows.
THE CHAIRMAN OPENED THE PUBLIC HEARING AT 8:32 P.M.
Lake Elmo Planning Commission Minutes; 8-11-08 2
DRAFT
David Reed, 5712 Lily Ave N
Mr. Reed said he is a resident and a builder in the Sanctuary development. He believes
the original ordinance was intended to be an impervious surface of ten percent over the
entire development. He said that pavers are a relatively new system and are costly. He
would encourage the commission to consider the entire development and raise the
hardcover allowed on each lot.
Steve Meads, 2928 Jonquil Trail N
Mr. Meads said he is a new resident and has been living without a driveway for four
weeks. He stated that all the existing homes in the Farms of Lake Elmo subdivision
would not meet the existing requirement. He said allowing rain gardens would help as
the sandy soils are excellent for drainage. He would encourage the city to look at a
development at the front end and look at the gross overall development and not on an
individual lot.
Bob McAdams, 8950 Lake Jane Trail
Mr. McAdams said that there was a change in the city engineer. He said the new
engineer reinterpreted the code incorrectly. He said the prior interpretation was that the
ten percent impervious surface allowed was for the entire development.
Scott Kennedy, 10978 57`8 Street N
Mr. Kennedy said he is also a new homeowner in the city who was surprised to find out
that his driveway and patio were over the impervious coverage requirement. He
suggested the code be increased to allow twenty to twenty five percent as many
developments have minimum sizes for homes.
THE CHAIRMAN CLOSED THE PUBLIC HEARING AT 8:44 P.M.
Commissioner Deziel said that in the 1980's, a watershed was developed upstream of
Lake Jane which caused immense flooding. He suggested looking at what each
development was designed to handle for water runoff.
Planning Director Klatt said that the city is required to follow the National Pollutant
Discharge Elimination System (NPDES) permit requirements and more resources are
available now than ten years ago. He said a stormwater ordinance will be in front of the
commission later this year.
Mr. John Hanson with the Valley Branch Watershed District (VBWD) said that a
developer's engineer puts together calculations based on assumptions such as house size
which is then reviewed by the VBWD.
M/S/P, Roth/Fliflet, motion to recommend approval of the proposed ordinance. Vote:
5:1; Pearson abstained.
Lake Elmo Planning Cormnission Minutes; 8-11-08 3
DRAFT
Commissioner Deziel stated that he voted against the ordinance because existing
developments may need individual requirements. He is not against people having
anything as long as it is not hurting the environment.
Informational Items
Planner Matzek said an executive summary was provided for a study that was conducted
entitled: "A Look at Community Capacity to Conserve Open Space in the Twin Cities
Area."
City Council Updates
Planning Director Klatt said that the Torre Pines 2"d Addition has not yet gone to
Council.
Adjourned at 9:11 p.m.
Respectfully submitted,
Kelli Matzek
Planner
Lake Elmo Planning Commission Minutes; 8-11-08 4
Planning Commission
Date: 9/8/08
Public hearing
Item: 4a
ITEM: Hold a public hearing to consider an application for a Conditional Use
Permit to establish a Day Spa at 8925 Highway 5.
REQUESTED BY: FLF Properties, Applicant
SUBMITTED BY: Kyle Klatt, Director of Planning
REVIEWED BY: Susan Hoyt, City Administrator
Kelli Matzek, City Planner
SUMMARY AND ACTION REQUESTED:
The Lake Elmo Planning Commission is being asked to consider a request from FLF Properties
to establish a clay spa at 8925 Highway 5, which is located within the Prairie Ridge Office Park
complex at the intersection of Highway 5 and Stillwater Boulevard North. The use would occupy
1,540 square feet of the 2,500 square foot building at this address and would make use of the
current parking that has been provided for the office park. The remaining area of the building is
vacant as is the adjacent building. Other uses in the park are offices and low -impact services
businesses.
The proposed site is located in a LB — Limited Business District, a district that is intended for low
impact uses in areas without sanitary sewer service. Day Spas are permitted as a conditional
use, and the City Council must approve such a use if the proposed activity is able to meet the
criteria for conditional uses as specified in the Zoning Ordinance. The use does meet the C.U.P.
standards in the code and approval is therefore recommended.
ADDITIONAL INFORMATION:
• The applicant has provided architectural plans for the proposed use and a description of the
services presently offered by the business at its present location. This information supports
the designation of the use as a "Day Spa" and the findings documented in the attached
report.
STAFF RECOMMENDATION:
Staff recommends that the Planning Commission recommend approval of the applicant's request
for a Conditional Use Permit to establish a day spa at 8925 Highway 5 because it meets all the
criteria for a conditional use permit.
MOTION FOR CONSIDERATION:
I move we recommend that the City Council approve the requested conditional use permit for a
day spa at 8925 Highway 5 based on the findings provided by staff.
ORDER OF BUSINESS:
- Introduction Kyle Klatt, Planning Director
Report by staff Kyle Klatt, Planning Director
Questions from the Commission Chair & Commission Members
Applicant Comments Chair facilitates
- Questions of the Applicant Chair & Commission Members
Open the Public Hearing Chair
Close the Public Hearing Chair
- Call for a motion Chair Facilitates
- Discussion of Commission on the motion Chair Facilitates
Action by the Planning Commission Chair & Commission Members
ATTACHMENTS:
1. Area map showing the location of the subject property
2. Detailed staff report on the request
3. Prairie Ridge Office Park site plan and plat
4. Architectural diagrams for building and proposed use
5. List of services provided by Belle Amie Spa
8925 Highway 5
City of Lake Elmo Planning Department
Conditional Use Permit Request
To: Planning Commission
From: Kyle Klatt, Planning Director
Kelli Matzek, City Planner
Meeting Date: 9-8-08
Applicant: FLF Properties and Belle Amie Spa
Owner: FLF Properties
Location: 8925 Highway 5
Zoning: Limited Business (LB)
Introductory Information
Requested
Conditional
Use Permit:
The applicant is seeking to allow a day spa establishment to be located at 8925
Highway 5. The business would be located within an existing building that is part of
the Prairie Ridge Office Park on the western portion of this site.
Property The Prairie Ridge Office Park is currently zoned Limited Business, where beauty
Information: salons are listed as a conditional use and day spas are an accessory use to a beauty
salon. The subdivision for the office park was approved in early 2004, and
subsequently, all of the buildings planned have been constructed. The site was
approved as a planned unit development; however, there are no specific requirements
on file pertaining to the future uses within the overall office park, which is regulated
by the current LB zoning designation.
Access into the office park is provided via a private road that connects between the
westbound lane of State Highway 5 and Stillwater Boulevard North (County Rd. 6).
Parking has been provided in accordance with the previous PUD review, therefore, no
additional stalls are provided for the proposed day spa. The proposed use is consistent
with the overall businesses that are presently located within the park and the LB
Zoning of the property.
Applicable Section 154.018 Administration.
Codes: Subd 4. Conditional Use Permits. Outlines the general requirements for all
conditionally permitted uses in Lake Elmo.
Section 11.02 Definitions
DAY SPA. A safe, clean commercial establishment, which employs professional
licensed therapists whose services include massage and body or facial treatments.
CUP Request: EL I' Properties and Hell', _ due Spa
Planning Commission Report: 9-8-08
Treatments may include body packs and wraps, exfoliation, cellulite and heat
treatments, electrolysis, body toning, waxing, aromatherapy, cleansing facials,
medical facials, nonsurgical face lifts, electrical toning, and electrolysis. Services
may also include Hydrotherapy and steam and sauna facilities, nutrition and
weight management. No services or facilities may be offered or constructed that
would include customer over night stay.
Section 154.057 LB — Limited Business District
Contains the standards and uses permitted in the LB District with the following
purpose statement: "The purpose of the Limited Business District is to establish a
comprehensive planned framework for development where municipal sanitary
sewer does not exist. The city has determined that it is in the best interest of the
city and the region to responsibly manage growth in this district. It is the intent of
this district to promote a high quality of business design and development that
produces a positive visual image and minimizes adverse impacts from traffic
congestion, noise, odor, glare, and similar problems."
Findings & General Site Overview
Site Data: Overall Business Park Size: 16.98 Acres
Size of Lot 13: 3,263 square feet
Buildings: Seven (7) building with a total of approximately 35,000 square feet of area
Existing Use: Office/Limited Services/Vacant
Existing Zoning: LB — Limited Business
Property Identification Number (PID): 16-029-21-41-0025
Application Review:
Existing None of the conditions that were attached to the approval of the PUD for Prairie Ridge
Conditions: Office park are applicable to the future tenants within the office park buildings. The
site has been developed in accordance with the approved plans, including the
provision of any required parking for the future tenants, the installation of storm water
management improvements, and other site work. The City does still have an active
developer's agreement in place for the Office Park development, and a few
outstanding close-out items need to be completed before all of the improvements can
be accepted by the City.
CUP Review: The plans that have been submitted by the applicant include an overall site plan for the
business park, a building schematic diagram, the Prairie Ridge Office Park Plat, and
plans for the portion of the building at 8925 Highway 5 that will be used for the day
spa. The application materials also include a listing of the current services offered by
the business from its present location along Lake Elmo Avenue. Based on the
ClL)otuntctns and Set/hurvVwl/L/,,wzcMLo( al Settings ITemporarpInternet la(esICoevern OudookJHQTHLL i1ie;--Be/le
singe S'pa PZ 9-h-OS.doc
Page 2
CUP Request; F[J' Propetiks and Belk _ mac Spa
Planning Commission Regan; 9-8-08
Conditional
Use Perinit
Criteria:
information submitted, it appears that the proposed use is consistent with the activities
defined by the City Code for a Day Spa.
The City's process for the review of a Conditional Use specifies that before a C.U.P.
may be issued, the City must consider certain findings as they pertain to the proposed
use. For these types of applications, the burden is on the City to show why the use
should not be permitted due to impacts that cannot be controlled by reasonable
conditions.
Impacts the City must review are as follows:
1. Effects on the health, safety, morals, convenience, or general welfare of
surrounding lands.
2. Traffic & Parking conditions.
3. Effects on utility and school capacities.
4. Effect on property values of surrounding lands.
5. Effect of the proposed use on the Comprehensive Plan.
1. Effects on the health, safety, morals, convenience, or general welfare of
surrounding lands.
The proposed Day Spa is compatible with the other uses within the Prairie Ridge
Office Park, which include offices and low -impact service businesses. There have
been no comments received to date that indicate any concern from neighboring
property owners regarding the proposed use. Given the limited types of businesses
that can be conducted in the LB District, the proposed Day Sap will not create any
anticipated impacts that would be detrimental to the health, safety, morals,
convenience, or general welfare of surrounding lands.
Therefore, staff finds this criteria is met.
2. Traffic & Parking conditions.
The City reviewed potential traffic issues as part of the PUD review for the Office
Park, and determined the appropriate number of parking stalls for the entire site at this
time as well. The parking needs for the Day Spa are consistent with the expected
demand for parking throughout the project area.
Staff fmds this criteria is met.
3. Effects on utility and school capacities.
A day spa use will have minimal impacts on the existing utilities at the site. The use
of the utilities would be consistent with the expectations for the overall planned
development area. The utilities are previously been installed on the site and would not
be greatly impacted by this use.
The number of school age children would not be impacted by this use. There would
be no impact on the school capacities, therefore staff finds this criteria is met.
Cr;Pocuments ami SettingOkelli.uurrzel
.9rrtrc Syrr_ t'Z9-8-R&.clot
S t rots Terrporat3 /uletaxa Fi/c's Coruent Otalon/JHBJ///!A'Rep--Behr,
CUP Request; 1
Pletnain Corny
l' Properties and Belli.. ,oie Spa
rsiun Report: 9-8-08
Conditional
Use Permit
Conclusions:
Resident
Concerns:
Additional
Information:
Conclusion:
Commission
Options:
4. Effect on property values of surrounding lands.
Given the small-scale service and the primary function of the business as a salon, the
surrounding land values would not be depreciated due to this use. Therefore, staff
would find this criteria is met.
5. Effect of the proposed use on the Comprehensive Plan.
The Prairie Ridge Office Park area is guided for limited business uses in the
Comprehensive Plan and as noted above, the proposed use is listed as a Conditional
Use in this district. The addition of a day spa to the business park is consistent with
the future land use plan for the area.
Staff finds this criteria is met.
Based on the above analysis of the review criteria in City Code, staff is recommending
approval of the conditional use permit request to allow a day spa at 8925 Highway 5
based on the following:
1. The use would not negatively affect the health, safety, morals, convenience, or
general welfare of surrounding lands.
2. It would not affect traffic or parking conditions given the use has existed on the site
for over one year and staff is not aware of any complaints.
3. The use would have no effect on utility or school capacities.
4. The proposed use would have no effect on property values of surrounding lands.
5. The use would be consistent with the Comprehensive Plan.
Staff is not aware of any concerns surrounding the requested conditional use permit.
The other property owners within Prairie Ridge Office Park were provided with notice
of the public hearing in accordance with City Code.
Neither the watershed district nor the DNR provided comment in opposition to the
proposed conditional use permit.
The applicants are seeking approval of the following conditional use permit
application:
To allow a day spa at 8925 Highway 5.
The Planning Commission has the following options:
A) Recommend approval of the conditional use permit request;
B) Recommend denial of the conditional use permit request.
C:1)ocun cats and Settings+kelli.autr_eLUoc al Setif rigs .re wry 6ttt:rnet 1-rles'•Conteut. Chrtlnok+ TIIB IY1IL;t Rep--BaUe
Antic Spa P2 9-8-08.doc
CUT' Request; F'1.F T'rope,'tics tnu(1f{•(1% - .,lie Spn
Planning Cnnmris.ckm
The 60-day review period for this application expires on 10-12-08, but can be
extended an additional 60 days if more time is needed.
Staff Rec: Staff is recommending approval of the conditional use permit request to allow a day
spa at 8925 Highway 5 based on the following:
1. The use would not negatively affect the health, safety, morals, convenience, or
general welfare of surrounding lands.
2. It would not affect traffic or parking conditions given the use has existed on the site
for one year and no complaints were received.
3. The use would have little or no effect on utility or school capacities.
4. The proposed use would have no effect on property values of surrounding lands.
5. The use would be consistent with the Comprehensive Plan.
Denial To deny the request, you may use the following motion as a guide:
Motion
Template: I move we recommend that Council deny the requested conditional use permit
for a day spa at 8925 Highway 5 based on the following findings... (please site
reasons for the recommendation)
Approval To approve the request, you may use the following motion as a guide:
Motion
Template: I move we recommend that the City Council approve the requested conditional
use permit for a day spa at 8925 Highway 5 based on the following findings...(use
staff's findings provided above or cite your own)
cc: FLF Properties, 8921 Highway 5
t '.'.Uncumants and Seu r
.4rntr S},n PZ tt-8--08.ddo1..
tl Scings.12
irt,a?ter F'tics'Content. Oxtloo4 •?12t7 HtLX.Rrp--&elte
Fa,ge S
0 2 signs
Prairie Ridge Office ?ask, local.
!r,
�ySCI.�
.--Yen WC or 1/4 dECl/, d' nip VII in
56
517LLA`ATNS RL{D NOR78—COUNTY NP.S-
-z,
/ 1
11 /
/
h
/ 1
/
/
/
JAAWCA APFNVF
8
0'
1
110.212.
10x13
109
TRFMMETT
BOOM 30•X "
0'
STEMN
ROOM
EXISTING
WALL
i
4 7AT
HALL
V-7 IIS
13xI5
PF.OICUREMANICURE
— SnT
SE NN
TR ANSP :NT
TEMPERS!)
GLASS
96530"
I '1"
I SILT
CAH
'IY ANS-ClION�
l
S'-6•
10x13
P
30X]S"
TRFATMEVr
ROOM
DEMISING
WALL AY
0nw's
01r
0 e
belle amie spa
Manicure
$27,00
belle amie spa manicure
manicure plus hand and
arm exfoliation & massage
belle amie spa pedicure
pedicure plus font and lower leg
exfoiialiarr & massage 60.00
Polish changes
all polish changes include clipping,
filing and polish application
Hands
Feet
Gel nails
Classic
French
35.00
20.00
25.00
45•0o and up
50.0o and up
Initial gel overlay
Classic
French
55.00
6o.00
Nail repair 5.0o and up
Nail art 5.00 and up
EST 748-3777
3515 Lake Elmo Aye N., Upper Suite 1 Lake Elmo, MN 155042
hours: Tue:v-51 Wed: 11-81 Fn: to-5 'Sat: by appt
belle amie spa
All facials include the finest natural marine and
botanical ingredients combined with the latest
technology. We will customize your facial to
your specific skin type.
belle amie 6o min ..$70.00
Freeze-dried collagen 75 min... 85.00
Oxy-Vita! 75 min.. Lagoa
Vitamin C 75 nlin.. 100.00
Sea and "C" 75 Hain.. 125.00
Plontomer (algae) 75 min... 85.00
Rosacea 6o min... 85.00
Lightening 75 min.. .00.00
Myoxv-Cavoir 75 min.. 125.00
Acne or problematic .. 6o min... 70.0o
Essential 45 min... 60.00
S All gel peel treatments are customized to your
skin type.
Peel
45 rain
85.00 - 100.00
(trial ere/Eh/beta&
Booster treatment 15.00
Eye -renewal treatment 20.00
15.00
Caviar hand or foot 25.a0
Lymphatic massage 35.00
Stress -relieving foot treatment 20.00
Eye stress relief
Tension -releasing massage for people on the
ga. Also a great introduction to massage.
15 min $20.00
zo ruin 25.00
e
®® belle amie spa .
GfL�G » /rtius
41;
Soothes sore muscles while relaxing the
whole body. Each massage is customized to
meet individual needs.
3o min 45.00
6o min 75.ao
go min 100.00
siovte- /t ans��e'
Ease tension and relieve stress with this
soothing massage combined with deep heat
therapy.
75 min 105.00
With deep tissue. ... - 13a.00
Message Vnce Includes ma
e ( r` '1
belle amie spa
Eyebrow shaping $17.00
Lip 12.00
Chin 12.00
Underarms 20.00
Arms 30.00
Bikini 25.00
Lower legs 30.00
Full leg 55.00
Full leg/bikini 75.00
Back 45.00
Brows
Eyelashes
Application
Bridal
includes comptirnentoty lipstick , , , . 50.00
20.00
20 00
6YY- 748-3777
30.00
3515 Lake Elmo Ave. N., Upper Suite' Lake Elmo, MN 1 55042
hours: Iue: u'S I Wed: 11-81Prb to-5 Sat: by appt.
Planning Commission
Date: 9/8/08
Public hearing
Item: 4b
ITEM: Hold a public hearing to consider a 25 foot front yard setback variance to
allow the construction of a detached garage five feet from the front
property line where 30 feet is required at 11002 Upper 33'd Street North.
REQUESTED BY: Jill Martin, Applicant
SUBMITTED BY: Kelli Matzek, City Planner
REVIEWED BY: Susan Hoyt, City Administrator
SUMMARY AND ACTION REQUESTED:
The Lake Elmo Planning Commission is being asked to hold a public hearing and consider a
request from resident Jill Martin to allow construction of a one car, detached garage on her
property at 11002 Upper 33`" Street North to serve the existing residential home. The proposed
garage would be located five feet from the front property line where thirty feet is required and
would therefore need a twenty-five foot variance. The small residential lot (0.14 acres) currently
does not have any covered parking and a conforming location does not exist for a detached
garage. The addition of a garage to the property is a reasonable request as accessory to the
existing residential home.
The addition of the proposed garage and driveway would exceed the maximum impervious
surface allowed on the site, which is 25 percent of the lot size. Therefore, staff is recommending
as a condition of approval that a portion of the existing hardcover be removed to retain
compliance with this requirement while maintaining the required three off-street parking spaces
required by code.
ADDITIONAL INFORMATION:
• The property is located in the downtown of the Village Area and is adjacent to a property
guided for the development of residential homes when sewer becomes available. At the time
that property develops, there is the potential that Upper 33`I Street (currently a dead end
road) may be extended and expanded, thereby decreasing the distance between the edge of
the roadway in front of Ms. Martin's property and the proposed garage. This would result in
the inability for a vehicle pulling into the garage to be entirely off the street and out of traffic
while waiting for a garage door to be opened.
RECOMMENDATION:
Staff is recommending approval of the variance as it meets the variance criteria with the following
findings:
1) The addition of a single car garage on the property is a reasonable request as accessory
to the existing home.
2) The size and shape of the property as well as the location of the existing home, septic
system, and setback requirements prevent a conforming location for a detached garage
on the lot.
3) The property was platted in its current configuration in 1848, pre -dating the existing city
code requirements.
And with the following conditions:
1) Prior to the city issuing a building permit, a portion of the existing hardcover must be
removed to retain the property's conformance with the impervious surface requirement of
twenty-five percent of the lot.
2) Three off-street parking spaces must be accommodated on the lot.
MOTION FOR CONSIDERATION:
I move we recommend that the City Council approve the requested 25 foot variance from the
required 30 foot front yard setback for a detached garage at 11002 Upper 33rd Street based on
the findings provided by staff and with the conditions identified in the staff report.
ORDER OF BUSINESS:
- Introduction Kelli Matzek, City Planner
Report by staff Kelli Matzek, City Planner
Questions from the Commission Chair & Commission Members
Applicant Comments Chair facilitates
Questions of the Applicant Chair & Commission Members
Open the Public Hearing Chair
Close the Public Hearing Chair
- Call for a motion Chair Facilitates
- Discussion of Commission on the motion Chair Facilitates
Action by the Planning Commission Chair & Commission Members
ATTACHMENTS:
1. Area map showing the location of the subject property
2. Detailed staff report on the request
3. Site Plan
4. Aerial image of site.
11002 Upper 33rd Street N
City of Lake Elmo Planning Department
Variance Review
To: Planning Commission
From: Kelli Matzek, Planner
Meeting Date: 9/08/08
Applicant: Jill Martin
Owner: Jill Martin
Location: 11002 Upper 33rd St N
Zoning: Rl — Single Family Residential
Introductory Information
Request Jill Martin, 11002 Upper 33rd Street north, is requesting that the City consider a 25
foot variance from the required 30 foot front yard setback to allow the construction of
a detached garage on the property. The proposed single car garage would be located
five feet from the front property line.
Site Data: Property Identification No. Area Use
13-029-21-32-0054 6,137 square feet Residential Dwelling
(0.14 Acres)
Applicable
Codes:
The applicant's property is zoned R-1 Single Family Residential. There is an existing
single family home located in the center of the property. The septic tanks are located
in the rear yard of the lot.
Section 154.041 R-1 One -Family Residential Zoning District
Subd. C. Minimum District Requirements
The R-1 Zoning District has a building setback of 30 feet from the front property
line, 10 feet from the side (interior) property lines, and 40 feet from the rear
property line.
The maximum impervious surface coverage is 25 percent of the property.
Section 154.092 Accessory Buildings and Structures
(I) No detached garages or other accessory buildings in residential districts shall
{'nriunc<; ddnrrin: 11002 Upper 33Ht St
Planning Commission Report: 9-08-08
be located nearer the front lot line than the principal building on that lot, except in
AG, RR, and R-1 Districts where detached garages may be permitted nearer the
front lot line than the principal building by resolution of the City Council, except
in planned unit developments or duster [sic] developments.
Applicable ACCESSORY BUILDING. A subordinate building, or a portion of the main building,
Code which is located on the same lot as the main building and the purpose of which is
Definitions: clearly incidental to that of the principal building.
ACCESSORY STRUCTURE. A use or structure on the same lot with, and of a
nature customarily incidental and subordinate to, the principal use or structure.
BUILDING LINE. A line parallel to a lot line or the ordinary high water level at the
required setback beyond which a structure may not extend.
BUILDING SETBACK LINE. A line within a lot parallel to a public right-of-way
line, a side or rear lot line, a bluff line, or a high water mark or line, behind which
buildings or structures must be placed.
BUILDING SETBACK. The minimum horizontal distance between 1 building and
the lot line.
BUILDING. Any structure, either temporary or permanent, having a roof and used or
built for the shelter or enclosure of any person, animal, or movable property of any
kind. When any portion of a building is completely separated from every other part of
a building by area separation, each portion of the building shall be deemed as a
separate building.
CARPORT. An automobile shelter having 1 or more sides open.
DWELLING UNIT. A residential accommodation including complete kitchen and
bathroom facilities, permanently installed, which is arranged, designed, used, or
intended for use exclusively as living quarters for one (1) family.
GARAGE, PRIVATE. A detached 1 story accessory building or portion of the
principal building, including a carport, which is used primarily for the storage of
passenger vehicles, trailers, or faun trucks.
HARDSHIP. The proposed use of the property and associated structures in question
cannot be established under the conditions allowed by the city's zoning regulations
and no other reasonable alternative use exists; that the plight of the landowner is due
to the physical conditions unique to the land, structure, or building involved and are
not applicable to other lands, structures, or buildings in the same zoning district; and
that these unique conditions of the site were not caused or accepted by the landowner
after the effective date of the city's zoning regulations.
S-1Lond l a<e'.P'<irianr:s',/ /002 'jr(p, 3rd Sr A - P7. .ttartin I'arhmce. 9-08-01;.doc
Page
Variance; Martin: 11002 Lipper 33" r S�
Planning Commission Rrport 9-08-08
LOT, INTERIOR. A lot other than a corner lot, including through lots.
LOT LINE, FRONT. The boundary of a lot which abuts a public street. In the case of
a corner lot, it shall be the shortest dimension of a public street. If the dimensions of a
corner lot are equal, the front lot line shall be designated by the owner. In the case of
a corner lot in a non-residential area, the lot shall be deemed to have frontage on both
streets.
LOT LINE, REAR. The boundary of a lot which is opposite to the front lot line. If
the rear lot line is less than 10 feet in length, or if the lot forms a point at the rear, the
rear lot line shall be a line 10 feet in length within the lot, parallel to, and at the
maximum distance from the front lot line.
LOT LINE, SIDE. Any boundary of a lot which is not a front lot line or a rear lot
line.
LOT LINE. A lot line is the property line bounding a lot except that where any
portion of a lot extends into a public right-of-way or a proposed public right-of-way,
the line of the public right-of-way shall be the lot line.
LOT. A parcel of land designated by plat, metes and bounds, registered land survey,
auditors plot, or other accepted means and separated from other parcels or portions by
the description for the purpose of sale, lease or separation.
SETBACK. The minimum horizontal distance between a structure, sewage treatment
system, or other facility and an ordinary high water level, sewage treatment system,
top of a bluff, road, highway, property line, or other facility. Distances are to be
measured perpendicularly from the property line to the most outwardly extended
portion of the structure at ground level.
STRUCTURE. Anything constructed or erected on the ground or attached to the
ground or on -site utilities, including, but not limited to, buildings, factories, sheds,
detached garages, cabins, manufactured homes, signs, and other similar items.
USE, ACCESSORY. A use subordinate to and serving the principal use or structure
on the same lot and customarily incidental to the principal use.
VARIANCE. A modification of a specific permitted development standard required
to allow an alternative development standard not stated as acceptable in the official
control, but only as applied to a particular property for the purpose of alleviating a
hardship as defined in Section 300.06, Subd. 3. Economic considerations along shall
not constitute a hardship. [sic]
S., Lauri Lhc ParianrUpper 3 3rd S< 4 - .I tonav,Rep, PZ Munn' t irr xntce, V.0&08.Joc
Page 3
tln: 11002 Upper 33'd Si,
rtis,cion Ripon: 9-08-08
Variance Review
Variance The applicant is requesting that the City consider a 25 foot variance from the required
Request: 30 foot front yard setback to allow the construction of a detached garage on the
property.
Variance By code, a variance can only be granted where the city finds the request can
Criteria: successfully address the following three criteria:
1. The proposed use of the property and associated structures in question cannot be
established under the conditions allowed by the city's zoning regulations and no
other reasonable alternative use exists;
The applicant is proposing to add a single -car detached garage on the property. The
0.14 acre lot currently does not have an enclosed garage space, but instead has a
driveway located along the east property line.
The property's size and shape prohibits the addition of a detached garage in a
conforming location anywhere on the lot.
While a more -conforming location is available for a garage on the site, the location
would place the garage closer to the existing home. There is a six foot required
separation between the home and the garage for safety reasons. Attaching a garage to
the west side of the house may present structural challenges.
The request to build a single car garage on the property is a reasonable request.
Therefore, staff finds this condition is met.
2. The plight of the landowner is due to the physical conditions unique to the land,
structure, or building involved and are not applicable to other lands, structures, or
buildings in the same zoning district;
As mentioned previously, the size and shape of the property, the location of the
existing home, and the applicable setbacks do not allow the building of a detached
garage in a conforming location anywhere on the property.
The property is 0.14 acres in size — one of just a handful of properties under 0.15 acres
in size with a single family detached home on the property in the city.
The property has been in existence in its current form since 1848. Therefore, staff
finds this condition is met.
3. The unique conditions of the site were not caused or accepted by the landowner
after the effective date of the city's zoning regulations.
The property has been in existence in its current form since 1848. At that time, this
S U.rtnd C:ve.I ununreAl(1002 Upper l;n(.S, 1'.. :Llurrup,Rep; PZ Mow hitrirretce: 9-O8-08.doc
ge4
L'arirmrc; Martin: 11002 Upper 33"' $
Planning Commission Report; 9-11S-08
Variance
Conclusions:
Resident
Concerns:
area was unincorporated. Since then, Oakdale Township became the city of Lake
Elmo and the city's land use regulations have undergone a number of revisions.
Therefore, the land owner did not cause this property to be in it's current form.
Therefore, staff finds this condition is met.
Based on the analysis of the review criteria in City Code, staff would recommend
approval of the front yard variance to allow construction of a detached garage five feet
from the front property line.
Staff is not aware of any resident concerns regarding the requested variance. Staff
received a letter of support from the adjacent neighbor and a phone call of support
from an additional neighbor.
Review Conn:tettts:
Planning The site plan identifies the proposed garage to be located five feet from the front
Issues: property line and seventeen feet from the edge of Upper 33rd Street, a dead-end city
road. This property is located in the Village Area of Lake Elmo and is adjacent to a
property anticipated to develop with the availability of city sewer in the future. At the
time the property to the west of Ms. Martin's property is developed, Upper 33m Street
may be expanded and extended to service the future single family homes on that
property. This road expansion would decrease or eliminate the driveway located in
the right-of-way and therefore, reduce the stacking space for vehicles in front of the
garage. A car may need to remain on the roadway to wait while a garage door opens
instead of safely off the road. Again, this will only become an issue at the point when
(or if) Upper 33`d Street is enlarged.
The city code requires three off-street parking spaces for each residential property.
This code is currently being met through the existing driveway located on the
property. However, with the proposed garage and new driveway, the property will be
over the maximum impervious surface allowed on the lot which is 25 percent.
Therefore, staff will request that a condition of approval be the removal of a portion of
the existing hardcover to maintain the site's conformance with that regulation.
Two off-street parking spaces (in addition to the proposed one -car garage) will also
need to be maintained on the site.
Fire
Department The fire department has not expressed any significant concern with the proposed
Comments: garage location and it's proximity to a nearby fire hydrant.
Engineer The City Engineer has not expressed any significant concerns with the proposed
Comments: garage.
S Land 002 Upper 33rd Si t - :6larnn Reg,; PZ l'ui ne Fnrranre. 9-08-0S.r10,
5
l''07Y(111Ce; MOM): 1 /002. UppCT J.) JO
Planning Commission Report: 9- 08-08
VBWD
Comments:
Conclusion:
The Valley Branch Watershed District did not have any concerns with the application
as the project would be disturbing less than one acre or 6,000 cubic feet of dirt.
The applicant is seeking approval of a 25 foot variance from the required 30 foot front
yard setback for a one -car, detached garage.
Commission The Planning Commission must examine the proposed variance to determine whether
Options: the application meets all conditions of approval outlined by city code.
The Planning Commission has the following options:
A) Recommend Council approve the requested variance as it will not adversely
impact adjacent neighbor's views or water runoff and that a conforming
location for a detached garage on the property does not exist.
B) Recommend Council deny the requested variance based on the findings
identified by the commission.
The deadline for a Council decision on this item is November 8, 2008.
Staff Bee: Staff recommends approval of the variance request based on the following:
1) The addition of a single car garage on the property is a reasonable request as
accessory to the existing home.
2) The size and shape of the property as well as the location of the existing home,
septic system, and setback requirements prevent a conforming location for a
detached garage on the lot.
3) The property was platted in its current configuration in 1848, pre -dating the
existing city code requirements.
Provided the following conditions are met
1) Prior to the city issuing a building permit, a portion of the existing hardcover
must be removed to retain the property's conformance with the impervious
surface requirement of twenty-five percent of the lot.
2) Three off-street parking spaces must be accommodated on the lot.
Approval To approve the request, the Planning Commission is asked to use the following motion
Motion as a guide:
Template:
I move to recommend approval of the variance from David and Mary Brown to
;`.Land Lw,I r n002 Uiv r 3 1n1.St;1'- AfarnrrJap. PZ A/ariln Paruwce. 9.08-08.do
Variance; Martin: 11002 I?laper 3?" r St
1'lcnrnirrg Conamissiun Report: 9-08-08
allow the building of a detached garage five feet from the front property line at
11002 Upper 33" Street North... (use staffs findings provided above or cite your
own)
...with the following conditions:
1) Prior to the city issuing a building permit, a portion of the existing hardcover
must be removed to retain the property's conformance with the impervious
surface requirement of twenty-five percent of the lot.
2) Three off-street parking spaces must be accommodated on the lot.
cc: Jill Martin, 11002 Upper 33'" Street North
S land Csell'ananccs' 1l007 Upper 33rd St :\'- AlartiiRep. PZ 1Iartin Voriurtce. 9-08-015'.doc
Page 7
PURPOSED
GARAGE
ADDNION
PDNRRIVEWAY
ADDITION
45.64'
PROPERTY LINE
11
E W1 N
v =I
EXISTING STAIRWAY O
TO BASEMENT O
0
0
EXISTING
DRIVEWAY
16.001 PROPERTY LINE
EDGE OF EXISTING STREET
UPPER 33 ?D. STREET N
PURPOSED ?DDITION FOR:
JILL MARTIN
11002 UPPER 33R1D ST. N.
LAKE ELMO, MN 55042
NOTES
ONTRACTOR / OWNER TO YER FY ALL DIMENSIONS,
AND MATERIAL ON PLANS
SCALE: I/16" = ILO"
PROJECT NO.
DRAWN EIY:
SHEET:
I DATE
I REY.
ITEM:
Planning Commission
Date: 9-08-08
Consider a request for an extension of the submission of the 2030
Comprehensive Plan update to the Metropolitan Council
SUBMITTED BY: Kyle Klatt, Planning Director
SUMMARY AND ACTION REQUESTED: The planning commission is being asked to review a
request to the Metropolitan Council for an extension of the city of Lake Elmo's update to its
comprehensive plan to February 2011 to complete the still remaining required plan elements.
Currently, updates are due by December 31, 2008 according to state statute. The statute allows
for a request for an extension to the comprehensive plan deadline. The Metropolitan Council has
granted cities the opportunity to request extensions. Because the city is requesting an extension
beyond May 29, 2009, a city council resolution is required to be considered by the Metropolitan
Council Board.
The city of Lake Elmo's current Comprehensive Land Use Plan was finalized in 2006. The
Metropolitan Council is not anticipating that the city will re -work the entire 2030 plan. As of this
writing the Metropolitan Council understands that the city has been proceeding with implementing
the Village portion of the Comprehensive Plan and that this has absorbed significant time. This
work along with the future development scenario selected for the Village has been a priority to
meet the terms of the MOU and the adopted comprehensive plan for sewered development. In
addition, the water, surface water and transportation plan elements that are required to be
completed for the 2030 update, may be impacted by the future development scenario selected for
the Village after the AUAR (environmental) and financial work is completed.
The anticipated submittal date of December, 2010 for the three required comprehensive plan
elements - water, surface water and transportation - is believed to provide the city with time to
accomplish all of the required plans including a public input part of the process. If the city
proceeds with a change in the future land use of the Village based upon the Village masterplan,
this is also included in the timeline. Given the planning activities involved with this work, if and
when this comprehensive plan activity related to the Village begins, the planning commission may
find it useful to return to a twice a month meeting schedule with one meeting focusing on
comprehensive planning related activities.
According to the extension rules, it is the staff's understanding the city is encouraged to submit all
the plan elements together through the review process. The city cannot request a plan
amendment to the 2030 Comprehensive Plan, other than those identified in the resolution, until
the required plan elements are completed and submitted unless these additional amendments
are submitted at the same time as the plan elements required for the update. In developing the
timeline for this process of updating the 2030 comprehensive plan, the transportation plan is the
only plan element that may not be ready for adoption prior to an amendment to the Village future
land use map based on a scenario related to the Village masterplan being completed and ready
to go to the Metropolitan Council.
Reauired plan elements
The plan elements include:
1) a local water plan (required by statute)
2) a local surface water plan (required by statute)
3) a local transportation plan (needed to incorporate other transit/transportation improvements in to our local
transportation framework that are within the region as well as to do some local planning for roads and transit
1
that the clty Independently wanted to undertake to prepare for the future and be able to respond to county,
state, adjacent city proposals)
Although the Metropolitan Council is requesting these studies, prior to this request, the city
council and staff had discussed the importance of the transportation plan, surface water plan and
water plan for the city to deal with locally existing issues that encompass the entire community's
needs.
Additional elan element
4) when the city selects a preferred development scenario for the Village, if that
development scenario varies from the future land use of the Village in the current
comprehensive plan, the city will need to amend the future land use to reflect the
preferred development scenario. (At this time, the city does not plan to select a preferred development
scenario until after the completion of the AUAR (environmental review) and a financial analysis of some or all of
the scenarios evaluated In the AUAR is completed sometime next year.)
Reason for delay in submission
The Metropolitan Council is asking for reasons for the delay in submitting an application. One of
the primary reasons was the time and thought that went into creating the current 2030
Comprehensive Plan and getting Metropolitan Council approval as well as the work that is going
into implementing the first phase of sewered development. In addition, the city, under the
leadership of the Planning Commission, brought the two areas in the City planned for future
sewered growth into conformance with the zoning code through holding districts.
1) The Comprehensive Plan required the city to proceed with sewered development with the
Village as the highest priority for this work according to both the MOU and the 2030
Comprehensive Plan. This effort requires land use planning, environmental, financial and
engineering studies to gather information that will allow the city to make the associated
decisions to accomplish these required goals. This work has been a priority since the
adoption of the 2030 plan in 2006
2) A major environmental review process (AUAR) involving the Village is underway at this
time. The outcome of this analysis will provide important information related to water,
surface water and transportation needs for the city to incorporate into its future plan
elements.
3) The City undertook a water plan in 2005, but put the plan on hold until the outcome of the
PFC contamination work on health based values that was done by the Minnesota
Department of Health and released in the spring of 2008. The city is now working on the
water plan.
4) The City was functioning without a planning director from December, 2006 through
December, 2007. Once hired, the new planning director requires getting acquainted with
the community and land use actions and history;
5) It was important to determine the true status of the City's financial resources before
proceeding with major studies in surface water and transportation without confidence that
the City had the resources to pay for this work. Between January 2008 and June 2008
upon the advice of the city auditor, the City worked with a financial consultant to bring the
its financial records into conformance with best practices in local government.
6) The City is committed to an open public process including opportunities for public input
throughout these studies. This requires coordinating the activities so that there is time for
input on all of the systems in a meaningful way.
2
The or000sed timeline and Dlan elements (Attachment 1)
The proposed timeline anticipates completing these plans over a series of months by staggering
them so they come at the appropriate time in the City's planning cycle and so the process can be
managed and allow for public information and input along the way.
Reauired elements
• Water plan (Now — March 2009)—currently underway; was on hold until PFC health
based value data was finalized, which is now done. This is a high priority public health
and safety topic in Lake Elmo.
• Water Resources (Surface Water Plan) (January 2009 - October 2009) This will be done
using the information from the three watershed districts (Valley Branch, Browns Creek
and South Washington), the Village AUAR data which includes a Village Storm water
plan by TKDA, and new data on developments that have occurred in the past several
years.
• Transportation clan (March 2009 — March 2010) There are many transportation
improvements /studies being done by Washington County and MnDOT in the vicinity of
Lake Elmo. There is also a Lake Elmo Elementary School Safe Routes to School study
being finalized. To understand and plan for the city's transportation needs (road and
transit), it will be important to do a local transportation plan. This can incorporate the data
from MnDOT, Washington County, the Safe Routes to School and any other information.
This plan is not just related to the Village, although this information will be important to
incorporate from the AUAR, it will be important for the entire city for current conditions
and as it may grow in non-sewered and sewered development.
Potential plan amendment
• Village future land use plan (April, 2009 — November, 2009) If the city selects a
development scenario consistent with the Village Masterplan, the city will need to amend
the future land use section of the plan that relates to the Village. This action would be
required to accommodate a new development scenarios based upon the Village
Masterplan. The scenario will not be selected until the AUAR environmental review is
completed and a fiscal analysis done on any scenarios that the city wants to evaluate
fiscally prior to making a selection.
Review by neiahborina cities and Washington Countv (April, 2010 — October, 2010) A review
period for neighboring jurisdictions of six months is required. These jurisdictions often comment
prior to the end of the six months.
Public hearina. adoption and submission (November, 2010 — December, 2010) The city must
hold a public hearing, adopt and submit the comprehensive plan update.
Penalty The penalty for not updating the comprehensive plan within nine months after the
Metropolitan Council makes a decision and orders the plan update in conformance to the systems
statement the Metropolitan Council may pursue civil action against the City.
(Statute 473.175 Subd. 3)
RECOMMENDATION for motion
It is recommended that the City submit a request for an extension for the update to the 2030
comprehensive land use plan until December 2010 by moving to approve resolution 2008 — XXX
and forwarding the recommendation to the city council
3
ATTACHMENTS:
1 Proposed timeline
2 Draft Resolution requesting an extension 2008-XXx
3 Anticipated timeline for the Village project (as background information)
CITY OF LAKE ELMO
RESOLUTION NO. 2008-
RESOLUTION REQUESTING ADDITIONAL TIME
WITHIN WHICH TO COMPLETE COMPREHENSIVE PLAN
"DECENNIAL" REVIEW OBLIGATIONS
WHEREAS, Minnesota Statutes section 473.864 requires local governmental units to review
and, if necessary, amend their entire comprehensive plans and their fiscal devices and official controls at
least once every ten years to ensure comprehensive plans conform with metropolitan system plans and
ensure fiscal devices and official controls do not conflict with comprehensive plans or permit activities
that conflict with metropolitan system plans; and
WHEREAS, Minnesota Statutes sections 473.858 and 473.864 require local governmental units to
complete their "decennial" reviews by December 31, 2008; and
WHEREAS, Minnesota Statutes section 473.864 authorizes the Metropolitan Council to grant
extensions to local governmental units to allow local governmental units additional time within which to
complete the "decennial" review and amendments; and
WHEREAS, any extensions granted by the Metropolitan Council must include a timetable and plan
for completing the review and amendment; and
WHEREAS, the City of Lake Elmo will not be able to complete its "decennial" review by December
31, 2008, for the reasons listed below.
WHEREAS, the City Council finds it is appropriate to request from the Metropolitan Council an
extension so the City can have additional time to complete and submit to the Metropolitan Council for
review an updated comprehensive plan and amend its fiscal devices and official controls.
1) One of the primary reasons was the time and thought that went into creating the current 2030
Comprehensive Plan and getting Metropolitan Council approval as well as the work that is going
into implementing the first phase of sewered development. In addition, the City, under the
leadership of the Planning Commission, brought the two areas in the City planned for future
sewered growth into conformance with the zoning code through holding districts.
2) The Comprehensive Plan required the City to proceed with sewered development with the Village
as the highest priority for this work according to both the MOU and the 2030 Comprehensive
Plan. This effort requires land use planning, environmental, financial and engineering studies to
gather information that will allow the City to make the associated decisions to accomplish these
required goals. This work has been a priority since the adoption of the 2030 plan in 2006
3) A major environmental review process (AUAR) involving the Village is underway at this time. The
outcome of this analysis will provide important information related to water, surface water and
transportation needs for the City to incorporate into its future plan elements.
4) The City undertook a water plan in 2005, but put the plan on hold until the outcome of the PFC
contamination work on health based values that was done by the Minnesota Department of
Health and released in the spring of 2008. The City is now working on the water plan.
5) The City was functioning without a planning director from December, 2006 through December,
2007. Once hired, the new planning director requires getting acquainted with the community and
land use actions and history;
6) It was important to determine the true status of the City's financial resources before proceeding
with major studies in surface water and transportation without confidence that the City had the
resources to pay for this work. Between January 2008 and June 2008 upon the advice of the City
auditor, the City worked with a financial consultant to bring the City's financial records into
conformance with best practices in local government.
7) The City is committed to an open public process including opportunities for public input
throughout these studies. This requires coordinating the activities so that there is time for input on
all of the systems in a meaningful way.
NOW, TIIERFORE, BE IT RESOLVED BY I'HL PLANNING COMMISSION TO DIRECT
THE CITY COUNCIL OF LAKE ELMO, MINNESOTA, AS FOLLOWS:
1, The Planning Director is directed to submit to the Metropolitan Council no later than
November 1, 2008, an application requesting an extension to December 2010.
2. The Planning Director must include with the request a reasonably detailed timetable and plan
for completing: (a) the review and amendment by December 2010 and (b) the review and
amendment of the City's fiscal devices and official controls.
For: Against:
City of Lake Elmo
Proposed Timeline for Completion of Comprehensive Plan Elements
The steps for completing these plan elements may be modified as necessary and the dates for the steps under each plan element will
be completed as they become available.
Plan Element Estimated Start Date Estimated Completion Date
Water Plan (Required) Underway March 2009
Gather data on water quality and sources; incorporate new PFC data
Meet with neighboring cities about opportunities for shared water delivery
Develop and implement a communication plan involving MDH and PCA
where and when appropriate
Evaluate water quantity and water quality
Develop capital improvement plan with priority needs to serve current and
future needs - timing and funding
Approach funding agencies/organizations/3M
Adopt water plan
Water Resources Plan (surface water) (Required) January 2009 October 2009
Receive and accept proposal from city engineering firm
Develop communication plan/public process plan
Gather data from Brown Creek, South Washington, Valley Branch
watersheds and integrate Village storm sewer plan and AUAR information
Evaluate water quality and quantity information
Address water quality requirements and initiatives
Incorporate floodplain, lake and recreation information
Prioritize stormwater management pondinq and infrastructure
Address water quality in lakes
Ensure compliance with NPDES Phase II MS4 permit
Assure compliance with watershed and other relevant plans
Develop policies governing public and private management of
surfacewater
Develop improvement capital improvement plan
Review and revise fees for surfacewater utility
Adopt surface water management plan
3 September 2008 1
City of Lake Elmo
Proposed Timeline for Completion of Comprehensive Plan Elements
The steps for completing these plan elements may be modified as necessary and the dates for the steps under each plan element will
be completed as they become available.
Plan Element
Transportation Plan (Required)
Send out RFQ
Select Consultant
Provide communication/public input plan (significant part of timeline)
Gather data from Washington County, Transportation Plan, MnDOT studies,
other
Incorporate AUAR data and gather other local data on trip generation,
traffic and roadway volumes and capacity -deficiency
Address future road systems, connectivity
Address transit options
Address
Develop priorities and funding for transportation CIP
Adopt transportation plan
Village Future land Use Comprehensive Plan Amendment
(if new development scenario selected different than comp plan)
Complete AUAR
Complete Financial review of options
Select development scenario
Comprehensive plan amendment to capture new development scenario
Hire a consultant to assist the planning commission/planning director to lead
the process
Develop and implement a communication plan with all stakeholders
Proceed with process/review
Include AUAR mitigation plan where appropriate
Adopt comprehensive plan amendment
Proceed with zoning code changes to reflect Comprehensive plan
amendment and subdivision regulations
Airport zoning will become part of Village official controls
Estimated Start Date
March 2009
April 2008
February 2009
March 2009
April 2009
Estimated Completion Date
March 2010
January 2009
March 2009
April 2009
November 2009
3 September 2008 2
City of Lake Elmo
Proposed Timeline for Completion of Comprehensive Plan Elements
The steps for completing these plan elements may be modified as necessary and the dates for the steps under each plan element will
be completed as they become available.
Review, adoption and submission with other elements if timing is right
Review, adoption and submission timeline For required plan elements:
• Release for comment to neighboring cities/county (assumes 6 months)
• Public hearing on the plan amendment
• Adopt plan amendment
• Submit to Metropolitan Council
* This 6 month review period is often shorter than required.
Estimated Start Date Estimated Completion Date
April 2010
October 2010*
November 2010
November 2010
December 2010
3 September 2008 3
City of Lake Elmo
Proposed Timeline for Completion of Comprehensive Plan Elements
The steps for completing these plan elements may be modified as necessary and the dates for the steps under each plan element will
be completed as they become available.
Plan Element
INTENTIONALLY LEFT BLANK
Estimated Start Date Estimated Completion Date
3 September 2008 4