My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/24/2021
Lauderdale
>
City Council
>
City Council Meeting Packets
>
2021
>
08/24/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:35:49 PM
Creation date
8/24/2021 1:28:14 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Meeting Date
8/24/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® Stantec <br />Owner: City of Lauderdale Date August 19, 2021 <br />Contractor: Valley -Rich Co., Inc. <br />STORM SEWER PIPE REPAIRS <br />MALVERN/WALNUT ALLEY, NORTH OF ROSELAWN AVE, <br />Description of Work <br />Replace damaged clay file storm sewer pipe at the south side of existing catch basin in the alley between Malvern St and Walnut St, and 50' north <br />of Roselawn Ave. Patch bituminous alley pavement. <br />No. <br />Item <br />Unit <br />Contract <br />Quantity <br />Unit <br />Price <br />Total <br />Amount <br />1 <br />MOBILIZATION/TRAFFIC CONTROL <br />LS <br />1 <br />$1,350,00 <br />$1,350.00 <br />2 <br />REMOVE BITUMINOUS PAVEMENT, INCL, SAWCUT <br />SY <br />35 <br />$26,00 <br />$910,00 <br />3 <br />REMOVE DAMAGED PIPE AND REPLACE WITH 10" PVC, SDR 35 <br />LS <br />1 <br />$3,400,00 <br />$3,400.00 <br />4 <br />REMOVE EXISTING AND INSTALL NEW CONCRETE ADJUSTMENT RINGS <br />LS <br />1 <br />$1,400.00 <br />$1,400,00 <br />5 <br />RECONSTRUCT DOGHOUSE AT CATCH BASIN <br />LS <br />1 <br />$1,450.00 <br />$1,450.00 <br />6 <br />CLASS 5 AGGREGATE BASE, 100% CRUSHED (MNDOT 3138) <br />TN <br />25 <br />$44,00 <br />$10100,00 <br />7 <br />BITUMINOUS PATCHING, INCLUDING TACK COAT <br />SY <br />35 <br />$90,00 <br />$3,150.00 <br />8 <br />COMMON EXCAVATION, INCLUDING DISPOSAL <br />CY <br />12 <br />$82.00 <br />$984,00 <br />TOTAL <br />$13,744,00 <br />NOTES: <br />1 PIPE REPLACMENT ITEM TO INCLUDE EXCAVATION, BACKFILL, PIPE BEDDING WITH GRANULAR BORROW (MNDOT 3149.281 MOD) FROM <br />6"BELOW BOTTOM OF PIPE TO 12" ABOVE TOP OF PIPE, CONNECTION TO EXISTING CATCH BASIN AND CONNECTION TO EXISTING CLAY <br />PIPE WITH STRONG BACK FERNCO COUPLING AND CONCRETE <br />2 <br />ALLEY PAVEMENT SECTION SHALL CONSIST OF <br />12"CLASS 5 AGGREGATE BASE AND 4" BITUMINOUS (2 <br />LIFTS) <br />3 <br />COMMON EXCAVATION SHALL ONLY BE USED <br />FOR EXCESS MATERIAL THAT MUST BE HAULED OFFSITEI <br />4 THE EXISTING CLAY PIPE HAS COLLAPASED 3' TO 4' FEET SOUTH OF THE CATCH BASIN, THE PIPE IS 4.5' DEEP, <br />5 SALVAGE AND REINSTALL EXISTING CASTING SHALL BE INCIDENTAL TO INSTALLATION OF NEW CONCRETE RINGS <br />6 BITUMINOUS PATCH MIX: SP 9.5 (2,B) SPWEA240B <br />7 QUANTITIES LISTED ARE ESTIMATED, AMOUNT PAID WILL BE BASED ON FIELD MEASUREMENTS OF COMPLETED QUANTITIES <br />193605)Ol Pipe Rcp�irs.alsm <br />
The URL can be used to link to this page
Your browser does not support the video tag.