Laserfiche WebLink
-3,63.8 MI'ssed Collections — The Contractor shall have a duty to pick up missed collections. Missed <br />collections called in before 12 pm on the collection day will be collected that day. Calls after 12 pm <br />I �!1111 a nAA1i1nrj__r1-_%%1 <br />will be collected I;I:i5: 11 F�.Wvv I I A Zi 11;f� before 4 pm on the followlina day. Missed collections called in <br />before 11 am on the day after collections will be collection that day before 4 pm. Calls received after <br />11 <br />r%n +ktn, I am will be collected %1!Gw-��usi���before 4 pm on the followincl business day. <br />The same policy will apply for missed collections called in two days or more after collection. �Calls <br />Gged4R-for rNssed service are either customer calls made direc �Iy to the Contractor or customer calls <br />Gafled-L-ree.11a,vied to the Contractor by the City.) <br />Materials ReGyGled-§Li_41�1 EL. R -aclej The Contractor shall use every best effort to <br />ensure that all recyclable materials collected in �����the Ci -are not placed in landfills or <br />ip���&Lher mixed municipal solid waste gdLisposal or recoveDj facilftises but are distributed to the <br />appropriate markets for reuse and recycling. Any unacceptable materials or garbage will be <br />delivered to the appropriate facilities in accordance w�Lh Sta and Countv rules and documented as <br />such. All weight tickets, etc. shall be maintained at the Contractors office forreview. The Contractor <br />will report facRy residual rates to the City once yearly. All costs associated with disposal will be borne <br />by the Contractor. The contractor 41shall at all times be -under -have the duty to minimize recyclable <br />materials anI40@-�pjg�d in landfills or incinerators, and, in consultation with the City, shall at all <br />times r",v,).11,G_,-find and use the lowest cost but most environmentally sound method of disposal.. <br />In the event that the-,qamarket for a particular recyclable material ceases to exist, or becomes <br />economically depressed such that it becomes economically[SAY8] unfeasible to continue <br />in <br />collection of the particular material, the City \/\/ill have the right to cause the Contractor to cease thW. <br />collection of that particular recyclable material. <br />If the Contractor requests to cease collection of a particular recyclable materiaky-is���� <br />+e% +kn ee%r%+r-nr% i <br />D'inriili nnrill +kn AQV, a;;dbut the CitNO directs the Contra ctor to <br />continue to collect the matte;,flal, the Cit�j agrees to bear the cost incurred by the Contractor to market <br />or dispose of such recyclable material by landfill, incineration or other method. <br />The Contractor will negotiate in good faith to establish a rate of recovery for all recyclable materials <br />ni I 4�n <br />+kzn, +A�n 14 lAnviiiii, I C oil r% gn <br />colle cited in the CitV under this Aagreemen 1-%, 1+ ',inNw <br />�W <br />r%f collections route <br />%_#%.I a %.Ip 1%.7 U a 1, n approved weight slip with the date, time, <br />driver's name, vehicle number, tare weight, gross weight, and net weight for each <br />load each day. <br />2. Collection vehicles will be weighed after completion of a route or at the end of the <br />day, whichever occurs first. A copy of each weight ticket shall be included as part <br />of the billing sent to the City each month. <br />3. The Contractor will also include a report of the total tons collected, including <br />estimated amounts of each type of material delivered to each market. <br />4. The Contractor will also report amount and location of all materials stored for <br />more than 30 days. <br />PAGE 6 OF 14 <br />