HomeMy WebLinkAbout07/09/2024The City Council is meeting as a legislative body to conduct the business of the City accoiding to
Robert s Rules of Order and the Standing Rules of Order and Business of the City Council Unless so
ordered by the Mayor, citizen participation is limited to the times indicated and always within the
prescribed rules of conduct foi public input at meetings.
1. CALL TO ORDER THE LAUDERDALE CITY COUNCIL MEETING
2. ROLL CALL
3. APPROVALS
a. Agenda
b. Minutes of the June 25, 2024 City Council Meeting
c. Claims Totaling $71,924.01
4. CONSENT
a. Performance Agreement with Lazy Does It Band for Day in the Park
s. SPECIAL ORDER OF BUSINESS/RECOGNITIONS/PROCLAMATIONS
6 INFORMATIONAL PRESENTATIONS / REPORTS
a. Metropolitan Council Sector Representative Peter Lindstrom
b. Day in the Park
7. PUBLIC HEARINGS
Public hearings are conducted so that the public affected by a proposal may have input into the decision.
During hearings all affected residents will be given an opportunity to speak pursuant to the Robert's
Rules of Order and the standing rules of order and business of the City Council.
a. Annual Opportunity for the Public to Comment on the City's Stormwater Pollution
Prevention Program
8. DISCUSSION / ACTION ITEM
9. ITEMS REMOVED FROM THE CONSENT AGENDA
10 ADDITIONAL ITEMS
11. SET AGENDA FOR NEXT MEETING
a. 2025 Budget and Levy
b. One -Year Extension to Agreement with the City of St. Anthony for Policing Services
12. WORK SESSION
a. Community Development Updates
LAUDERDALE CITY COUNCIL MEETING AGENDA
7:00 P.M. TUESDAY, JULY 9, 2024
LAUDERDALE CITY HALL, 1891 WALNUT STREET
The City Council is meeting as a legislative body to conduct the business of the City accoiding to
Robert s Rules of Order and the Standing Rules of Order and Business of the City Council Unless so
ordered by the Mayor, citizen participation is limited to the times indicated and always within the
prescribed rules of conduct foi public input at meetings.
1. CALL TO ORDER THE LAUDERDALE CITY COUNCIL MEETING
2. ROLL CALL
3. APPROVALS
a. Agenda
b. Minutes of the June 25, 2024 City Council Meeting
c. Claims Totaling $71,924.01
4. CONSENT
a. Performance Agreement with Lazy Does It Band for Day in the Park
s. SPECIAL ORDER OF BUSINESS/RECOGNITIONS/PROCLAMATIONS
6 INFORMATIONAL PRESENTATIONS / REPORTS
a. Metropolitan Council Sector Representative Peter Lindstrom
b. Day in the Park
7. PUBLIC HEARINGS
Public hearings are conducted so that the public affected by a proposal may have input into the decision.
During hearings all affected residents will be given an opportunity to speak pursuant to the Robert's
Rules of Order and the standing rules of order and business of the City Council.
a. Annual Opportunity for the Public to Comment on the City's Stormwater Pollution
Prevention Program
8. DISCUSSION / ACTION ITEM
9. ITEMS REMOVED FROM THE CONSENT AGENDA
10 ADDITIONAL ITEMS
11. SET AGENDA FOR NEXT MEETING
a. 2025 Budget and Levy
b. One -Year Extension to Agreement with the City of St. Anthony for Policing Services
12. WORK SESSION
a. Community Development Updates
b. Opportunity for the Public to Address the City Council
Any member of the public may speak at this time on any item not on the agenda. In consideration for
the public attending the meeting, this portion of the meeting will be Limited to fifteen (15) minutes
Individuals are requested to limit their comments to three (3) minutes or less. If the majority of the
Council determines that additional time on a specific issue is warranted, then discussion on that issue
shall be continued at the end of the agenda. Before addressing the City Council, members of the public
are asked to step up to the microphone, give their name, address, and state the subject to be discussed.
All remarks shall be addressed to the Council as a whole and not to any member thereof. No person
other than members of the Council and the person having the floor shall be permitted to enter any
discussion without permission of the presiding officer.
Your participation, as prescribed by the Robert's Rules of Order and the standing rules of order and
business of the City Council, is welcomed and your cooperation is greatly appreciated.
13. ADJOURNMENT
To provide public comments, join us via Zoom.
You are invited to a Zoom webinar.
When: Jul 9, 2024 07:00 PM Central Time (US and Canada)
Topic: July 9, 2024 Lauderdale City Council Webinar
P lease click the link below to join the webinar:
https://us02web.zoom.us/J/82137288495?pwd=2WG2yhKpPESn73uRITs3cZnDBO78TN.1
P asscode 172260
Or One tap mobile :
+ 13126266799„82137288495#,,,,* 172260# US (Chicago)
+ 16465588656„82137288495#,,,,* 172260# US (New York)
Or Telephone:
Dial(for higher quality, dial a number based on your current location):
+ 1 312 626 6799 US (Chicago)
+ 1 646 558 8656 US (New York)
+ 1 646 931 3860 US
+ 1 301 715 8592 US (Washington DC)
+ 1 305 224 1968 US
+ 1 309 205 3325 US
+ 1 346 248 7799 US (Houston)
+ 1 360 209 5623 US
+ 1 507 473 4847 US
+ 1 669 900 9128 US (San Jose)
+ 1 253 215 8782 US (Tacoma)
Webinar ID: 821 3728 8495
Passcode 172260
International numbers available: https://us02web.zoom.us/u/kdUUbeQVM
LAUD I ,RDAL h CITY COUNCIL
MhETING MINUTH,S
L auderdale City Hall
1891 Walnut Street
L auderdale, MN 55113
P age 1 of 3 June 25, 2024
Call to Order
Mayor Gaasch called the Regular City Council meeting to order at 7:04 p.m.
Roll Call
Councilors present Evan Sayre, Jeff Dains, Sharon Kelly, Duane Pulford, and Mayor Mary
Gaasch. Councilors absent: None.
Staff present: Heather Butkowski, City Administrator; Jim Bownik, Assistant to the City
Administrator and Miles Cline, Deputy City Clerk.
Approvals
Mayor Gaasch asked if there were any additions to the meeting agenda. There being none,
Councilor Pulford moved and seconded by Councilor Kelly to approve the agenda. Motion
carried unanimously.
Mayor Gaasch asked if there were corrections to the minutes of the June 11, 2024 City Council
meeting. Theie being none, Councilor Sayre moved and seconded by Councilor Pulford to
approve the June 11, 2024 City Council meeting minutes. Motion carried unanimously.
Mayor Gaasch asked if there were any questions on the claims. Councilor Kelly questioned why
the claims total was larger than normal. Administrator Butkowski responded that the claims
report included checks to St. Anthony foi police services a bond interest payment, and tree
trimming that will be covered by the DNR giant that made it higher than normal. Councilor
Kelly moved and seconded by Councilor Sayre to approve the claims totaling $157,902.84.
Motion carried unanimously.
Consent
Councilor Sayre moved and seconded by Councilor Pulford to approve the Consent Agenda
thereby approving the May financial report.
P ublic Hearings
A. Resolution No. 062524A — Abating Three Trees at 1852 Carl Street
There are two diseased ash trees and a dead maple tree at 1852 Carl Street. Butkowski said that
staff are usually able to work with the owners of dead and diseased trees to have them removed
through a petition and waiver agi eement. In this case, the owner has not responded to letters sent
to the property, nor another out-of-state address listed. The trees pose a health and safety risk and
need to be removed. An estimate of $4,000 was received from the City's tree trimmer to
complete the work.
Mayor Gaasch opened the floor at 7:16 p.m. to those in attendance interested in addressing the
LAUDhRDALF CITY COUNCIL
MEFTING MINUTES
L auderdale City Hall
1891 Walnut Street
L auderdale, MN 55113
Page 2 of 3 June 25, 2024
Council on this topic. There being nobody interested in speaking, Mayor Gaasch closed the floor
at 7:16 p.m.
Councilor Pulford made a motion to adopt Resolution No. 062524A—A Resolution Abating
Three Trees at 1852 Carl Street. This was seconded by Councilor Kelly and carried unanimously.
Discussion/Action Item
A. 2024-2029 Amended and Restated Agreement for Recycling Services with Eureka!
B ownik said the current recycling agreement with huieka began in 2019 and ends at the end of
June. A revised and restated recycling agreement was negotiated with Eureka and is ready for
approval by the City Council. The new agreement would begin July 1 and goes through October
31 2029. The new agreement is based on the current agreement and is substantially the same.
City staff, Eureka, Foth Infrastructure & Environment, and Kennedy & Graven have reviewed it.
Along with a new term for the agreement, there is also a new pricing schedule. Bownik said what
while the price is increasing, research shows it is still favorable Eureka lets Lauderdale share
overhead with St. Paul to keep costs lower and maintain the services of the City's recycling cart
inventory. Angie Lemar, of FOTH Infrastructure & Environment, prepared a comparison with
other nearby cities.
Katie Drews, Co -President and CEO of Eureka Recycling, joined the meeting via Zoom to
answer questions from the Council.
Councilor Sayre made a motion to approve the Amended and Restated Agreement for Recycling
Services with Eureka Recycling as presented. This was seconded by Councilor Dains and carried
unanimously.
Set Agenda for Next Meeting
Butkowski stated that the July 9 council meeting might include the storm water public healing,
2025 budget and levy, and a presentation from Metropolitan Council sector representative Peter
Lindstrom.
Work Session
A. Community Development Update
Butkowski shared that the City s intern, William Farley, is in the process of reformatting the
City's newsletter. SAPAS will be hosting a monthly luncheon in the social room for seniors.
Ramsey County is eyeing July 30 as the date for their Eustis Street open house. 4H will
collaborate with Day in the Park for their pie social event. The work session with Jennifer
Haskamp has been scheduled for July 15.
LAUDERDALE CITY COUNCIL
MEETING MINUTES
Lauderdale City Hall
1891 Walnut Street
Lauderdale, MN 55113
Page 3 of 3 June 25, 2024
B. Opportunity for the Public to Address the City Council
Mayor Gaasch opened the floor to those in attendance interested in addressing the Council.
There being nobody interested in speaking, Mayor Gaasch closed the floor.
Adjournment
Councilor Dains moved and seconded by Councilor Pulford to adjourn the meeting at 8:14 p.m.
Motion carried unanimously.
Respectfully submitted,
lhAtee„ t4A-
Miles Cline
Deputy City Clerk'
To:
From:
Meeting Date:
Subject:
CITY OF LAUDERDALE
LAUDERDALE CITY HALL
1891 WALNUT STREET
LAUDERDALE, MN 55113
651-792-7650
651-631-2066 FAx
Request for Council Action
Mayor and City Council
City Administrator
July 9, 2024
List of Claims
The claims totaling $71,924.01 are provided for City Council review and approval that
includes check numbers 28975 to 28994.
Accounts Payable
Checks by Date -Detail by Check Date
User:
Printed:
lniles.cline
7/3/2024 2:40 PM
Check No Vendor No Vendor Name
Invoice No Description
ACH 43
ACH 44
ACH 45
ACH 46
ACH 47
ACH 372
072024
28975 427
41205
28976 383
S1 474681070124
28977 52
Public Employees Retirement Association
PR Batch 51400.07.2024 PERA Coordinated
PR Batch 51400.07.2024 PERA Coordinated
Check Date
Reference
07/05/2024
PR Batch 51400.07.2024 PER
PR Batch 51400.07.2024 PER
Total for this ACH Check for Vendor 43:
Minnesota Department of Revenue
PR Batch 51400.07.2024 State Income Tax
07/05/2024
PR Batch 51400.07.2024 Stab
Total for this ACH Check for Vendor 44:
ICMA Retirement Corporation
PR Batch 51400.07.2024 Deferred Comp
PR Batch 51400.07.2024 Deferred Comp
07/05/2024
PR Batch 51400.07.2024 Def(
PR Batch 51400.07.2024 Def(
Total for this ACH Check for Vendor 45:
Internal Revenue Service
PR Batch 51400.07.2024 Medicare Employee Pc
PR Batch 51400.07.2024 FICA Employer Portio:
PR Batch 51400.07.2024 Federal Income Tax
PR Batch 51400.07.2024 Medicare Employer Po
PR Batch 51400.07.2024 FICA Employee Portio
07/05/2024
PR Batch 51400.07.2024 Med
PR Batch 51400.07.2024 FIC.
PR Batch 51400.07.2024 Fed(
PR Batch 51400.07.2024 Med
PR Batch 51400.07.2024 FIC.
Total for this ACH Check for Vendor 46:
Public Employees Insurance Program
PR Batch 51400.07.2024 Dental
PR Batch 51400.07.2024 Health Insurance
07/05/2024
PR Batch 51400.07.2024 Den
PR Batch 51400.07.2024 Hea
Total for this ACH Check for Vendor 47:
Total for 7/5/2024:
Duane Pulford 07/09/2024
Mileage & Hotel Reimbursement
Total for this ACH Check for Vendor 372:
A.J. Schaake Co
Two 100 -Year Plaques
Aspen Waste Systems of Minnesota Inc
July Refuse Service
Bluechip Tree Company Inc
07/09/2024
Total for Check Number 28975:
07/09/2024
Total for Check Number 28976:
07/09/2024
Check Amount
1,268.70
1,099.53
2,368.23
742.43
742.43
1,152.08
1,691.64
2,843.72
264.57
1,131.26
1,904.82
264.57
1,131.26
4,696.48
85.20
2,732.58
2,817.78
13,468.64
442.18
442.18
158.00
158.00
441.16
441.16
AP Checks by Date - Detail by Check Date (7/3/2024 2:40 PM)
Page 1
Check No Vendor No
Invoice No
Vendor Name
Description
Check Date
Reference
Check Amount
072024
28978 56
072024
28979 57
072024
28980 272
1680893
28981 25
072024
28982 82
072024
28983 78
2024-2025
2024-2025
2024-2025
2024-2025
2024-2025
2024-2025
2024-2025
2024-2025
2024-2025
28984 428
072024
28985 23
INV2547441
28986 387
2052
2052
2052
28987 24
0001175408
Remove Storm Damaged Limb & Brush Pile fro -
James Bownik
2Q2024 Mileage Reimbursement
Heather Butkowski
2Q2024 Mileage Reimbursement
Corporate Four Insurance Agengy
2024 Agent Fee
Total for Check Number 28977:
07/09/2024
Total for Check Number 28978:
07/09/2024
Total for Check Number 28979:
07/09/2024
Total for Check Number 28980:
County of Ramsey 07/09/2024
Record 1769 Walnut Drainage and Utility Mortg
Horne Depot
General Supplies
Total for Check Number 28981:
07/09/2024
Total for Check Number 28982:
League of Minnesota Cities Insurance Trust 07/09/2024
2024-2025 Property/Liability Insurance
2024-2025 Property/Liability Insurance
2024-2025 Property/Liability Insurance
2024-2025 Property/Liability Insurance
2024-2025 Property/Liability Insurance
2024-2025 Property/Liability Insurance
2024-2025 Property/Liability Insurance
2024-2025 Property/Liability Insurance
2024-2025 Property/Liability Insurance
Kathy McCurdy
Khazanah Dancers
Metro Sales Inc
2Q24 Copy Charges
Metro -INET
July IT/Phone
July IT/Phone
July IT/Phone
Total for Check Number 28983:
07/09/2024
Total for Check Number 28984:
07/09/2024
Total for Check Number 28985:
07/09/2024
Total for Check Number 28986:
Metropolitan Council Environmental Servi< 07/09/2024
August Waste Water
AP Checks by Date - Detail by Check Date (7/3/2024 2:40 PM)
945.00
945.00
70.48
70.48
152.76
152.76
1,200.00
1,200.00
46.00
46.00
34.34
34.34
1,402.02
639.89
833.48
2,999.29
8,766.07
49.86
100.68
3,266.33
237.38
18,295.00
100.00
100.00
77.99
77.99
547.01
275.97
1,641.02
2,464.00
14,146.65
Page 2
Check No Vendor No
Invoice No
Vendor Name
Description
28988 84
072024
072024
072024
072024
072024
072024
072024
072024
072024
072024
28989 356
795
28990 26
2247876
2247876
28991 404
072024
28992 3
531536548
28993 425
6290263645
6290263645
6290265847
6290265847
28994 85
072024
Check Date
Reference
Check Amount
Total for Check Number 28987:
North Star Bank Cardmember Services 07/09/2024
June Costco Fuel
MCFOA Membership - MC
Commercial Roofing Specialties - City Hall Roo
FastSigns - City Truck Decals
MCFOA Membership - JB
June Costco Fuel
USPS - Certified Letter
June Costco Fuel
MCFOA Membership - HB
Jump City - Bounce House
Total for Check Number 28988:
Rum River Ventures LLC
May 2024 Contract Building Inspection Services
Stantec Consulting Services Inc
EPA Response
Sanitary Sewer Manhole Televising
Star Tribune
July -October Subscription
US National Equipment Finance Inc
July Copier Lease
Vestis
June Uniforms
June Uniforms
July Uniforms
July Uniforms
Len Yaeger
Day in the Park Music
07/09/2024
Total for Check Number 28989:
07/09/2024
Total for Check Number 28990:
07/09/2024
Total for Check Number 28991:
07/09/2024
Total for Check Number 28992:
07/09/2024
Total for Cheek Number 28993:
07/09/2024
Total for Check Number 28994:
Total for 7/9/2024:
Report Total (26 checks):
14,146.65
295.78
50.00
157.16
49.54
50.00
63.38
17.46
63.38
50.00
481.75
1,278.45
4,081.35
4,081.35
4,070.00
9,542.18
13,612.18
64.77
64.77
155.00
155.00
22.76
22.77
22.76
22.77
91.06
599.00
599.00
58,455.37
71,924.01
AP Checks by Date - Detail by Check Date (7/3/2024 2:40 PM)
Page 3
LAUDERDALE COUNCIL
ACTION FORM
i
Action Requested
Consent X
Public Hearing
Discussion
Action
Resolution
Work Session
Meeting Date July 9, 2024
ITEM NUMBER July Community Event
STAFF INITIAL Jim
APPROVED BY ADMINISTRATOR
DESCRIPTION OF ISSUE AND PAST COUNCIL ACTION:
Staff is asking the city council to consider approving the attached performance agreement
with Lazy Does It for July music at a cost of $600.
The July event is scheduled from 5-8 p.m. on Thursday, July 18.
OPTIONS:
Approve by adopting the consent agenda or remove for discussion.
STAFF RECOMMENDATION:
By approving the consent agenda, the city council is approving the attached performance
agreement with Lazy Does It.
City of Lauderdale Performance Agreement
Event: Day in the Park
Date & Time: Thursday, July 18, 2024 from 5-8 p.m.
Location• Lauderdale Community Park, 1885 Fulham Street
P erformance Time: 5:00-6:00 p.m. & 6:30-7:30 p.m.
ARTIST or GROUP INFORMATION
Artist or Group Name. Lazy Does It
Artist/Group Leader: Len Yaeger
D aytime Phone: 612-331-8530
Cell Phone:
Email Address: yaege033@umn.edu (valid through 12/7/2024); len.yaeger(c;)gmail.com
Website Address (if applicable): http://omelet.typepad.com/lazy does it
1k Chairs Needed: 6 Electricity: yes Fxtension cord: yes
PAYMENT INFORMATION
Performance Fee $600.00
N ame & Address of Individual or Group for Payment of Fee:
Len Yaeger
1201 Yale Place 42002
Minneapolis, MN 55403
PERFORMANCE PROVISIONS
1) The Artist or Group is considered an independent contractor and is responsible for all appropriate
insurance and income taxes.
2) The Artist or Group will supply their own sound system and the following items as needed:
music stands, stage etc.
3) The City will provide chairs, electricity and an extension cord if needed. The City will also have
a copyright license from ASCAP.
4) Cancellation/Inclement Weather Policy:
• If the performance is cancelled by the City before Noon the day of the performance, the City
will pay 50% of the agreed peiformance fee as compensation.
• If the performance is cancelled by the City after Noon the day of the performance, the City
will pay 100% of the agreed peiformance fee as compensation.
5) Sale of promotional merchandise is allowed at the concert site.
6) Payment Infoimation: The City will make every effort to present payment to the Artist or Group
the day of the performance, but may mail payment within 2 weeks after performance date.
7) Indemnification: The Artist or Group agrees to defend and indemnify the City, and its
employees, officials, volunteers and agents from and against all claims, actions, damages, losses
and expenses arising out of the Artist or Group's peiformance or failure to perform its duties
under this Agreement.
Signature of Artist/Group Leader: Date:
Mary Gaasch, Mayor
Date Heather Butkowski, City Administrator Date
LAUDERDALE COUNCIL
ACTION FORM
Action Requested
Consent
Public Comment X
Discussion X
Action
Resolution
Work Session
Meeting Date
July 9, 2024
ITEM NUMBER Annual torm Water Report
STAFF INITIAL
APPROVED BY ADMINISTRATOR
DESCRIPTION OF ISSUE AND PAST COUNCIL ACTION:
Annually, the City Council must hold a public hearing to allow the public to comment on
the City's storm water program. This meets one of the requirements of our Municipal Sepa-
rate Storm Sewer System (MS4) permit. Typically staff attach the most recent annual re-
port to the Minnesota Pollution Control Agency (MPCA). This year, we did not have to
complete one by the end of June. We will have to make up for it when the MPCA's new
reporting software comes online next yeas. Attached is the City's MS4 permit which docu-
ments the City's required commitments through 2025.
Staff will provide some brief comments before the Council opens the public hearing on the
matter.
STAFF RECOMMENDATION:
MINNESOTA POLLUTION
CONTROL AGENCY
520 Lafayette Road North 1 St. Paul, Minnesota 55155-4194 1 651-296-6300
800-657-3864 1 Use your preferred relay service 1 info.pca@state.mn.us 1 Equal Opportunity Employer
September 28, 2021
Heather Butkowski
City of Lauderdale
1891 Walnut Street
Lauderdale, MN 55113-5137
RE: Issuance of Coverage under the Small Municipal Separate Storm Sewer Systems General Permit
MNR040000 for city of Lauderdale MS4
Dear Heather Butkowski:
In accordance with Minn. R. 7001.0140, the Minnesota Pollution Control Agency (MPCA) is issuing
coverage under the Small Municipal Separate Storm Sewer System (MS4) General Permit MNR040000
(MS4 General Permit) to the city of Lauderdale MS4, effective September 28, 2021. Enclosed is your
official Notice of Coverage, which includes the above referenced MS4 General Permit requirements.
Our final decision to issue permit coverage was based on the following:
• You submitted a complete application; and
• No applicable comments were received or all applicable comments received have been
addressed;
If you were covered under the August 1, 2013, MS4 General Permit, coverage under that permit is
immediately terminated as of the date on this letter.
You must:
• Comply with the requirements of the MS4 General Permit and your Stormwater Pollution
Prevention Program (SWPPP) Document;
• Meet the new requirements in the MS4 General Permit within 12 months of the date of
receiving permit coverage;
• Retain your SWPPP Document and all records pertinent to it for at least three (3) years beyond
the term of the MS4 General Permit
• Report on activities that were required or committed to under the previous permit. Your annual
report, due June 30 of each year, must cover all activities and permit requirements of the
previous calendar year regardless which permit those activities are conducted under and
• Retain this letter as documentation of your coverage under the MS4 General Permit.
The issuance of coverage does not preclude the MPCA from conducting inspections or audits.
Heather Butkowski
Page 2
September 28, 2021
If you have questions, please contact Nick Nistler at 218-302-6670 or nicholas.nistler@state.mn.us.
Sincerely,
V vvano V t'vn,oanci.-o i i.
This document has been electronically signed.
Duane Duncanson
Supervisor
Municipal Stormwater Unit
Municipal Division
DD/NN:map
cc: Activity GEN20180001 @ Al ID 93002
MINNESOTA POLLUTION
CONTROL AGENCY
AUTHORIZATION TO DISCHARGE STORMWATER
ASSOCIATED WITH SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS
UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/
STATE DISPOSAL SYSTEM (SDS) PROGRAM
MS400026
Permittee: City of Lauderdale
Coverage issuance date: September 28, 2021
Expiration date: November 15, 2025
The state of Minnesota, on behalf of its citizens through the Minnesota Pollution Control Agency (MPCA), authorizes
the Permittee to operate a small municipal separate storm sewer system (MS4) and to discharge from the small MS4
to receiving waters, in accordance with the requirements of the Small Municipal Separate Storm Sewer Systems
General Permit MNR040000 (General Permit).
The goal of the General Permit is to reduce pollutant levels in point source discharges and protect water quality in
accordance with the U.S. Clean Water Act, Minnesota statutes and rules, and federal laws and regulations.
The MPCA issued the General Permit on November 16, 2020, however the permittee received coverage under the
General Permit on the coverage issuance date identified above. The General Permit expires at midnight on the
expiration date identified above.
Signature: Ve4'an o Dimet.oaervieort. for the Minnesota Pollution Control Agency
This document has been electronically signed.
Duane Duncanson
Supervisor
Municipal Stormwater Unit
Municipal Division
If you have questions about the General Permit, including specific permit requirements, permit reporting, or permit
compliance status, please contact the MPCA at:
Municipal Stormwater Program
Municipal Division
Minnesota Pollution Control Agency
520 Lafayette Road North
St. Paul, Minnesota 55155-4194
Telephone: 651-296-6300 or toll free in Minnesota: 800-657-3864
Table of Contents
Page
1.1 Eligibility 3
2.1 Authorized Stormwater Discharges 3
3.1 Authorized Non-Stormwater Discharges 3
4.1 Limitations on Authorization 3
5.1 Permit Authorization 3
6.1 Transfer of Ownership or Control 4
7.1 Issuance of Individual Permits 4
8.1 Rights and Responsibilities 4
9.1 Application for Reissuance 4
10.1 New Permittee Applicants 4
11.1 Existing Permittee Applicants, 4
12.1 Stormwater Pollution Prevention Program (SWPPP) Document 4
13.1 Stormwater Pollution Prevention Program (SWPPP) 6
14.1 Mapping 6
15.1 Minimum Control Measures (MCMs) 6
16.1 MCM 1: Public Education and Outreach 6
17.1 MCM 2: Public Participation/Involvement 7
18.1 MCM 3: Illicit Discharge Detection and Elimination 8
19.1 MCM 4: Construction Site Stormwater Runoff Control 10
20.1 MCM 5: Post -Construction Stormwater Management 12
21.1 MCM 6: Pollution Prevention/Good Housekeeping For Municipal Operations 15
22.1 Discharges to Impaired Waters with a USEPA-Approved TMDL that includes an Applicable WLA 17
23.1 Alum or Ferric Chloride Phosphorus Treatment Systems 18
24.1 Stormwater Pollution Prevention Program (SWPPP) Modification 19
25.1 Annual Assessment, Annual Reporting, and Recordkeeping 20
26.1 General Conditions 20
27.1 Definitions 22
Appendix A: Alum or Ferric Chloride Phosphorus Treatment Systems 26
Appendix B: Schedules 27
Coverage issued September 28, 2021
Permit expires: November 15, 2025
M5400026
Page 3 of 28
1.1
Eligibility.
[Minn. R. 7090]
1.2
To be eligible for authorization
General Permit (General
Municipal Separate Storm
in Minn. R. 7090.1010.
to discharge
Permit), the applicant
Sewer System (MS4)
[Minn. R. 7090.1010]
stormwater under the Small Municipal Separate Storm Sewer Systems
must be an owner and/or operator (owner/operator) of a small
and meet one or more of the criteria requiring permit issuance as specified
2.1
Authorized Stormwater Discharges.
[Minn. R. 7090]
2.2
The General Permit authorizes stormwater discharges
from small MS4s as defined
in 40 CFR 122.26(b)(16).
[Minn. R. 7090]
3.1
Authorized Non-Stormwater Discharges.
[Minn. R 7090]
3.2
The following
permittee's small
discharges),
Program (SWPPP):
groundwater
potable water
pumps, footing
dechlorinated
[Minn. R. 7090]
categories
in
infiltration
sources,
swimming
of non-stormwater discharges or flows are authorized under the General
MS4 only if the permittee does not identify them as significant contributors
which case the discharges or flows must be addressed in the permittee's Stormwater
water line flushing, landscape irrigation, diverted stream flows, rising groundwaters,
(as defined at 40 CFR 35.2005(b)(20)), uncontaminated pumped groundwater,
foundation drains, air conditioning condensation, irrigation water, springs,
drains, lawn watering, individual residential car washing, flows from riparian habitats
pool discharges street wash water, and discharges or flows from firefighting
Permit to enter the
of pollutants (i.e., illicit
Pollution Prevention
uncontaminated
discharges from
water from crawl space
and wetlands,
activities.
4.1
Limitations on Authorization.
[Minn. R. 7090]
4.2
The following discharges or activities are not authorized
a. non-stormwater discharges, except those authorized
b. discharges of stormwater to the small MS4 from
does not replace or satisfy any other permitting
c. the General Permit does not replace or satisfy
Minnesota Environmental Policy Act (Minn. Stat.
d the General Permit does not replace or satisfy
new or expanded discharges that adversely impact
species, or adversely modify a designated critical
e. the General Permit does not replace or satisfy
new or expanded discharges which adversely affect
Historic Places or affecting known or discovered
f discharges to prohibited outstanding resource
Only the permittee's small MS4 and the portions
control are authorized by the General Permit.
by the
by the
activities requiring
requirements;
any environmental
116D), or the
any review requirements
or contribute
habitat;
any review requirements
properties
archeological
value waters
of the storm
[Minn. R. 7090]
General Permit:
permittee in item 3.2;
a separate NPDES/SDS
review requirements,
National Environmental Policy
for endangered
to adverse impacts on a
for historic places
listed or eligible for listing
sites; and
pursuant to Minn. R. 7050.0335,
sewer system that are under
permit. The General Permit
including those under the
Act (42 U.S.C. 4321 et seq.);
or threatened species, from
listed endangered or threatened
or archeological sites, from
in the National Register of
subp. 3.
the permittee's operational
5.1
Permit Authorization.
[Minn. R. 7001]
5.2
The applicant must submit a complete application in accordance with
to discharge stormwater from a small MS4 under the General Permit.
Sections 9 through
[Minn. R. 7001]
12 in order to obtain authorization
5.3
The Commissioner
the following:
a if an
application
b. if an
coverage
reviews the General Permit application for completeness.
application is determined to be incomplete, the Commissioner
is incomplete, and request that the applicant resubmit
application is determined to be complete the Commissioner
under the General Permit should be issued or denied
After review, the
will notify the applicant
the application; or
will make a preliminary determination
in accordance with Minn. R. 7001.
Commissioner
in writing,
will
indicate
as to
[Minn. R. 7001]
do one of
why the
whether
5.4
The Commissioner
coverage
provides a public
under the General Permit.
notice with the
[Minn. R. 7001]
opportunity for a hearing on the preliminary determination to issue
5.5
Upon receipt
to discharge
of written notification of final approval of the application from the Commissioner, the applicant
stormwater from the small MS4 under the terms and conditions of the General Permit.
is authorized
[Minn. R. 7001]
Coverage issued. September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 4 of 28
6.1
Transfer of Ownership
or Control.
[Minn. R. 7001, Minn. R. 7090.0080]
6.2
Where the ownership
accordance with
Sections 9 through
or
Sections
12.
significant operational
9 through 12,
[Minn. R. 7090]
control of the small MS4 changes after the submittal of an application in
the new owner/operator must submit a new application in accordance with
7.1
Issuance of Individual Permits.
[Minn R. 7001]
7.2
The permit
discharge
applicant may request an individual permit
stormwater associated with a small MS4.
in accordance with Minn.
[Minn. R. 7001.0210, subp.
6]
R. 7001.0210, subp. 6, for authorization to
7.3
The Commissioner may require an individual
accordance with Minn R. 7001.0210, subp.
permit
6
for the permit applicant
[Minn R. 7001.0210, subp.
6]
or permittee covered by a general permit,
in
8.1
Rights and Responsibilities.
[Minn. R. 7001, Minn. R. 7090]
8.2
The Commissioner may modify the
more stringent effluent limitations
Measures of the General Permit, or
such modifications are needed to
General Permit
or permit requirements
both. These
protect water quality.
or
modifications
issue
other permits,
that modify
may be based
[Minn. R. 7001]
in accordance with Minn. R. 7001, to include
or are in addition to the Minimum Control
on the Commissioner's determination that
8.3
The
Minn.
requirements
Commissioner may designate
R. 7090. The owner/operator
by the dates specified
additional small MS4s for coverage under
of a small MS4 that is designated for coverage
in the Commissioner's determination.
the General Permit
must comply
[Minn. R. 7090]
in accordance with
with the permit
9.1
Application
for Reissuance.
[Minn. R. 7001]
9.2
If
application
an
existing permittee
for
desires
permit reissuance:
to continue permit coverage
Due by 180 days
prior to
beyond the
permit expiration.
expiration
date, the permittee
[Minn. R. 7001 0040, subp.
must
3]
submit an
10.1
New Permittee Applicants.
[Minn. R. 7090]
10.2
To become a new permittee authorized
small MS4 must submit an application,
Table 3 and the following requirements:
a. submit Part 1 of the permit application
b. submit Part 2 of the permit application,
in accordance with Section 12.
to discharge
on a form
(includes
also
[Minn. R. 7090]
stormwater under the General Permit, the owner/operator of a
provided by the Agency, in accordance with the schedule in Appendix B,
the permit application fee); and
known as the Stormwater Pollution Prevention Program (SWPPP) document,
11.1
Existing
Permittee Applicants.
[Minn. R. 7090]
11.2
All existing
date of the
Existing
of the Agency's
permittees seeking
General Permit
permittees were required
small MS4
to continue
must submit
general
discharging stormwater associated
Part 2 of the permit application:
to submit Part 1 of the permit application
permit No.MNR040000, effective August
with a
Due by 150
prior to
1, 2013.
small MS4 after
days after permit
the expiration
[Minn. R. 7090]
the issuance
issuance.
date (July 31, 2018)
12.1
Stormwater Pollution Prevention Program
(SWPPP)
Document.
[Minn R 7090]
12.2
All
General
Agency
become
applicant's
applicants must submit a SWPPP Document (i.e., Part 2 of
Permit. The SWPPP Document will become an enforceable
Modifications to the SWPPP Document that are required
enforceable provisions. The applicant must submit the
SWPPP Document must include items 12.3 through
the permit application)
part of
or allowed
SWPPP Document
12.11, as applicable.
the General
by the
on
when seeking
Permit upon
General Permit
a form provided
[Minn. R 7090]
coverage under the
approval by the
(see Section 24) will also
by the Agency. The
12.3
The applicant must provide a description of
entered in order to satisfy one or more requirements
partnerships with another regulated
of the General Permit.
small MS4(s),
[Minn. R. 7090]
into which the applicant has
12.4
The applicant must provide a description of each program the applicant has developed and implemented to satisfy the
Minimum Control Measure (MCM) requirements, including•
a. the Best Management Practices (BMPs) the applicant has implemented for each MCM at the time of application;
b. the status of each required component of the program; and
c. name(s) of individual(s) or position titles responsible for implementing and/or coordinating each component of the
program.
Coverage issued September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 5 of 28
If the program has
meet new requirements
permit requirements
or Table 3 (new
not
permittee
been
of the
in accordance
applicants).
developed
General
with
at the time of
Permit (e.g., existing
the schedule
[Minn. R. 7090]
application (e.g., new permittee applicants), or revised to
permittee applicants); the applicant must satisfy the
in Appendix B, Table 2 (existing permittee applicants)
12.5
The applicant must
time of application.
satisfy the permit
or Table 3 (new
indicate
For each
requirements
permittee applicants).
whether
each
requirement
in accordance
storm sewer
of Section 14
with the
[Minn. R. 7090]
system map requirement of Section 14 is satisfied at the
that is not satisfied at the time of application, the applicant must
schedule in Appendix B Table 2 (existing permittee applicants),
12.6
The applicant must
and enforced to
following information:
a. the type(s) of
the requirements;
b. the status of each
c. if available, a
If the regulatory
or revised to meet
satisfy the permit
or Table 3 (new
provide
satisfy the requirements
regulatory
required
website address
mechanism(s)
new requirements
requirements
permittee applicants).
a
mechanism(s)
description
component
to the
have not
of
in accordance
of existing regulatory
of Sections 18,
the applicant
of the regulatory
regulatory mechanism(s).
been developed
the General Permit
with the
[Minn. R. 7090]
mechanism(s) the applicant has developed, implemented,
19, and 20 At a minimum, the applicant must provide the
has in place at the time of application that will be used to satisfy
mechanism(s); and
at the time of application (e.g., new permittee applicants),
(e.g. existing permittee applicants); the applicant must
schedule in Appendix B, Table 2 (existing permittee applicants),
12,7
The applicant must
and implemented
ERPs (e.g., new
satisfy the permit
or Table 3 (new
provide
that satisfy
permittee applicants),
requirements
permittee applicants).
a
description
the ERP requirements
in accordance
of existing enforcement
of
or existing ERPs
with the
[Minn. R. 7090]
response procedures (ERPs) the applicant has developed
items 18.14, 19.12, and 20.19. If the applicant has not yet developed
must be updated to satisfy new requirements, the applicant must
schedule in Appendix B, Table 2 (existing permittee applicants),
12.8
The applicant must
oxygen demand,
schedule to include
a. proposed BMPs
b. the year each
c. a target year
d. if the applicant
be achieved during
Agency -approved
Urban Catchment
Standards (MIDS)
that receives Agency
the
submit
nitrate,
multiple
or progress
BMP
applicable
has
the
methods
Model",
calculator",
-approval.
is
an
permit
a compliance
total suspended
WLAs.
toward
expected
WLA(s)
applicable
term
include
"Source
"Minnesota
schedule
solids
The applicant
implementation
to be implemented;
will be achieved;
WLA for TSS
and the Agency
'Program for
Loading and
Pollution
[Minn. R. 7090]
for each applicable Waste Load Allocation (WLA) not being met for
(TSS), and total phosphorus (TP). The applicant may develop a compliance
s compliance schedule must include the following information:
of BMPs to be achieved during the permit term;
and
or TP, a cumulative estimate of TSS and TP load reductions (in pounds) to
-approved method used to determine the estimate.
Predicting Polluting Particle Passage thru Pits, Puddles, and Ponds (P8)
Management Model for Windows (WinSLAMM)", "Minimal Impact Design
Control Agency (MPCA) simple estimator tool", or any other method
12.9
For each applicable
applicant must provide
requirements of
a. the BMPs the
b. the status of
c. name(s) of individuals)
If the required components
or revised to meet
satisfy the permit
or Table 3 (new
WLA where
a description
items 22.3
applicant has
each required
or
new requirements
requirements
permittee applicants).
through
have
a reduction
of
22.7,
implemented
component;
position titles
not been
of
in accordance
in pollutant
any existing BMPs
including:
for each required
and
responsible
developed
the General Permit
with the
[Minn. R. 7090]
loading
the applicant
component
for implementing
at the time
(e.g.,
schedule
is
required for bacteria, chloride, and temperature, the
has developed and implemented to satisfy the
at the time of application;
and/or coordinating each required component.
of application (e.g., new permittee applicants),
existing permittee applicants); the applicant must
in Appendix B, Table 2 (existing permittee applicants),
Coverage issued September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 6 of 28
12.10
If
the applicant
demand nitrate,
At a minimum,
a. a list of all structural
BMP type (e.g.,
and year implemented;
b. documentation
oxygen demand
TMDL report, if
c documentation
[Minn. R. 7090]
is claiming to meet
TSS, or TP, the applicant
the applicant must
stormwater
constructed basin,
and
using an Agency
(or its surrogate
that information
using an Agency
an applicable WLA where a reduction
must provide documentation to
provide the following information:
BMPs implemented to achieve the applicable
infiltrator filter, swale or strip, etc.), location
-approved method which demonstrates
pollutants), nitrate, TSS, or TP from BMPs
is available (e g., percent reduction or pounds
-approved method, which demonstrates
in pollutant loading is required for oxygen
demonstrate the applicable WLA is being
WLA, including the
in geographic coordinates, owner,
the estimated reductions of
meet the MS4 WLA reductions included
reduced); or
the applicant's existing load meets the WLA.
met.
in the
12.11
For the requirements
submit the following
a location of the
b. name(s) of the
c. information
Agency;
d indicate if the
e if applicable,
application, the
Table 2 (existing
described
for
applicant
of Section
information:
system in geographic
individual(s)
in item
system complies
each requirement
must
permittee applicants)
23, alum or ferric chloride
coordinates;
or position titles responsible
23.11, if the system is constructed
with the requirements
in Section 23 that
bring the system into compliance
or Table 3 (new
phosphorus
for the operation
in Section
the applicant's
in
permittee applicants).
at
23;
accordance
treatment
of
the time
and
system
systems, if
the system,
the applicant submits
does not comply
with the schedule
[Minn. R. 7090]
applicable, the applicant must
the application to the
with at the time of
in Appendix B,
13.1
Stormwater Pollution Prevention Program
(SWPPP).
[Minn. R. 7090]
13.2
The permittee must
small MS4 to the Maximum
urbanized area as defined
develop, implement,
the General Permit.
develop, implement,
Extent
by the United
and enforce a
[Minn. R. 7090]
and enforce a SWPPP designed to reduce the discharge of pollutants from the
Practicable (MEP) and to protect water quality. Existing permittees regulated within the
States Census Bureau, the applicable urbanized area for which the permittee must
SWPPP can be based on the most recent decennial census of 2010 for the duration of
13.3
If the
responsibility
permittee enters
for compliance
into a partnership for purposes
with the General Permit.
of meeting SWPPP
[Minn. R. 7090]
requirements, the permittee maintains legal
13.4
Existing
that
Appendix
in Appendix
permittees must revise
was effective August 1,
B Table 2. New permittees
B, Table 3. The
their SWPPP developed under the Agency's small
2013, to meet the requirements of the General Permit
must develop, implement, and enforce their
permittee's SWPPP must consist of Sections 14 through
MS4 general
in accordance
SWPPP in
23, as applicable.
permit
with
accordance
No.MNR040000
the schedule in
with the schedule
[Minn. R. 7090]
14.1
Mapping.
[Minn. R. 7090]
14.2
New permittees
the following:
a. the permittee's
flow direction
b. outfalls, including
coordinates;
c. structural stormwater
d. all receiving
must develop,
entire
in those
a unique
waters.
and existing
MS4 as a goal,
pipes;
identification
BMPs that are
[Minn. R. 7090]
permittees must update,
but at a minimum, all pipes
(ID) number assigned
part of the permittee's
as necessary, a storm sewer system map that depicts
12 inches or greater in diameter, including stormwater
by the permittee, and an associated geographic
MS4; and
15.1
Minimum Control Measures (MCMs).
[Minn. R. 7090.1040]
15.2
The
permittee must incorporate
the following
six MCMs into the SWPPP.
[Minn. R. 7090.1040]
16.1
MCM 1: Public Education and Outreach.
[Minn. R. 7090]
16.2
New
continue
the
permittees must
to implement
public of the impact
develop and implement,
a public education program
stormwater discharges
and exist
to distribute
have on
ng permittees must revise
educational materials
waterbodies and that includes
their current program, as necessary, and
or equivalent outreach that informs
actions citizens, businesses, and
Coverage issued. September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 7 of 28
other local organizations
materials if they
educational materials
organizations,
Section 16 requirements
can take to
are appropriate for
The permittee
or other groups to implement'ts
into their
reduce
the
may
program.
the
message
partner
discharge of
the permittee
with other
education and
[Minn. R. 7090]
pollutants to stormwater. The permittee may use existing
chooses to deliver, or the permittee may develop its own
MS4 permittees, community groups, watershed management
outreach program. The permittee must incorporate
16.3
During
two (2)
targets,
associations,
through
the permit
specifically
changing
household
16.6.
term, the permittee
selected stormwater-related
local business
chemicals,
[Minn. R. 7090]
must distribute educational materials or equivalent outreach focused on at least
issues of high priority to the permittee (e.g., specific TMDL reduction
practices, promoting adoption of residential BMPs, lake improvements through lake
yard waste, etc.). The topics must be different from those described in items 16.4
16.4
At least once
illicit discharge
each calendar
recognition
year, the
and reporting
permittee
must distribute
illicit discharges
educational
to the
permittee.
materials or equivalent
[Minn. R. 7090]
outreach focused on
16.5
For
equivalent
a.
b.
c.
cities
impacts
methods
proper
and townships,
outreach
of deicing
to
storage
at least once each
to residents, businesses,
salt use on receiving
reduce deicing salt use and
of salt or other deicing
calendar
commercial
waters;
materials.
year, the permittee
facilities,
[Minn. R. 7090]
must distribute educational materials or
and institutions, focused on the following*
16.6
For cities and
equivalent outreach
the following:
a. impacts of
b. proper management
c. any existing
townships,
pet
at least once each calendar year,
focused on pet waste The educational
waste on receiving waters;
of pet waste; and
permittee regulatory mechanism(s) for
the permittee
materials
pet waste.
must distribute
or equivalent
[Minn. R 7090]
educational materials or
outreach must include information on
16.7
The permittee
a. target audience(s)
should be given
identify these
b name or
c specific activities
d a description
other entities,
must
to
areas
position
of
if applicable.
low-income
any
and
develop
(e.g., residents
is available
title of responsible
schedules
coordination
and implement
businesses,
residents, people
on the Agency's
person(s)
to reach
with and/or
[Minn. R. 7090]
an education and outreach plan that consists of the following:
commercial facilities, institutions, and local organizations; consideration
of color, and non-native English speaking residents. A resource to help
environmental justice website);
for overall plan implementation;
each target audience; and
use of stormwater education and outreach programs implemented by
16.8
The permittee must
a. a description of
b. all information
c. activities held, including
d. quantities and
e. estimated audience
outreach activity.
document the
all specific stormwater-related
required under
dates,
descriptions of
(e.g., number
[Minn. R. 7090]
following information:
issues identified by the permittee
the permittee's education and outreach plan in item
to reach each target audience*
educational materials distributed, including dates distributed;
of participants, viewers readers, listeners, etc.)
in item 16.3;
16.7;
and
for each completed education and
16.9
The permittee
status of achieving
Measurable requirements
and outreach
completion of
assessment.
must conduct
the measurable
are
efforts, implementation
each annual report
[Minn. R. 7090]
an annual assessment
requirements
activities that must
of written plans
and document
of the public education program to evaluate program compliance, the
in Section 16 and determine how the program might be improved.
be documented or tracked as applicable to the MCM (e.g., education
etc.). The permittee must perform the annual assessment prior to
any modifications made to the program as a result of the annual
17.1
MCM 2: Public Participation/Involvement.
[Minn. R. 7090]
17.2
New permittees
continue
public
must develop and
to implement a Public Participation/Involvement
in activities that improve or
implement and
protect water quality.
existing permittees
program
The
must revise
to solicit public
permittee must incorporate
their current program,
input on the SWPPP
Section 17 requirements
as necessary, and
and involve the
into
Coverage issued. September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 8 of 28
their
program.
[Minn. R. 7090]
17.3
Each calendar
adequacy
local public
SWPPP.
year, the
of the SWPPP
notice requirements
[Minn. R. 7090]
permittee must provide a minimum of one (1) opportunity for the public to provide input on the
The permittee may conduct a public meeting(s) to satisfy this requirement, provided appropriate
are followed and the public is given the opportunity to review and comment on the
17.4
The permittee must provide access to the SWPPP Document, annual reports,
describes the SWPPP (e.g., regulatory mechanism(s), etc.) for public review,
subject to the Minnesota Government Data Practices Act Minn. Stat. 13.
and other documentation
upon request.
[Minn. Stat 13]
that supports or
All public data requests are
17.5
The permittee
[Minn. R. 7090]
must consider oral and written input regarding the SWPPP submitted by the public to the permittee.
17.6
Each
prevention
stenciling,
etc.).
calendar year, the
or water
volunteer
[Minn. R. 7090]
permittee must provide a minimum of one (1) public involvement activity that includes a pollution
quality theme (e.g., rain barrel distribution event, rain garden workshop, cleanup event storm drain
water quality monitoring, adopt a storm drain program, household hazardous waste collection day,
17.7
The
a. all
b. all
SWPPP
c. date(s),
d. notices
(e.g.,
e. date(s),
compliance
permittee must document
relevant written input
responses from the permittee
as a result of the written
location(s), and estimated
provided to the public
website, e-mail distribution
location(s), description
with item 17.6.
the following
submitted by persons
to written
input received;
number
of any events
lists, notices,
of activities,
[Minn. R. 7090]
information:
regarding the SWPPP;
input received regarding the SWPPP, including any modifications made to the
of participants at events held for purposes of compliance with item 17.3;
scheduled to meet item 17.3, including any electronic correspondence
etc.); and
and estimated number of participants at events held for the purpose of
17.8
The permittee
program compliance,
program might
the MCM (e.g.,
to completion
assessment.
must conduct
the status
be improved.
public input
of each annual
[Minn. R. 7090]
an annual assessment of the Public Participation/Involvement program to evaluate
of achieving the measurable requirements in Section 17, and determine how the
Measurable requirements are activities that must be documented or tracked as applicable to
and involvement opportunities, etc.). The permittee must perform the annual assessment prior
report and document any modifications made to the program as a result of the annual
18.1
MCM 3: Illicit Discharge
Detection and Elimination
(IDDE).
[Minn. R. 7090]
18.2
New permittees must develop, implement,
necessary, and continue to implement and
permittee must incorporate Section 18 requirements
and enforce, and existing
enforce, a program to
into their
detect
program.
permittees
and
must revise
eliminate illicit
[Minn. R. 7090]
their current program as
discharges into the MS4. The
18.3
The
permittee must maintain a map
of the
permittee's MS4, as required
in Section 14.
[Minn. R. 7090]
18.4
To the extent allowable
mechanism(s) that
authorized in item
an ordinance, permits,
be enforced by
[Minn. R. 7090]
under state or local law, the permittee must develop, implement, and enforce a regulatory
prohibits non-stormwater discharges into the permittee's MS4 except those non-stormwater discharges
3.2. A regulatory mechanism(s) for the purposes of the General Permit may consist of contract language,
standards, written policies, operational plans, legal agreements, or any other mechanism, that will
the permittee. The regulatory mechanism(s) must also include items 18.5 and 18.6, as applicable.
18.5
For cities, townships,
remove and
properly
and
dispose
counties, the permittee's
of feces on
regulatory mechanism(s)
permittee owned land areas.
must require
[Minn. R. 7090]
owners or custodians of pets to
18.6
For
institutional,
following:
a.
b.
c. implementation
(e.g.,
cities and
designated
designated
sweeping,
and
townships, the permittee's regulatory
non-NPDES permitted industrial
salt storage areas must be covered
salt storage areas must be located on
of practices to reduce exposure
diversions, and/or containment).
mechanism(s)
facilities. At a
or indoors;
an impervious
when transferring
[Minn. R. 7090]
must require proper salt storage at commercial,
minimum, the regulatory mechanism(s) must require the
surface, and
material in designated salt storage areas
Coverage issued September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 9 of 28
18.7
The permittee
items 21.9, 21.10,
conditions (e.g.
must
incorporate illicit discharge detection
and 21.11. Where feasible, the permittee
periods of 72 or more hours of no
precipitation).
into all
must
inspection and
conduct illicit discharge
[Minn. R. 7090]
maintenance activities conducted
inspections during dry -weather
in
18.8
At least once each calendar
which could cause illicit discharges),
limited to, police, fire department,
not limited to videos, in-person
year,
the permittee must train all field
and reporting illicit discharges
public works, and parks staff.
presentations, webinars training
staff
for further
Training
documents,
in illicit discharge recognition
investigation. Field
for this specific requirement
and/or emails.
(including
staff includes,
may include,
[Minn. R. 7090]
conditions
but
but
is not
is
18.9
The permittee must
permittee's IDDE
eliminating illicit
refresher -training
ensure that individuals receive
program. Individuals includes,
discharges and/or enforcement.
every three (3) calendar years
training
but is not
The permittee
following
commensurate
limited to, individuals
must ensure
the initial training.
with
their responsibilities
responsible for
that previously
[Minn. R. 7090]
as they relate to the
investigating, locating,
trained individuals attend a
18.10
The permittee must
likelihood for illicit
inventory:
a. land uses associated
b. areas where illicit
c. areas with storage
maintain a written or mapped inventory of priority areas the
discharges. At a minimum, the permittee must evaluate the
with business/industrial activities;
discharges have been identified in the past; and
of significant materials that could result in an illicit discharge.
permittee
following
identifies
for potential
[Minn. R. 7090]
as having
inclusion
a higher
in the
18.11
To the extent allowable
identified in item 18.10.
under state or local
[Minn. R. 7090]
law, the permittee must conduct additional illicit discharge inspections in areas
18.12
The permittee
discharges. At a
a. a timeframe
b. use of visual
c. tools available
analyzing water
d. cleanup methods
e. name or position
[Minn. R. 7090]
must implement written procedures for investigating, locating, and eliminating the source of illicit
minimum, the written procedures must include:
in which the permittee will investigate a reported illicit discharge;
inspections to detect and track the source of an illicit discharge;
to the permittee to investigate and locate an illicit discharge (e.g., mobile cameras, collecting and
samples, smoke testing, dye testing etc.);
available to the permittee to remove an illicit discharge or spill; and
title of responsible person(s) for investigating, locating, and eliminating an illicit discharge.
18.13
The permittee must implement
prevent spills from entering
Minnesota Department
of the illicit discharge
of
is a spill
written procedures for responding to spills,
the MS4. The written procedures must also
Public Safety Duty Officer at 800-422-0798 (toll
or leak as defined in Minn. Stat. 115.061.
including emergency
include the immediate
free) or 651-649-5451
[Minn. R. 7090]
response procedures to
notification of the
(Metro area), if the source
18.14
The permittee
regulatory
a. a description
b. timeframes
c. name or
must maintain
mechanism(s) in Section
of enforcement
to complete corrective
position title of responsible
written enforcement
18.
tools available
actions;
response procedures
At a minimum, the written
to the permittee
and
person(s) for conducting
(ERPs)
ERPs must include:
and guidelines
enforcement.
to compel compliance
for the use of
[Minn. R. 7090]
with the permittee's
each tool;
18.15
The permittee must document
a. date(s) and location(s)
b. reports of alleged illicit
permittee;
c. date(s) of discovery of
d. identification of outfalls
e. sources (including a description
f. action(s) taken by the
the following
of IDDE inspections
discharges received,
all illicit discharges;
or other areas,
and the responsible
permittee, including
information:
conducted in accordance with items 18.7 and
including date(s) of the report(s), and any
where illicit discharges have been discovered;
party) of illicit discharges (if known);
date(s), to address discovered illicit discharges.
18.11;
follow-up
and
action(s)
[Minn. R. 7090]
taken by the
18.16
For each training in item 18.8 and 18.9, the permittee must document:
Coverage issued September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 10 of 28
a. general subject matter
b. names and departments
c. date of each event.
covered;
of individuals
[Minn. R. 7090]
in attendance; and
18.17
The permittee must document
At a minimum, the permittee must
a. name of the person responsible
b. date(s) and location(s) of the
c. description of the violation(s);
d. corrective action(s) (including
e. referrals to other regulatory
f. date(s) violation(s) resolved.
any enforcement
document
for violating
observed violation(s);
completion schedule)
organizations (if
[Minn. R. 7090]
conducted pursuant to the ERPs
the following:
the terms and conditions of the permittee's
issued by the permittee;
any); and
in item 18.14, including verbal warnings.
regulatory mechanism(s);
18.18
The
achieving
requirements
inspections,
report
permittee must conduct an annual assessment
the measurable requirements
are activities that must be
enforcement, etc.). The permittee
and document any modifications
of
in Section 18
documented
must
made to the
the
and
or
perform
program
IDDE program to evaluate program compliance,
determine how the program might be improved.
tracked as applicable to the MCM (e.g., trainings,
the annual assessment prior to completion
as a result of the annual assessment
the status
Measurable
inventory,
of each annual
[Minn. R. 7090]
of
19.1
MCM 4: Construction Site Stormwater Runoff Control.
[Minn. R. 7090]
19.2
New permittees
necessary, and
must address construction
one acre that are
discharge to the
[Minn. R. 7090]
must develop, implement, and enforce, and existing permittees must revise their current program, as
continue to implement and enforce, a Construction Site Stormwater Runoff Control program. The program
activity with a land disturbance of greater than or equal to one acre, including projects less than
part of a larger common plan of development or sale, within the permittee's jurisdiction and that
permittee s MS4. The permittee must incorporate Section 19 requirements into their program.
19.3
To the extent
mechanism(s)
Agency's most
regulatory
standards,
permittee.
allowable under
that establishes
current Construction
mechanism(s) for
written policies,
[Minn. R. 7090]
state or local law, the permittee must develop, implement, and enforce a regulatory
requirements for erosion, sediment, and waste controls that is at least as stringent as the
Stormwater General Permit (MNR100001), herein referred to as the CSW Permit. A
the purposes of the General Permit may consist of contract language an ordinance, permits,
operational plans, legal agreements, or any other mechanism, that will be enforced by the
19.4
When the CSW Permit is reissued, the
of the issuance date of that permit, to
controls described in the CSW Permit.
permittee must
be at least as stringent
[Minn. R. 7090]
revise their regulatory mechanism(s), if necessary, within 12 months
as the requirements for erosion, sediment, and waste
19.5
The permittee's regulatory
plans that must be submitted
have been met, prior to the
operators of construction activity
mechanism(s) must require
as stringent as described in
a. erosion prevention practices;
b. sediment control practices;
c. dewatering and basin draining;
d. inspection and maintenance;
e. pollution prevention management
f. temporary sediment bas.ns;
g. termination conditions.
mechanism(s)
to the permittee
start of construction
to keep
that site plans
the CSW Permit.
measures;
and
[Minn. R. 7090]
must require that owners and operators of construction activity develop site
for review and confirmation that regulatory mechanism(s) requirements
activity. The regulatory mechanism(s) must require the owners and
site plans up-to-date with regard to stormwater runoff controls. The regulatory
incorporate the following erosion, sediment, and waste controls that are at least
19.6
The permittee must implement written
construction activity to ensure compliance
procedures must include:
a. written notification to owners and operators
procedures
with
requirements
proposing
for site
plan reviews conducted by the
of the regulatory mechanism(s).
construction activity, including
permittee prior
At a minimum,
projects less than
to the start of all
the
one acre that
Coverage issued. September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 11 of 28
are part of a
CSW Permit;
b. use of a written
of each site
larger common
and
checklist,
plan required
plan of development
consistent
in item 19.5.
or sale,
with the requirements
[Minn R. 7090]
of the need to apply for and obtain coverage under the
of the regulatory mechanism(s), to document the adequacy
19.7
The
determine
requirements
permittee must implement an inspection
compliance with the permittee's
in items 19.8 and 19.9.
program
regulatory
[Minn. R. 7090]
that includes written procedures for conducting site inspections, to
mechanism(s). The inspection program must also meet the
19.8
The permittee must maintain written
minimum, the written procedures
a. a detailed explanation describing
b. a frequency at which the permittee
c. a frequency at which the permittee
d. the name(s) of individual(s) or
procedures for
must include:
how sites will be
will conduct inspections
will conduct inspections
position title(s) responsible
identifying high-priority
categorized as either
for high-priority
for low -priority
for conducting
and low
high-priority
sites;
sites;
site inspections
-priority
or low
and
sites for inspection.
-priority;
[Minn. R. 7090]
At a
19.9
following
1.
j.
The permittee
permittee's
a. stabilization
b. stabilization
c. sediment
d. storm
e. energy
f. vehicle
g. preservation
within 50
h. owner/operator
containment
oils curing
BMPs
must implement a written
regulatory mechanism(s).
areas, as applicable to each
of exposed soils (including
of ditch and swale bottoms
control BMPs on all down
drain inlet protection•
dissipation at pipe outlets;
tracking BMPs•
of a 50 foot natural
feet of disturbed soils;
of construction activity
for all liquid and solid
compounds and other construction
maintained and functional
checklist
At a minimum,
site:
stockpiles);
gradient perimeters
buffer or redundant
self -inspection
wastes generated
materials);
[Minn. R. 7090]
to document each site inspection when determining compliance with the
the checklist must include the permittee's inspection findings on the
of the project and up gradient of buffer zones;
sediment controls where stormwater flows to a surface water
records;
by washout operations (e.g., concrete, stucco, paint, form release
and
19.10
The permittee must implement written procedures for receipt and consideration
stormwater related information on construction activity submitted by the
of reports
public to the
of noncompliance
permittee.
or
[Minn R. 7090]
other
19.11
The permittee
permittee's Construction
responsible for
previously trained
[Minn. R 7090]
must ensure that individuals receive training commensurate with their responsibilities as they relate to the
Site Stormwater Runoff Control program. Individuals includes, but is not limited to, individuals
conducting site plan reviews, site inspections, and/or enforcement. The permittee must ensure that
individuals attend a refresher -training every three (3) calendar years following the initial training.
19.12
The permittee
regulatory
a. a description
b. name or
must maintain
mechanism(s) in item
of enforcement
position title of responsible
written enforcement
19.3. At
tools available
response procedures
a minimum, the written
to the permittee
person(s) for conducting
(ERPs)
ERPs must include:
and guidelines
enforcement.
to compel compliance
for the use of
[Minn. R. 7090]
with the permittee's
each tool; and
19.13
For each site
a. project name;
b. location;
c. total acreage
d. owner and
e. proof of
CSW Permit;
f any stormwater
determine
plan
operator
notification
and
project
review
to be
related
approval
conducted by
disturbed;
of the proposed
to obtain coverage
comments and
or denial.
the permittee,
construction
under the
supporting
[Minn. R. 7090]
the permittee must document the following:
activity;
CSW Permit, as required in item 19.6, or proof of coverage under the
completed checklist, as required in item 19.6, used by the permittee to
Coverage issued September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 12 of 28
19.14
For each training
a. general subject
b. names and departments
c. date of each event.
in item
matter
19.11, the permittee
covered;
of individuals
[Minn. R. 7090]
must document:
in attendance; and
19.15
The permittee must document
At a minimum, the permittee must
a. name of the person responsible
b. date(s) and location(s) of the
c. description of the violation(s);
d. corrective action(s) (including
e. referrals to other regulatory
f. date(s) violation(s) resolved.
any enforcement
document
for violating
observed violation(s);
completion schedule)
organizations (if
[Minn. R. 7090]
conducted pursuant to the ERPs in item 19.12, including verbal warnings.
the following:
the terms and conditions of the permittee's regulatory mechanism(s);
issued by the permittee;
any); and
19.16
The permittee must conduct an annual
evaluate program compliance, the
program might be improved. Measurable
the MCM (e.g., inventory, trainings,
annual assessment prior to completion
result of the annual assessment
assessment
status of achieving
requirements
site plan reviews,
of each annual
[Minn. R. 7090]
of the Construction Site Stormwater Runoff Control program to
the measurable requirements in Section 19, and determine how the
are activities that must be documented or tracked as applicable to
inspections, enforcement etc.). The permittee must perform the
report and document any modifications made to the program as a
20.1
MCM 5 Post -Construction Stormwater Management.
[Minn. R. 7090]
20.2
New permittees
necessary,
or reduces
land disturbance
plan of development
must incorporate
must develop, implement,
and continue to implement
water pollution after
of greater than
or sale, within
Section 20 requirements
and enforce,
and enforce, a
construction activity
or equal to one acre,
the permittee's jurisdiction
into their
Post
is completed.
including
program.
and existing
-Construction
permittees
Stormwater
The program
projects less than
and that discharge
[Minn R. 7090]
must revise their current program, as
Management program that prevents
must address construction activity with
one acre that are part of a larger common
to the permittee's MS4 The permittee
20.3
To
mechanism(s)
Permit
agreements,
the extent allowable under state or local law, the permittee must
that incorporates items 20.4 through 20.15. A regulatory
may consist of contract language, an ordinance, permits, standards,
or any other mechanism, that will be enforced by the
develop,
mechanism(s)
written
permittee.
implement, and
for the
policies, operational
[Minn. R. 7090]
enforce a regulatory
purposes of the General
plans, legal
20.4
The
post
review
[Minn.
permittee's
-construction
and confirmation
R. 7090]
regulatory mechanism(s) must require owners of construction activity to submit site plans with
stormwater management BMPs designed with accepted engineering practices to the permittee for
that regulatory mechanism(s) requirements have been met, prior to start of construction activity.
20.5
The permittee's
any project
more acres.
regulatory
where the sum
[Minn. R. 7090]
mechanism(s) must
of the new impervious
require
surface
owners of construction activity to treat the water quality volume on
and the fully reconstructed impervious surface equals one or
20.6
For construction activity (excluding linear projects)
sum of the new and the fully reconstructed
impervious
the water quality
surface
volume must
[Minn. R. 7090]
be calculated as one (1) inch times the
20.7
For linear projects the water
surface or one-half (0.5) inch
water quality volume cannot
right-of-way, easement, or
Volume reduction practices
required if the practices cannot
cannot be obtained owners
discharge from the MS4.
quality volume
times the sum
be treated
other permission
must be considered
be provided
of construction
[Minn. R. 7090]
must be calculated as the larger of one (1) inch times the new impervious
of the new and the fully reconstructed impervious surface Where the entire
within the existing right-of-way, a reasonable attempt to obtain additional
to treat the stormwater during the project planning process must be made.
first, as described in item 20.8. Volume reduction practices are not
cost effectively. If additional right-of-way easements, or other permission
activity must maximize the treatment of the water quality volume prior to
20.8
Volume reduction practices (e.g., infiltration or other)
when designing the permanent stormwater treatment
basins and filtration systems to be volume reduction
to retain the water quality volume
system. The General Permit does
practices. If the General Permit
on-site must be considered first
not consider wet sedimentation
prohibits infiltration as described in
Coverage issued September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 13 of 28
item
20.9, other
[Minn. R. 7090]
volume reduction practices, a wet sedimentation basin, or filtration basin may be considered.
20.9
Infiltration
j.
a. that
reconstructed
b. where
determination
checklist,
be retained
c. where
8.3 inches
d. with
seasonally
e. of predominately
f. in an
Minn. R.
Health•
g. in an
of engineering
h outside
a higher
groundwater
1. within
that receive
salvage
transportation
See "higher
systems must
receive discharges
impervious
high levels of
the owners
which is available
with the site
soil infiltration
per hour;
less than three
saturated soils
Hydrologic
Emergency Response
4720.5100, subp.
ERA within a DWSMA
review
of an ERA within
level of engineering
1,000 feet up -gradient
stormwater
yards; scrap recycling
facilities
level of engineering
be prohibited
from
surface•
contaminants
and/or
in the
plans;
rates are
(3) feet
or the
Area
13,
classified
sufficient
a DWSMA
review
runoff
and
that conduct
when the system would be constructed
vehicle fueling and maintenance areas, regardless
in soil or groundwater may be mobilized by
operators of construction activity must complete
Minnesota Stormwater Manual, or conduct their
more than 8.3 inches per hour unless soils are
of separation distance from the bottom of the infiltration
top of bedrock;
Soil Group D (clay) soils;
(ERA) within a Drinking Water Supply Management
classified as high or very high vulnerability as defined
as moderate vulnerability unless the permittee
to provide a functioning treatment system and
classified as high or very high vulnerability
sufficient to provide a functioning treatment
or 100 feet down gradient of active karst features;
from these types of entities regulated under NPDES
waste recycling facilities; hazardous waste treatment,
deicing activities.
review" in the Minnesota Stormwater Manual for
in areas:
of the amount of new
the infiltrating stormwater.
the Agency's site
own assessment. The
amended to slow the
system to the
Area (DWSMA)
by the Minnesota
performs or approves
to prevent adverse impacts
unless the permittee
system and to prevent
or
for industrial stormwater:
storage, or disposal
more information.
and fully
To make
screening assessment
assessment
infiltration rate
elevation of the
as defined in
Department of
a higher
to groundwater;
performs or approves
adverse impacts
automobile
facilities;
[Minn. R. 7090]
this
must
below
level
to
or air
20.10
For non-linear projects, where
construction activity, the
where off-site treatment
original construction activity,
minimum, ensure the requirements
the water quality volume
permittee must identify, or may
projects can be completed. If the
the remaining water quality
of items 20.11 through
cannot cost effectively
require owners of
entire water quality
volume must be
20.14 are met.
be treated
the construction
volume is
addressed through
[Minn. R. 7090]
on the site of the original
activity to identify, locations
not addressed on the site of the
off-site treatment and at a
20.11
The permittee must ensure off-site
a. locations that yield benefits to
b. locations within the same Department
c. locations in the next adjacent DNR
d. locations anywhere within the
treatment project areas
the same receiving water
of Natural Resource
catchment area up -stream;
permittee's jurisdiction.
are selected
that receives
(DNR)
or
[Minn. R. 7090]
catchment
in the following order of preference:
runoff from the original construction activity;
area as the original construction activity;
20.12
Off-site treatment
structural stormwater
of structural stormwater
[Minn. R. 7090]
projects must involve the creation of new structural stormwater BMPs or the retrofit of existing
BMPs or the use of a properly designed regional structural stormwater BMP. Routine maintenance
BMPs already required by the General Permit cannot be used to meet this requirement.
20.13
Off-site treatment projects must be
If the permittee determines more
reason(s) and schedule(s) for completing
completed
time is
needed
the
no
project
later
to complete
than 24 months
the treatment
in the annual report.
after
the start of
project, the
[Minn. R. 7090]
the original construction activity.
permittee must provide the
20.14
If the permittee receives
apply any such payment
items 20.11 through
payment
received
20.13.
from the
to a public
[Minn. R. 7090]
owner of a construction activity for off-site treatment, the permittee must
stormwater project, and all projects must comply with the requirements in
20.15
The permittee's regulatory mechanism(s) must include
owners of structural stormwater BMPs not owned or operated
the establishment
by the
of legal mechanism(s) between the permittee and
permittee, that have been constructed to meet the
Coverage issued September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 14 of 28
requirements in Section
a. allow the permittee
perform necessary maintenance,
the owner of that structural
b. are designed to preserve
owned or operated
c. are designed to protect/preserve
effectiveness, new, repaired,
treatment to the original
20. The
to conduct
stormwater
the
by the permittee,
or
BMP.
legal mechanism(s)
inspections
and assess costs
BMP
permittee's right
when those
structural
improved structural
[Minn. R. 7090]
must include provisions that, at a minimum:
of structural stormwater BMPs not owned or operated by the permittee,
for those structural stormwater BMPs when the permittee determines
has not ensured proper function;
to ensure maintenance responsibility, for structural stormwater BMPs not
responsibilities are legally transferred to another party; and
stormwater BMPs. If structural stormwater BMPs change, causing decreased
stormwater BMPs must be implemented to provide equivalent
20,16
The permittee must maintain a written or
permittee that meet all of the following criteria:
a. the structural stormwater BMP includes
for the long-term maintenance, as required
b. the structural stormwater BMP was implemented
mapped inventory of structural
an executed legal mechanism(s)
in item 20.15; and
on or after August
stormwater
between
1, 2013.
BMPs not
the permittee
[Minn. R. 7090]
owned or operated by the
and owners responsible
20.17
The permittee must implement written
construction activity, to ensure compliance
procedures
with requirements
for site plan reviews
of the
conducted
permittee's regulatory
by the permittee prior to
mechanism(s).
the start of
[Minn. R. 7090]
20.18
The permittee must ensure that individuals
permittee's Post -Construction Stormwater
responsible for conducting site plan reviews
individuals attend a refresher -training
receive training commensurate with
Management program. Individuals
and/or enforcement. The permittee
every three (3) calendar years following
their responsibilities
includes, but
must ensure
the initial training.
is not
that
limited
as they relate
to individuals
previously trained
[Minn. R. 7090]
to the
20.19
The permittee
regulatory
a. a description
b. name or
must maintain
mechanism(s) required
of enforcement
position title of responsible
written enforcement
in Section
tools available
response procedures
20. At a minimum,
to the permittee
person(s) for conducting
(ERPs)
the written ERPs
and guidelines
enforcement.
to compel compliance
must include:
for the use of
[Minn. R. 7090]
with the permittee's
each tool; and
20.20
For
a. supporting
calculations
b. the
the
c. documentation
the
d. payments
e. all
responsible
each site
water
total water
location
legal mechanisms
plan review conducted
documentation
for the permanent
quality volume that
quality volume
associated
of permanent stormwater
received and used
drafted
parties involved.
by the permittee,
used to determine
stormwater treatment
will be treated
required to be
with off-site treatment
treatment
in accordance
in accordance
[Minn. R. 7090]
the permittee must document the following:
compliance with Section 20 of the General Permit, including any
system;
through volume reduction practices (e.g., infiltration or other) compared to
treated;
projects authorized by the permittee, including rationale to support
projects in accordance with items 20,10 and 20.11;
with item 20 14; and
with item 20 15, including date(s) of the agreement(s) and name(s) of all
20.21
For each training
a. general subject
b. names and departments
c. date of each event.
in item
matter
20.18, the permittee
covered;
of individuals
[Minn. R. 7090]
must document:
in attendance; and
20.22
The permittee must document
At a minimum, the permittee must
a. name of the person responsible
b. date(s) and location(s) of the
c. description of the violation(s);
d. corrective action(s) (including
e. referrals to other regulatory
f. date(s) violation(s) resolved.
any enforcement
document
for violating
observed violation(s);
completion schedule)
organizations (if
[Minn. R. 7090]
conducted pursuant to the ERPs
the following:
the terms and conditions of the permittee's
issued by the permittee;
any); and
in item 20.19, including verbal warnings.
regulatory mechanism(s);
Coverage issued September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 15 of 28
20.23
The permittee must conduct
program compliance, the
might be improved. Measurable
MCM (e.g., inventory, trainings,
assessment prior to completion
the annual assessment.
an annual
status of achieving
requirements
site plan
of each
[Minn. R. 7090]
assessment of the Post -Construction Stormwater Management program to evaluate
the measurable requirements in Section 20, and determine how the program
are activities that must be documented or tracked as applicable to the
reviews, inspections, enforcement, etc.). The permittee must perform the annual
annual report and document any modifications made to the program as a result of
21.1
MCM 6: Pollution Prevention/Good Housekeeping
For Municipal
Operations.
[Minn. R. 7090]
21.2
New
continue
the
requirements
permittees must develop
to implement
MS4 from permittee
into their
an
owned/operated
program.
and
operations
implement and
and maintenance
facilities
[Minn. R. 7090]
existing permittees must revise their current program, as necessary, and
program that prevents or reduces the discharge of pollutants to
and operations The permittee must incorporate Section 21
21.3
The
pollutants
discharges
a.
b.
c.
d.
e.
f.
g.
h.
I.
.i.
k.
I.
n.
o.
p.
q.
permittee must
to stormwater
from all
composting;
equipment storage
hazardous waste
hazardous waste
landfills;
solid waste handling
parks;
pesticide storage;
public parking lots;
public golf courses;
public swimming
public works yards;
m. recycling;
salt storage,
snow storage;
vehicle storage
materials storage
maintain
discharges.
inventoried
and maintenance;
disposal;
handling
and
pools;
and maintenance
yards. [Minn.
a written or
The
facilities. Facilities
and transfer;
transfer;
(e.g.,
R. 7090]
mapped inventory of permittee owned/operated
permittee must implement BMPs that prevent
to be inventoried may include but
fueling and washing) yards; and
facilities that contribute
or reduce pollutants in stormwater
is not limited to:
21,4
.1.
The
municipal
a. waste
b. management
removal
c. vehicle
d. routine
e. emergency
f. cleaning
g. use,
h. landscaping,
i. road
right-of-way
k. application
permittee
must implement
operations that may
disposal and storage,
of temporary
piles (e.g , effective
fueling, washing, and
street and parking
response;
of maintenance equipment,
storage, and disposal
park, and lawn
maintenance, including
maintenance,
of herbicides,
BMPs that prevent
contribute pollutants
including dumpsters;
and permanent
sediment controls
maintenance;
lot sweeping;
building
of significant materials;
maintenance;
pothole repair,
including mowing;
pesticides and
or
to
stockpiles
at the
exteriors,
road shoulder
and
fertilizers.
reduce pollutants
stormwater discharges,
of materials
base of stockpiles
dumpsters,
maintenance,
[Minn. R. 7090]
such
and
in stormwater discharges from the following
where applicable:
as street sweepings, snow, sand and sediment
on the down gradient perimeter);
the disposal of associated waste and wastewater;
pavement marking, sealing, and repaving;
21.5
The permittee
a. cover
b. store
c. implement
or store
salt on
must implement the
salt indoors;
an impervious surface,
practices to reduce exposure
following BMPs at permittee
and
when transferring
owned/operated salt
material from salt storage
storage areas:
areas (e.g.,
sweeping,
diversions,
Coverage issued. September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 16 of 28
and/or containment).
[Minn. R. 7090]
21.6
The
activities
(e.g.,
permittee
for
plowing
must implement a written
the permittee. The policy
or other snow removal
snow and ice management
must establish practices
practices, sand use, and application
and
policy for individuals
procedures for
of deicing
snow
compounds).
that perform
and ice control
winter maintenance
operations
[Minn. R. 7090]
21.7
Each
receive
a.
b.
and
c. tools
Salting
The
requirement.
calendar
training
the importance
BMPs to minimize
anti -icing);
and resources
Assessment
permittee
year, the permittee
that includes:
of protecting
the use
and
to assist
Tool).
may use training
[Minn. R. 7090]
must ensure all individuals that perform winter maintenance activities for the permittee
water quality;
of deicers (e.g., proper calibration of equipment and benefits of pretreatment, pre -wetting,
in winter maintenance (e.g., deicing application rate guidelines, calibration charts, Smart
materials from the Agency's Smart Salting training or other organizations to meet this
21.8
The
all
permittee must maintain
permittee owned/operated
written
procedures for the purpose of determining the TSS and TP treatment effectiveness
ponds constructed and used for the collection and treatment of stormwater.
of
[Minn. R. 7090]
21.9
The permittee
schedule
permittee
a. complaints
b. maintenance
case the
must inspect structural stormwater
below) each calendar year to
determines either of the following
received or patterns of maintenance
or sediment removal is
permittee may reduce the frequency
BMPs
determine structural
conditions
indicate
not required
of inspections
(excluding stormwater ponds, which are under
integrity, proper function, and maintenance
apply:
a greater frequency is necessary; or
after completion of the first two calendar year
to once every two (2) calendar years.
a separate
needs unless
inspections; in
[Minn. R. 7090]
the
which
21.10
Prior to
outfalls
needs
the expiration
(excluding underground
[Minn. R. 7090]
date of the General Permit, the permittee must conduct at least one inspection of all ponds and
outfalls) in order to determine structural integrity, proper function, and maintenance
21.11
Based on inspection
in order to ensure
must complete
completed within
[Minn. R. 7090]
findings, the permittee must determine if repair, replacement, or maintenance measures are necessary
the structural integrity and proper function of structural stormwater BMPs and outfalls. The permittee
necessary maintenance as soon as possible. If the permittee determines necessary maintenance cannot be
one year of discovery, the permittee must document a schedule(s) for completing the maintenance.
21.12
The permittee
responsibilities
use training
other organizations
a. address
b. cover
items 18.8,
c. include
training
must implement a
as they relate to the
materials from the United
as appropriate
the importance of protecting
the requirements of the
18.9, 19.11, 20.18, and
a schedule that establishes
intervals to address changes
stormwater
permittee's
States
to meet
permit
21.7;
initial
in
management
SWPPP,
Environmental
this requirement.
water quality;
relevant to
and
training
procedures,
training program
including reporting
Protection
The training
the responsibilities
for individuals, including
practices, techniques,
commensurate
and
Agency (USEPA),
program
of the individual
new
or requirements.
assessment
state
must:
not
and/or seasonal
with individual's
activities. The
and regional
already addressed
employees,
[Minn. R. 7090]
permittee may
agencies, or
in
and recurring
21.13
The permittee
a. date(s)
in accordance
b. any adjustments
c. date(s) and
discharge
d schedule(s)
e stormwater
individuals
must document the following information
and description of findings including whether
with items 21.9 and 21.10
to inspection frequency as authorized
a description of maintenance conducted
is detected;
for maintenance of structural stormwater
management training events, including
in attendance, and date of each event.
associated
or not an
in item
as a result
BMPs and
general subject
[Minn. R. 7090]
with the operations and maintenance program:
illicit discharge is detected, for all inspections conducted
21.9;
of inspection findings, including whether or not an illicit
outfalls as required in item 21.11; and
matter covered, names and departments of
Coverage issued September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 17 of 28
21.14
The permittee must document
a. a unique ID number and
b. the volume (e.g. cubic
c. results from any testing
d. location(s) of final disposal
pond sediment excavation and removal
geographic coordinates of each stormwater
yards) of sediment removed from each
of sediment from each removal activity;
of sediment from each stormwater
stormwater
and
pond.
activities, including:
pond from which
pond;
[Minn. R. 7090]
sediment is removed;
21.15
The permittee
compliance, the
might be improved.
MCM (e.g., inventory,
assessment prior
of the annual assessment.
must conduct
status of achieving
Measurable
trainings,
to completion
an annual assessment
the measurable
requirements
inspections,
of each annual
[Minn. R. 7090]
of the operations and maintenance program to evaluate program
requirements in Section 21, and determine how the program
are activities that must be documented or tracked as applicable to the
maintenance activities, etc.). The permittee must perform the annual
report and document any modifications made to the program as a result
22.1
Discharges
to Impaired
Waters with a USEPA-Approved
TMDL that Includes an Applicable
WLA.
[Minn. R. 7090]
22.2
If the permittee
summary
include
a. a list
b. the implementation
c. an updated
has an applicable WLA not being met for oxygen demand,
of the permittee's progress toward achieving those applicable
the following information:
of all BMPs applied towards achieving applicable WLAs for
status of BMPs included in the compliance
estimate of cumulative TSS and TP load reductions.
nitrate,
WLAs with
oxygen demand,
schedule at the
[Minn. R. 7090]
TSS, or TP, the permittee must provide a
the annual report. The summary must
nitrate, TSS, and TP;
time of final application submittal; and
22.3
If the permittee
maintain a written
or other bird, dog
has
an applicable
or mapped
parks).
WLA where
inventory
[Minn. R. 7090]
a reduction in pollutant loading is required for bacteria, the permittee must
of potential areas and sources of bacteria (e.g., dense populations of waterfowl
22.4
If the permittee has an applicable WLA where
must maintain a written plan to prioritize reduction
item 22.3. The written plan must include BMPs
is not limited to:
a. water quality monitoring to determine areas
b. installation of pet waste pick-up bags in
c. elimination of over -spray irrigation that
d. removal of organic matter via street sweeping;
e. implementation of infiltration structural
f. management of areas that attract dense
parks
may
stormwater
populations
a reduction
activities
the permittee
of high bacteria
and open
occur at permittee
BMPs;
of
in pollutant loading
to address
will implement
loading;
spaces;
owned
or
waterfowl (e.g.,
the
areas;
riparian
is required
areas
over the
and sources
permit
plantings).
for bacteria,
the permittee
identified in the
term, which may
[Minn. R. 7090]
inventory in
include, but
22.5
If the permittee
must document
[Minn. R. 7090]
has an applicable WLA where a reduction in pollutant loading is required for chloride, the permittee
the amount of deicer applied each winter maintenance season to all permittee owned/operated surfaces.
22.6
If the permittee
the permittee
deicing
BMPs.
complete
to:
a. operational
road surface
b. implementation
c. regular
d. optimizing
e. designation
has an applicable WLA where a
must conduct an assessment of the
salt applied to permittee owned/operated
The permittee may use the Agency's Smart
this assessment. The permittee must
changes such as pre -wetting, pre
temperature, etc.;
of new or modified equipment
calibration of equipment;
mechanical removal to reduce use
of no salt and/or low salt zones.
reduction in pollutant
permittee's
surfaces and
Salting Assessment
document the
-treating the salt
providing pre
of deicers; or
[Minn. R. 7090]
loading is required for chloride, each calendar year
winter maintenance operations to reduce the amount of
determine current and future opportunities to improve
Tool or other available resources and methods to
assessment The assessment may include, but is not limited
stockpile, increasing plowing prior to deicing, monitoring of
-wetting, or other capability for minimizing salt use;
22.7
If the permittee has an applicable WLA where a reduction in pollutant loading is required for temperature (i.e., City of
Duluth, City of Hermantown, City of Rice Lake, City of Stillwater MnDOT Outstate, St. Louis County, University of Minnesota
Coverage issued: September 28, 2021
Permit expires: November 15, 2025
M5400026
Page 18 of 28
- Duluth,
permittee
limited
a. implementation
b. disconnection
c. retrofitting
d. improvement
and Lake Superior
will implement
to:
of
and/or
existing
of riparian
College),
to reduce
infiltration
reduction
structural
vegetation.
the
thermal
BMPs such
of impervious
stormwater
permittee must
loading during
as bioinfiltration
surfaces;
BMPs; or
[Minn. R 7090]
maintain a written plan that identifies specific activities the
the permit term. The written plan may include, but is not
practices;
23.1
Alum or Ferric Chloride Phosphorus
Treatment Systems.
[Minn. R. 7090]
23.2
If the
requirements.
permittee
uses an alum
[Minn. R. 7090]
or ferric chloride phosphorus treatment system, the permittee must comply with Section 23
23.3
The permittee's
a. the permittee
discharges
b. the treatment
utilized conveyances
c. phosphorus
the Agency;
d. in -lake
must
and
phosphorus
alum or ferric chloride phosphorus treatment system must comply with
must use the treatment system for the treatment of phosphorus in stormwater.
not be treated by this system;
system must be contained within the conveyances and structural stormwater
and structural stormwater BMPs must not include any receiving waters;
treatment systems utilizing chemicals other than alum or ferric chloride must
treatment activities are not authorized under the General Permit.
the following:
Non-stormwater
BMPs of
receive written
[Minn. R. 7090]
the MS4. The
approval from
23.4
The permittee's alum or ferric chloride phosphorus treatment system must meet
a. the treatment system must be constructed in a manner that diverts the stormwater
conveyance system;
b. a high flow bypass must be part of the inlet design; and
c. a flocculant storage/settling area must be incorporated into the design, and
provided (minimum of 8 feet wide) for the removal of accumulated sediment.
the following
flow to
adequate maintenance
[Minn. R. 7090]
design parameters:
be treated from the main
access must be
23.5
A designated person must
seven (7) days, and within
which occurs within 24 hours
after that rainfall event
perform visual
24 hours after
after a rainfall
[Minn. R. 7090]
monitoring of the treatment system for proper performance at least once every
a rainfall event greater than 2.5 inches in 24 hours. Following visual monitoring
event, the next visual monitoring must be conducted within seven (7) days
23.6
Three (3) benchmark monitoring
units of measure, and frequency
stations must be established. Table
of measurement for each station.
1
[Minn.
in Appendix
R. 7090]
A must be used for the parameters,
23.7
Samples
must be collected as
grab samples
or flow -weighted 24-hour composite
samples.
[Minn. R. 7090]
23.8
Each sample, excluding
and/or the Agency,
a. sample preservation
Minn. R 7041.3200;
b detection limits
6 micrograms per
c. pH must be
[Minn. R. 7090]
pH samples, must be analyzed by
and
and test procedures for the analysis
for dissolved phosphorus, dissolved aluminum,
liter, 10 micrograms per liter, and 20 micrograms
measured within 15 minutes of sample collection
a laboratory
of pollutants
using
certified by the Minnesota Department of Health
must conform to 40 CFR Part 136 and
and dissolved iron must be a minimum of
per liter, respectively; and
calibrated and maintained equipment.
23.9
In the following situations, the permittee must perform corrective action(s) and immediately notify the Minnesota
Department of Public Safety Duty Officer at 800-422-0798 (toll free) or 651-649-5451 (Metro area):
a. the pH of the discharged water is not within the range of 6.0 and 9.0;
b. any indications of toxicity or measurements exceeding water quality standards which could endanger human health,
public drinking water supplies, or the environment; or
c. a spill or discharge or alteration resulting in water pollution as defined in Minn. Stat. 115.01, subd. 13, of alum or
ferric chloride.
Coverage issued. September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 19 of 28
if
item b is applicable, the
[Minn. R. 7001 0150, subp
permittee must also
3(K), Minn. R. 7090]
report the non-compliance to the Commissioner as required
in item 26.11.
23.10
f
determines
report
the permittee discovers
does not
the non-compliance
indications of toxicity or measurements
endanger human health, public drinking
to the Commissioner as required
exceeding
water supplies,
in item 26.12.
water quality standards
or the environment, the
[Minn R. 7001.0150, subp.
that the permittee
permittee must
3(L), Minn. R. 7090]
23.11
The permittee
month -by -month
a. date(s) of operation;
b. chemical(s)
c. gallons of water
d. gallons of alum
e. calculated pounds
f. any performance
[Minn R. 7090]
must submit the following information with the annual report. The annual report must include a
summary of:
used for treatment;
treated;
or ferric chloride treatment used;
of phosphorus removed; and
issues and the corrective action(s), including the date(s) when corrective action(s) were taken.
23.12
A record of the design
parameters in items 23.13 through
23.15 must be kept
on-site.
[Minn. R. 7090]
23.13
Site-specific
approved
jar testing conducted
version of ASTM D2035.
using
[Minn.
typical and
R 7090]
representative water samples in accordance with the most current
23.14
Baseline
a.
b.
aluminum
phosphorus.
concentrations
or
of the
iron; and
[Minn. R 7090]
following parameters
in the influent and receiving waters:
23.15
The following
a. flocculant settling
b. minimum required
c. rate of diversion
d. the flow rate
e. range of expected
system parameters
velocity;
retention
of stormwater
from the discharge
dosing
and
time;
into
rates.
how each was
the system;
of the outlet structure;
[Minn. R. 7090]
determined:
and
23.16
The
a.
equipment;
b.
handled
c.
following site-specific
procedures for the installation,
specific parameters for
and disposed of;
procedures for cleaning
procedures
determining
and
up
must be
operation and
when the
and/or containing
developed
maintenance
solids
a spill
and a copy kept on-site:
of all pumps, generators,
must be removed from the system
of each chemical stored on-site.
control systems,
and how the
[Minn. R. 7090]
and other
solids will be
24.1
Stormwater Pollution Prevention Program (SWPPP) Modification
[Minn. R. 7090]
24.2
The
Minn.
a. discharges
b. more
c. additional
and
Commissioner
R. 7001, and
from the
stringent requirements
conditions
protect water quality.
may require
may consider
MS4
are
the permittee
the following
are impacting
are necessary
deemed necessary
[Minn. R 7090]
to modify the SWPPP as needed, in accordance with the procedures of
factors:
the quality of receiving waters;
to comply with state or federal regulations; and
to comply with the goals and applicable requirements of the Clean Water Act
24.3
Modifications
approved
forth
requirements
that the
by the Commissioner
schedules for compliance.
of the
permittee chooses to make
in accordance
The request must
permit, and meet other applicable
with
to the SWPPP
the procedures
discuss alternative
laws.
other than
of Minn.
program
[Minn. R. 7090]
modifications authorized
R. 7001 All requests must
modifications, assure compliance
in item 24.4, must be
be in writing, setting
with
24.4
The permittee
of the modification
following
categories:
may modify the SWPPP without prior approval of the Commissioner provided the Commissioner is notified
in the annual report for the year the modification is made and the modification falls under one of the
Coverage issued September 28, 2021
Permit expires: November 15, 2025
M5400026
Page 20 of 28
a. a BMP is added and
b. a less effective BMP
concerns as the ineffective
none subtracted, from
is replaced with a
or failed BMP.
the SWPPP;
more effective BMP.
[Minn. R. 7090]
or
The alternate BMP must address the same, or similar,
25.1
Annual Assessment, Annual Reporting,
and Recordkeeping.
[Minn. R. 7090]
25.2
The permittee must conduct an annual assessment to evaluate compliance with the terms
General Permit, including the effectiveness of the components of the SWPPP and the status
requirements in the General Permit. Measurable requirements are activities that must
(e.g., education and outreach efforts implementation of written plans, inventories, trainings,
enforcement, etc.). The permittee must perform the annual assessment prior to completion
document any modifications made to the SWPPP as a result of the annual assessment.
and conditions
of achieving
be documented
site plan
of each annual
[Minn. R. 7090]
of the
the measurable
or tracked
reviews, inspections,
report and
25.3
identified
The permittee
portion of the previous
General Permit.
but is not limited
a. the status of
by the
assessment must
findings, and public
b. the stormwater
c. a change in any
d. the summary
e. information
f. a statement that
more permit requirements
[Minn. R. 7090]
must
The
to:
compliance
permittee
be
identified
required
required
submit an annual report: Due annually,
calendar year during which the
annual report shall be submitted to
with permit terms and conditions,
and progress towards achieving
based on results of information collected
input received during the reporting
activities the permittee plans to undertake
BMPs for any of the MCMs;
in item 22.2 to demonstrate progress
to be recorded or documented
the permittee is relying on a partnership(s)
(if applicable), and what agreements
by the 30th of June. The annual report
permittee was authorized to discharge stormwater
the Agency, in a manner determined by
including an assessment of the appropriateness
the measurable requirements of each
and analyzed, including monitoring
period;
during the next reporting cycle;
toward achieving applicable WLAs;
in Sections 13 through 24; and
with another regulated small MS4(s)
the permittee has entered into
must cover the
under the
the Agency, that includes
of BMPs
of the MCMs. The
(if any), inspection
to satisfy one or
in support of this effort.
25.4
The
regular
permittee must make records, including components of
business hours (see 40 CFR 122.7 for confidentiality
the SWPPP,
provision).
available to the
[Minn. R. 7090]
public at reasonable times during
25.5
The permittee must retain
requirements, all data
developed as a requirement
years beyond the date
enforcement action regarding
copies
and information
of permit
of
of the permit application,
used by the permittee
the General Permit or
expiration. This period
the small MS4 or as requested
all documentation necessary
to complete the application
as requested by the Commissioner,
is automatically extended during
by the Commissioner.
to comply with SWPPP
process, and any information
for a period of at least three (3)
the course of an unresolved
[Minn R. 7001.0080, Minn. R. 7090]
25.6
The permittee
that are relevant
the General Permit
Minn. R. 7090]
must, when requested by the Commissioner, submit within a reasonable time the information and reports
to the control of pollution regarding the construction, modification or operation of the facility covered by
or regarding the conduct of the activity covered by the General Permit. [Minn. R. 7001.0150, subp. 3(H),
25.7
The permittee must use an electronic
General Permit. If electronic submittal
Supervisor, Municipal Stormwater
Minnesota Pollution Control Agency
520 Lafayette Road North
St. Paul Minnesota 55155-4194.
submittal
is not available,
Unit
[Minn. R. 7090]
process as provided by the Agency, to submit information required by the
the permittee must use the following mailing address:
26.1
General Conditions.
[Minn. R. 7090]
26.2
The
or federal
subp.
Agency's
3(A)]
issuance of a permit does not release the permittee from any liability, penalty or duty imposed by Minnesota
statutes or rules or local ordinances, except the obligation to obtain the General Permit. [Minn. R. 7001.0150,
26.3
The Agency's issuance
or orders more stringent
of a permit does not
than those now
prevent the future adoption
in existence and does not
by the Agency of pollution control rules, standards,
prevent the enforcement of these rules, standards or
Coverage issued September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 21 of 28
orders against
the
permittee.
[Minn. R. 7001.0150, subp.
3(B)]
26.4
The General Permit does not convey a
property
right
or an exclusive
privilege.
[Minn. R. 7001.0150, subp.
3(C)]
26.5
The Agency s issuance of
by Minnesota statutes.
a permit does not obligate
[Minn. R. 7001.0150, subp.
the
3(D)]
Agency to enforce local laws, rules or plans beyond that authorized
26.6
The
and
subp.
permittee
specifications
3(E)]
must perform the actions or conduct the activity authorized by the permit in accordance with the plans
approved by the Agency and in compliance with the conditions of the permit. [Minn. R. 7001.0150,
26.7
The permittee must at
appurtenances related
the General Permit. Proper
operator staffing and training,
procedures. The permittee
achieve compliance with
permits, if these backup
all times properly operate and maintain the facilities and systems
to them which are installed or used by the permittee to achieve
operation and maintenance includes effective performance,
and adequate laboratory and process controls, including
must install and maintain appropriate backup or auxiliary facilities
the conditions of the General Permit and, for all permits other
or auxiliary facilities are technically and economically feasible.
of treatment and control
compliance with the conditions
adequate funding, adequate
appropriate quality assurance
if they are necessary
than hazardous waste facility
[Minn. R. 7001.0150, subp.
and
to
3(F)]
the
of
26.8
The
plan
permittee
plans,
subp.
permittee may not knowingly
or other document required
must immediately upon
or other documents. [Minn.
1(H), Minn Stat. 609.671]
make a false or misleading statement, representation, or certification in a record, report,
to be submitted to the Agency or to the Commissioner by the General Permit. The
discovery report to the Commissioner an error or omission in these records, reports,
R 7001.0150, subp. 3(G), Minn. R. 7001.1090, subp. 1(G), Minn. R. 7001.1090,
26.9
When authorized
Agency, or an authorized
upon the property
covered by the General
the construction,
General Permit.
by Minn. Stat 115.04, 115B.17,
employee or agent
of the permittee to examine
Permit; and to conduct
modification, or operation
[Minn. R. 7001.0150, subp.
of
of
3(1)]
subd. 4, and 116.091,
the Agency, must
and copy books,
surveys and investigations
the facility covered
and upon presentation of proper credentials, the
be allowed by the permittee to enter at reasonable times
papers, records, or memoranda pertaining to the activity
including sampling or monitoring, pertaining to
by the permit or pertaining to the activity covered by the
26.10
If the
of the
human
subp.
permittee
General
health
3(J)]
discovers, through any means, including notification by the Agency, that noncompliance with a condition
Permit has occurred, the permittee must take all reasonable steps to minimize the adverse impacts on
public drinking water supplies, or the environment resulting from the noncompliance. [Minn. R. 7001.0150,
26.11
If the permittee discovers
human health, public drinking
the noncompliance orally
must submit to the Commissioner
dates of the period of the
to continue; and steps taken
[Minn. R. 7001.0150 subp.
that noncompliance
water
notify
noncompliance;
or
3(K)]
with a condition of the General Permit has occurred which could endanger
supplies, or the environment, the permittee must, within 24 hours of the discovery of
the Commissioner. Within five days of the discovery of the noncompliance the permittee
a written description of the noncompliance; the cause of the noncompliance; the exact
if the noncompliance has not been corrected, the anticipated time it is expected
planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.
26.12
The permittee must report
report which the permittee
discovery of the noncompliance,
discovery of the noncompliance.
noncompliance
is required
with the General
to submit under the
the permittee must submit
[Minn. R. 7001.0150, subp.
Permit not reported
General Permit. If no
the information listed
3(L), Minn. R. 7090]
under item 26.11 as a part of the next
reports are required within 30 days of the
in item 26.11 within 30 days of the
26.13
The permittee must give advance notice to the Commissioner
additions to the permitted facility (MS4) or activity that may
control statute or rule or a condition of the General Permit.
as soon as possible of planned
result in noncompliance
[Minn. R. 7001.0150, subp.
with a
3(M)]
physical alterations or
Minnesota or federal pollution
26.14
The General Permit
with the requirements
conditions of the General
is not transferable
of Minn. R.
Permit.
to any person without
7001.0190. A person to
[Minn. R. 7001.0150, subp
the express
whom the
3(N)]
written approval of the Agency after compliance
permit has been transferred must comply with the
26.15
The
General
the
directed,
employees,
General Permit
Permit. In
environment caused
or undertaken
that liability
authorizes
issuing
is
the
by the
under
explicitly
the permittee to perform
permit, the state and
activities of the permittee
the permit. To the extent
limited to that
the
Agency
the
provided
activities described
assume no responsibility
in the conduct of its actions,
state and Agency may
in the Tort Claims Act,
in the permit under the
for damage to persons,
including those
be liable for the activities
Minn. Stat. 3.736.
conditions of the
property, or
activities authorized,
of its
[Minn. R. 7001.0150,
Coverage issued September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 22 of 28
subp.
3(0)]
26.16
The General Permit incorporates by reference
Minn. R. 7001.1090, which are enforceable
the applicable portions of
parts of the General Permit.
40 CFR 122.41
[Minn R. 7090]
and 122.42(c) and (d), and
26.17
The provisions of the General Permit are severable, and if any provision of the General
provision of the General Permit to any circumstance, is held invalid the application of
circumstances and the remainder of the General Permit shall not be affected thereby.
Permit, or the
such provision
[Minn. R. 7090]
application of any
to other
27.1
Definitions.
[Minn. R. 7090]
27.2
'Active karst' means a terrain having distinctive
rocks within 50 feet of the land surface
landforms
[Minn. R. 7090]
and hydrology created primarily from the dissolution of soluble
27.3
"Agency"
means the Minnesota Pollution Control Agency
or MPCA.
[Minn. Stat. 116.36, subd. 2]
27.4
"Alum or Ferric Chloride Phosphorus Treatment
of phosphorus through the use a continuous feed
treated stormwater back into a MS4 or receiving
System"
of alum
water.
means the diversion
or ferric chloride
[Minn. R. 7090]
of flowing stormwater from a MS4, removal
additive, flocculation, and the return of the
27.5
"Applicable WLA" means a Waste Load
issuance date of the General Permit.
Allocation assigned
[Minn. R. 7090]
to the permittee and approved by the USEPA prior to the
27.6
"Best
including
requirements,
drainage
Management Practices or
schedules of activities, prohibitions
operating procedures
from raw material storage.
"BMPs'
means practices to prevent
of practices, and
and practices to control plant
[Minn. R. 7001.1020, subp.
other
5]
or reduce the pollution of the waters of the state,
management practices, and also includes treatment
site runoff, spillage or leaks, sludge, or waste disposal or
27.7
"Commissioner" means the
[Minn. Stat. 116.36, subd. 3]
Commissioner of the Minnesota Pollution Control Agency or the Commissioner's designee.
27.8
'Common Plan of Development
activities may be taking
defined to include design
activities may occur.
or Sale"
place at different
permit application,
[Minn. R. 7090]
means a contiguous area where multiple separate and distinct land disturbing
times, on different schedules, but under one proposed plan. One plan is broadly
advertisement or physical demarcation indicating that land -disturbing
27.9
"Construction
to or
common
This
nonvegetative,
erosion
for
purpose
non
projects)
Activity' means activities
greater than one acre, including
plan of development or sale
includes a disturbance to the land
or the existing soil topography
and movement of sediment.
the purpose of routine maintenance
of the facility. Routine maintenance
-routine maintenance. Pavement
is not construction activity.
including clearing,
the disturbance
if the larger common
that results
that
Construction activity
performed
does not
rehabilitation
[Minn. R. 7090]
in
to
that
grading, and excavating, that result
of less than one acre of total land area that
plan will ultimately disturb equal to
a change in the topography, existing soil cover,
may result in accelerated stormwater runoff
does not include a disturbance to the
maintain the original line and grade, hydraulic
include activities such as repairs replacement
does not disturb the underlying soils (e.g.,
in land disturbance of equal
is part of a larger
or greater than one acre.
both vegetative and
that may lead to soil
land of less than five acres
capacity, and original
and other types of
mill and overlay
27.10
'DNR Catchment Area" means the Hydrologic Unit 08 areas
areas are available for download at the Minnesota DNR Geospatial
corrected, in which case the local corrections may be used.
delineated and
Commons
[Minn. R. 7090]
digitized by the Minnesota DNR. The catchment
website. DNR catchment areas may be locally
27.11
"Existing Permittee" means
previously issued general
an owner/operator of a small MS4 that has been
permit for small MS4s in the state of Minnesota.
authorized to
[Minn. R. 7090]
discharge stormwater under a
27.12
'Fully
such
underlying
such
improvements
reconstructed" means areas where impervious surfaces
as structure renovation, mill and overlay projects,
soils beneath the structure, pavement, or activity
as catch basin repair/replacement utility repair/replacement,
are not considered fully reconstructed.
have been
and other pavement
are not considered
pipe
[Minn. R. 7090]
removed down to the underlying soils. Activities
rehabilitation projects that do not expose the
fully reconstructed. Maintenance activities
repair/replacement, lighting and pedestrian ramp
27.13
"General permit" means a permit
emissions, activities, discharges,
issued under Minn. R. 7001.0210 to a category of
or facilities are the same or substantially similar.
permittees whose operations,
[Minn. R. 7001.0010, subp.
4]
27.14
"Geographic
Cartesian
Zone 15N
Coordinates" means the
coordinate system (i.e. latitude/longitude)
in the NAD83 datum. For
point
polygon
location of a stormwater
that
features, the
can
geographic
be
feature expressed
readily converted to Universal
coordinates will typically
by X, Y coordinates
Transverse
define the approximate
of
Mercator
a
standard
(UTM),
Coverage issued September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 23 of 28
center of a stormwater feature,
[Minn. R. 7090]
27.15
"High
flows
be negatively
Flow Bypass' means a
away. High flow bypasses
affected by higher
function of
are generally
flows.
an inlet device
used for
[Minn. R. 7090]
that allows a certain flow of water through, but diverts any higher
BMPs that can only treat a designed amount of flow and that would
27.16
'Illicit Discharge" means any
except discharges pursuant
storm sewer) and discharges
discharge
to a NPDES
resulting
to a municipal
permit (other
from firefighting
than
separate storm
the NPDES
activities
sewer that
permit for
[40 CFR 122.26(b)(2)]
is not
discharges
composed entirely of stormwater
from the municipal separate
27.17
"Impaired Water' means waters identified as impaired
303(d) of the Clean Water Act (33 U.S.C. 303(d)).
by the Agency,
[Minn R. 7090]
and approved by the USEPA, pursuant to section
27.18
"Linear project'
of a common plan
development are
[Minn. R. 7090]
means construction of new or fully reconstructed roads, trails, sidewalks, or rail lines that are not part
of development or sale. For example, roads being constructed concurrently with a new residential
not considered linear projects because they are part of a common plan of development or sale.
27.19
'Maximum Extent Practicable' or "MEP"
level of pollutant reductions that an
provided a precise definition of MEP
represent MEP may be different for
and the differing possible pollutant
satisfy each of the six Minimum Control
of the MEP standard as an iterative
means
owner or
to allow
each small
control strategies.
Measures
process.
the statutory
operator of regulated
maximum flexibility
MS4, given the
Therefore,
(MCMs) through
[Minn. R. 7090]
standard (33 U.S.C. 1342(p)(3)(B)(iii)) that establishes the
MS4s must achieve. The USEPA has intentionally not
in MS4 permitting. The pollutant reductions that
unique local hydrologic and geologic concerns that may exist
each permittee will determine appropriate BMPs to
an evaluative process. The USEPA envisions application
27.20
"Municipal
drainage systems,
a. owned or
state law,
districts under
tribe or an
the federal
b. designed
c. that is not
d. that is not
Municipal
buildings.
separate storm sewer system'
municipal streets,
operated by a state, city,
having jurisdiction over disposal
state law such as a sewer
authorized Indian tribe organization,
Clean Water Act, United
or used for collecting or
a combined sewer; and
part of a publicly owned
separate storm sewer systems
[Minn. R. 7090.0080, subp.
catch
town,
States
conveying
treatment
8]
or "MS4" means a conveyance
basins, curbs, gutters, ditches,
county, district, association,
of sewage industrial wastes,
district, flood control district,
or a designated and
Code, title 33, section 1288,
stormwater;
works as defined
do not include separate storm
or system of conveyances including roads with
man-made channels, or storm drains:
or other public body, created by or pursuant to
stormwater or other wastes, including special
or drainage district or similar entity, or an Indian
approved management Agency under section 208 of
that discharges into waters of the state;
in 40 CFR 122.2.
sewers in very discrete areas, such as individual
27.21
'New Permittee'
previously
coverage
means an owner/operator
issued General Stormwater
under the General Permit.
of a small
Permit for small
[Minn. R. 7090]
MS4 that has not been authorized to discharge stormwater under a
MS4s in the state of Minnesota and that applies for, and obtains
27.22
"Non-Stormwater Discharge'
means any discharge
not composed
entirely of stormwater.
[Minn. R. 7090]
27.23
"Operator"
subp.
10]
means the person with primary
operational control and legal responsibility for the MS4. [Minn.
R. 7090.0080,
27.24
"Outfall" means the
leaves the permittee's
water systems (e.g.,
point source where a MS4
MS4. It does not include
when a conveyance temporarily
discharges to a receiving water, or the
diffuse runoff or conveyances that connect
leaves an MS4 at a road crossing).
stormwater
discharge
segments of
[Minn. R. 7090]
permanently
the same stream or
27.25
"Owner" means the
person that owns the MS4.
[Minn. R. 7090.0080, subp.
11]
27.26
"Permittee"
compliance
means a person or persons, that signs the permit application
with the terms and conditions of the General Permit.
submitted
[Minn. R 7090]
to the Agency and is responsible for
27.27
"Person" means the state or any Agency
corporation, individual, partnership,
body, and includes any officer or governing
private corporation, or other entity.
or institution thereof, any
or other entity, including, but
or managing body of any
[Minn. Stat. 115.01, subd. 10]
municipality, governmental subdivision, public or private
not limited to, association, commission or any interstate
municipality, governmental subdivision, or public or
Coverage issued September 28, 2021
Permit expires: November 15, 2025
MS400026
Page 24 of 28
27.28
"Pipe"
of
pipes.
pipe
means a closed
does not include
[Minn. R. 7090]
manmade conveyance device used to transport stormwater
foundation drain pipes, irrigation pipes, land drain tile pipes,
from location to location. The definition
culverts, and road sub -grade drain
27.29
'Receiving Water"
[Minn. R. 7090]
means any lake, river, stream or wetland that receives
stormwater discharges from an MS4.
27.30
'Reduce"
used.
means reduce
[Minn. R. 7090]
to the Maximum Extent Practicable (MEP) unless otherwise defined in the context in which it is
27.31
"Seasonally Saturated
voids filled with
redoximorphic features
measurements.
Soil"
water causing
or other
[Minn. R. 7090]
means
the highest seasonal elevation in the soil in
anaerobic conditions. Seasonally saturated soil
information determined by scientifically established
a reduced chemical state because of soil
is evidenced by the presence of
methods or empirical field
27.32
"Section' includes
items 5.1 through
all item
5.5.
numbers of
[Minn. R 7090]
the same whole number. For example, "Section 5" of the General Permit refers to
27.33
'Significant Materials" includes but is not limited
plastic pellets; finished materials such as metallic
substances designated under Section 101(14)
Act (CERCLA); any chemical the facility is required
Community Right -to -Know Act (EPCRA); fertilizers,
the potential to be released with stormwater
and chemical characteristics of the material
characteristics) to determine the material's
to:
products;
of the Comprehensive
to report
pesticides,
discharges.
should be
pollution
raw materials,
raw
pursuant
and
When
considered
potential.
fuels, materials such
materials used in food
Environmental Response,
to Section 313 of
waste products such
determining whether
(e.g. the material's
[40 CFR 122.26(b)(12)]
as solvents, detergents, and
processing or production; hazardous
Compensation, and Liability
the Emergency Planning and
as ashes slag, and sludge that have
a material is significant, the physical
solubility, transportability, and toxicity
27.34
"Small Municipal Separate Storm Sewer System" or "small
a. Owned or operated by the United States, a state, city,
body (created by or pursuant to state law) having jurisdiction
other wastes, including special districts under state law
similar entity, or an Indian tribe or an authorized Indian
Agency under section 208 of the CWA that discharges to
b. Not defined as "large" or 'medium" Municipal Separate
(b)(4) and (b)(7) or designated under paragraph (a)(1)(v).
c. This term includes systems similar to separate storm
large hospital or prison complexes, and highways and other
sewers in very discrete areas, such as individual buildings.
town,
such
tribal
waters
sewer
MS4", means all
borough, county,
over disposal
as a sewer district,
organization,
of the United
Storm Sewer Systems
systems in
thoroughfares.
[Minn. R. 7090]
separate storm sewers that are:
parish, district, association, or other public
of sewage industrial wastes, stormwater, or
flood control district or drainage district, or
or a designated and approved management
States.
pursuant to 40 CFR 122.26 paragraphs
municipalities, such as systems at military bases,
The term does not include separate storm
27.35
"Stormwater" means stormwater runoff, snow melt runoff, and surface runoff and drainage.
[Minn. R. 7090.0080, subp.
12]
27.36
"Stormwater flow direction"
elevations can be displayed
means the direction of predominant
on the storm sewer system map.
flow within
[Minn. R. 7090]
a pipe.
Flow direction can be discerned if pipe
27.37
"Stormwater
manage
Pollution Prevention Program"
and reduce the discharge of
or "SWPPP" means a comprehensive program
pollutants in stormwater to and from the small MS4.
developed by
[Minn. R. 7090]
the permittee to
27.38
"Structural Stormwater BMP"
prevent or reduce the discharge
means
of
a stationary and permanent
pollutants in stormwater.
BMP that is
[Minn R. 7090]
designed, constructed, and operated to
27.39
'Total Maximum Daily
allocations for nonpoint
and allocates the maximum
attainment and maintenance
Load" or "TMDL"
sources and natural
amount of
of water quality
means the sum of
background,
a pollutant that may
standards.
the individual Waste Load
as more fully defined in
be introduced into a water
[Minn. R. 7052.0010, subp.
Allocations
40 CFR
42]
for point sources and load
130.2, paragraph (i). A TMDL sets
of the state and still assure
27.40
"Waste
existing
paragraph
developed
that
applicable
Load Allocation"
or future
(h). In the
and approved
ensures that
water quality
or "WLA' means the portion
point sources of pollution as
absence of a TMDL approved
according to Minn. R.
the level of water quality to be
standards and criteria.
of a receiving water's
more fully defined in Code
by USEPA under 40 CFR
7052.0200, subp 1.C, a WLA
achieved by the point source
[Minn. R. 7052 0010 subp.
loading
of Federal
130.7,
is
45]
capacity that is allocated to one of its
Regulations, title 40, section 130.2,
or an assessment and remediation plan
the allocation for an individual point source
is derived from and complies with all
Coverage issued: September 28, 2021
Permit expires: November 15, 2025
27.41
27.42
MS400026
Page 25 of 28
"Water pollution" means (a) the discharge of any pollutant into any waters of the state or the contamination of any waters
of the state so as to create a nuisance or render such waters unclean, or noxious, or impure so as to be actually or
potentially harmful or detrimental or injurious to public health, safety or welfare, to domestic agricultural, commercial,
industrial, recreational or other legitimate uses, or to livestock, animals, birds, fish or other aquatic life; or (b) the alteration
made or induced by human activity of the chemical, physical, biological, or radiological integrity of waters of the state.
[Minn. Stat. 115.01, subd. 13]
'Water Quality Standards" means those provisions contained in Minn. R. 7050 and 7052. [Minn. R. 7090]
27.43
27.44
"Water Quality Volume" means either:
a. for construction activity (excluding linear projects), one (1) inch of runoff from the sum of the new and fully
reconstructed impervious surfaces created by the project (calculated as an instantaneous volume); or
b. for linear projects, the greater of one (1) inch of runoff from the new impervious surface or one-half (0.5) inch of runoff
from the sum of the new and fully reconstructed impervious surfaces created by the project (calculated as an instantaneous
volume). [Minn R. 7090]
"Waters of the State" means all streams, lakes, ponds, marshes, watercourses, waterways, wells, springs, reservoirs,
aquifers, irrigation systems, drainage systems and all other bodies or accumulations of water, surface or underground,
natural or artificial, public or private, which are contained within, flow through, or border upon the state or any portion
thereof. [Minn. Stat 115.01, subd. 22]
27.45
"Wetlands' means those areas that are inundated or saturated by surface water or groundwater at a frequency and
duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically
adapted for life in saturated soil conditions Wetlands generally include swamps, marshes, bogs and similar areas.
Constructed wetlands designed for wastewater treatment are not waters of the state. Wetlands must have the following
attributes:
a. a predominance of hydric soils;
b inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence
of hydrophytic vegetation typically adapted for life in a saturated soil condition; and
c. under normal circumstances support a prevalence of such vegetation. [Minn. R. 7050.0186, subp. 1a.B]
Coverage issued September 28, 2021
Permit expires: November 15, 2025
Appendix A. Alum or Ferric Chloride Phosphorus Treatment Systems
Table 1:
Monitoring parameters during operation
MS400026
Page 26 of 28
Station
Alum
parameters
Ferric
parameters
Units
Frequency
Upstream-
background
Total Phosphorus
Dissolved Phosphorus
Total Aluminum
Dissolved Aluminum
pH
Flow
Total Phosphorus
Dissolved Phosphorus
Total Iron
Dissolved Iron
pH
Flow
mg/L
mg/L
mg/L
mg/L
SU
Mgd
1 x week
1 x week
1 x month
1 x week
1x week
Daily
Alum or Ferric
Chloride Feed
Alum
Ferric
Gallons
Daily total dosed in
gallons
Discharge from
treatment
Total Phosphorus
Dissolved Phosphorus
Total Aluminum
Dissolved Aluminum
pH
Flow
Total Phosphorus
Dissolved Phosphorus
Total Iron
Dissolved Iron
pH
Flow
mg/L
mg/L
mg/L
mg/L
SU
Mgd
1 x week
1 x week
1 x month
1 x week
1x week
Daily
Coverage issued September 28, 2021
Permit expires: November 15, 2025
Appendix B. Schedules
Table 2:
Existing Permittees - Schedule of permit requirements
MS400026
Page 27 of 28
rermir requiremenr
.cneauie
Section 12. Stormwater Pollution Prevention Program (SWPPP)
Document
• Submit the SWPPP Document completed in accordance with
Section 12.
• Within 150 days after General Permit issuance
date.
Section 13. Stormwater Pollution Prevention Program (SWPPP)
• Complete revisions to incorporate the new requirements of
Sections 14 - 23 into current SWPPP.
• Within 12 months of the date
coverage is extended, unless
been specifically established
and identified below.
General Permit
other timelines have
in the General Permit
Section 19. Construction Site Stormwater Runoff Control
• Complete revisions to Construction Site Stormwater Runoff
Control program, including revisions to regulatory mechanism(s),
if necessary.
• When the CSW Permit is reissued, revise regulatory
mechanism(s), if necessary, to be at least as stringent as the
requirements for erosion, sediment, and waste controls described
in the CSW Permit.
• Within 12 months of the date General Permit
coverage is extended.
• Within 12 months of the issuance date of the CSW
Permit (expected issuance date of the CSW Permit
is August 1, 2023).
Section 21. Pollution Prevention/Good Housekeeping for
Municipal Operations
• Conduct structural stormwater best management practice (BMP)
inspections.
• Conduct pond and outfall inspections.
• Each calendar year.
• Prior to the expiration date of the General Permit.
Section 22. Discharges to Impaired Waters with a USEPA-
Approved TMDL that includes an Applicable WLA
• Submit all information required in item 22.2.
• Meet requirements for applicable WLAs for bacteria, chloride,
and temperature in Section 22.
• With each
• Within 12
coverage
annual report.
months of the date General Permit
is extended.
Section 25. Annual Assessment, Annual Reporting, and
Recordkeeping
• Conduct assessment of the SWPPP.
• On a form provided by the Agency, submit an annual report.
• Prior to completion of each annual report.
• By June 30th of each calendar year
Coverage issued September 28, 2021
Permit expires: November 15, 2025
Table 3:
New Permittees - Schedule of permit requirements
MS400026
Page 28 of 28
rermir requiremenr
.cneauie
Section 10. New Permittee Applicants
• Submit Part 1, and Part 2 of the permit application as required
by Section 12.
• Within 18 months of written notification from the
Commissioner that the MS4 meets the criteria
Minn. R. 7090.1010 subp. 1.A. or B. and General
coverage is required.
in
Permit
Section 13. Stormwater Pollution Prevention Program (SWPPP)
• Complete all requirements of Sections 14 - 23.
• Within 36 months of the date General Permit coverage is
extended, unless other timelines have been specifically
established in the General Permit and identified below; or
• Within timelines established by the Commissioner in item 8.3.
Section 14. Mapping
• Develop a storm sewer system map.
• Within 24 months of the date General Permit coverage is
extended.
Section 18. Illicit Discharge Detection and Elimination
• Develop, implement, and enforce an Illicit Discharge Detection
and Elimination Program.
• Within 12 months of the date General Permit coverage is
extended.
Section 19. Construction Site Stormwater Runoff Control
• Develop, implement, and enforce a Construction Site
Stormwater Runoff Control Program.
• When the CSW Permit is reissued, revise regulatory
mechanism(s) if necessary, to be at least as stringent as the
requirements for erosion, sediment, and waste controls
described in the CSW Permit.
• Within 12 months of the date General Permit coverage is
extended.
• Within 12 months of the issuance date of the CSW Permit
(expected issuance date of the CSW Permit is August 1, 2023).
Section 20. Post -Construction Stormwater Management
• Develop, implement, and enforce a Post -Construction
Stormwater Management program.
• Within 24 months of the date General Permit coverage is
extended.
Section 21. Pollution Prevention/Good Housekeeping for
Municipal Operations
• Conduct structural stormwater BMP inspections.
• Conduct pond and outfall inspections.
• Each calendar
• Prior to the expiration
year.
date of the General Permit.
Section 22. Discharges to Impaired Waters with a USEPA-
Approved TMDL that includes an Applicable WLA
• Submit all information required in item 22.2.
• Meet requirements for applicable WLAs for bacteria, chloride,
and temperature in Section 22.
• With each annual report.
• Within 12 months of the date General Permit coverage is
extended.
Section 23 Alum or Ferric Chloride Phosphorus Treatment
Systems (if applicable)
• Meet requirements for treatment systems in Section 23.
• Within 12 months of the date General Permit coverage is
extended.
Section 25. Annual SWPPP Assessment, Annual Reporting, and
Recordkeeping
• Conduct assessment of the SWPPP.
• On a form provided by the Agency, submit an annual report.
• Prior to completion of each annual report.
• By June 30th of each calendar year