Laserfiche WebLink
<br />M0522-C <br /> <br />Page 1301.6 <br /> <br />. <br /> <br />change the course, current or cross-section of a public water, <br />shall be subject to provisions of Minnesota Statutes ~ 103G. <br />(Ord. 506, 4-27-92) <br /> <br />1301.11: USE PERMITS: <br /> <br />Subd. 1. Permit Required: A use permit issued by the Zoning <br />Administrator in conformity with the provisions of this Chapter <br />shall be secured prior to the erection, addition or alteration of <br />any building, structure or portion thereof prior to the use or <br />change of use of building, structure or land, prior to the change <br />or extension of a nonconforming use and prior to the placement of <br />fill or excavation of materials within the Flood Plain Zoning <br />District. <br /> <br />Subd. 2. Application for Permit: Application for a use permit <br />shall be made in duplicate to the Zoning Administrator on forms <br />furnished by him and shall include the following where <br />applicable: Plans in duplicate drawn to scale, showing the <br />nature, location, dimensions and elevations of the loti existing <br />or proposed structures, fill or storage of materials and the <br />location of the foregoing in relation to the stream channel or <br />water body. <br /> <br />. <br /> <br />Subd. 3. State and Federal Permits: Prior to granting a use <br />permit or variance or processing an application for the <br />conditional use permit, the Zoning Administrator shall determine <br />that the applicant has obtained all necessary State and Federal <br />permits. <br /> <br />Subd. 4. certificate of Zoning Compliance for a New, Altered or <br />Nonconforming Use: It shall be unlawful to use, occupy premises <br />or part thereof hereafter created, erected, changed, converted, <br />altered or enlarged in its use or structure until a certificate <br />of zoning compliance shall have been issued by the Zoning <br />Administrator stating that the use of the building or land <br />conforms to the requirements of this Chapter. Where a <br />nonconforming use or structure is extended or substantially <br />altered, the certificate of zoning compliance shall specifically <br />state the manner in which the nonconforming structure or use <br />differs from the provisions of this Chapter. <br /> <br />. <br /> <br />Subd. 5. Construction and Use to Comply: Use permits, conditional <br />use permits or certificates of zoning compliance issued on the <br />basis of approved plans and applications authorize only the use, <br />arrangement and construction set forth in such approved plans and <br />applications and no other use, arrangement or construction. Any <br />use, arrangement or construction at variance with that authorized <br />shall be deemed a violation of this Chapter. The applicant shall <br />be reauiredto submit certification bv a registered professional <br />engin~er, registered architect or registered land surveyor that <br />the finished fill and building elevations were accomplished in <br />compliance with the provisions of this Chapter. Floodproofing <br />measures shall be certified by a registered professional engineer <br />or registered architect. <br />