My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 589
MoundsView
>
Commissions
>
City Council
>
Ordinances
>
0500-0599 (1992)
>
Ordinance 589
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:17:50 PM
Creation date
2/2/2007 3:23:17 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Ordinances
MEETINGDATE
5/22/2025
Description
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Section 6. Section 1301.10 Subd. 2.c.(1), (2) and (3) are hereby amended to read as <br />follows: <br /> <br />(1) All Uses: No structure (temporary or permanent), fill (including fill far for <br />roads and levees), deposit, obstruction, storage of materials or equipment or other <br />uses may be allowed as a conditional use which, acting alone or in combination <br />with existing or reasonably anticipated future uses, increases flood heights. In <br />addition, all F.Z.D. conditional uses shall be subject to the standards contained in <br />subdivision Section 1301.12 Subd. 5 t51 of this Chapter and the following <br />standards of this Subdivision J Section 1301.10 Subd. 2.c. <br /> <br />(2) Fill: <br /> <br />(a) Any fill deposited in the F.Z.D. shall be no more than the minimum <br />amount necessary to conduct a conditional use listed in subdi v iS10n 2b <br />Section 1301.10 Subd. 2.c.(2)(b) hereof. Generally, fill shall be limited to <br />that needed to grade or landscape for that use and shall not, in any way, <br />obstruct the flow of flood waters. Fill shall be properly compacted and the <br />slopes shall be properly protected by the use of riprap, vegetative cover or <br />other acceptable method. The Federal Emergency Management Agency <br />(FEMA) has established criteria for removing the special flood hazard area <br />designation for certain structures properly elevated on fill above the 100- <br />year flood elevation - FEMA's requirements incorporate specific fill <br />compaction and side slope protection standards for multi-structure or <br />multi-lot development. These standards should be investigated prior to the <br />iniation of site preparation is a change of special flood hazard area <br />designation will be requested. <br /> <br />(b) Spoil from dredging or sand and gravel operations shall not be <br />deposited in the F.Z.D. unless it can be done in accordance with <br />subdivision C2a Section 1301.10 Subd. 2.c.(2)(a) above. <br /> <br />(3) Accessory Structures: Temporary or permanent accessory structures permitted <br />as conditional uses by subdivision 2b1 Section 1301.10 Subd. 2.b. hereof. . <br /> <br />(a) All structures, including accessory structures, additions to existing <br />structures and manufactured homes, shall be constructed on fill so that the <br />basement floor, or first floor if there is no basement, is at or above the <br />regulatory flood protection elevation. The finished fill elevation must be no <br />lower than one foot (1 ') below the regulatory flood protection elevation <br />and shall extend at such elevation at least fifteen (15') beyond the limits of <br />the structure constructed thereon. . <br /> <br />Flood Plain Ord. Page No.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.