Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Subd. 2. Additional Next-year Projects: Notwithstanding the foregoing, the Director will <br />not deny an application for a Right-of- Way Permit for failure to include a project in <br />a plan submitted to the City if the Registrant has used commercially reasonable <br />efforts to anticipate and plan for the project. <br /> <br />910.08: <br /> <br />PERMIT REQUIREMENT: <br /> <br />Subd. 1. Permit Required: Except as otherwise provided in this Code, no Person may Obstruct <br />or Excavate any Right-of-Way without first having obtained the appropriate Right-of- <br />Way Permit from the Director to do so. <br /> <br />(a) Excavation Permit: An Excavation Permit is required by a Registrant to Excavate that <br />part of the Right-of-Way described in such permit and to hinder free and open passage over <br />the specified portion of the Right-of-Way by placing Facilities described therein, to the <br />extent and for the duration specified therein. <br /> <br />(b) Obstruction Permit: An Obstruction Permit is required by a Registrant to hinder free and <br />open passage over the specified portion of Right-of- W ay by placing Equipment described <br />therein on the Right-of-Way, to the extent and for the duration specified therein. An <br />Obstruction Permit is not required if a Person already possesses a valid Excavation Permit <br />for the same proj ect. <br /> <br />Subd. 2. Permit Extensions: No Person may Excavate or Obstruct the Right-of-Way beyond the <br />date or dates specified in the permit unless such Person (i) makes a Supplementary <br />Application for another Right-of-Way Permit before the expiration of the initial permit, <br />and (ii) a new permit or permit extension is granted. <br /> <br />Subd.3. Delay Penalty: In accordance with Minnesota Rule 7819.1000 subp. 3 and <br />notwithstanding subd. 2 of this section, the City shall establish and impose a Delay <br />Penalty for unreasonable delays in Right-of-Way excavation, Obstruction, Patching, or <br />Restoration. The Delay Penalty shall be established from time to time by City Council <br />resolution. <br /> <br />Subd. 4. Permit Display: Permits issued under this Chapter shall be conspicuously displayed or <br />otherwise available at all times at the indicated work site and shall be available for <br />inspection by the Director. <br /> <br />910.09: PERMIT APPLICATIONS: Application for a permit is made to the Director. <br />Permit applications shall contain, and will be considered complete only upon compliance with <br />the requirements of the following provisions: <br /> <br />(a) Registration with the Director pursuant to this Chapter; <br /> <br />(b) Submission of a completed permit application form, including all required attachments, <br />and scaled drawings showing the location and area of the proposed project and the location <br />of all known existing and proposed Facilities. <br /> <br />SJR-163902 <br />MU210-14 <br /> <br />10 <br />