My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7438
>
City Council
>
City Council
>
Resolutions
>
7000 - 7499 (2007-2009)
>
Resolution 7438
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 10:10:24 AM
Creation date
4/15/2009 4:17:26 PM
Metadata
Fields
Template:
MV City Council
City Council Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 7438 <br />CITY OF MOUNDS VIEW <br />COUNTY OF RAMSEY <br />STATE OF MINNESOTA <br />APPROVING CHANGE ORDER NO. 1 TO THE <br />CONSTRUCTION CONTRACT FOR THE <br />2009-2010 STREET AND UTILITY IMPROVEMENT PROJECT <br />WHEREAS, Mounds View experiences an ongoing maintenance problem <br />in its sanitary sewer system due to the intrusion of roots; and <br />WHEREAS, chemical treatment is currently used for control of the roots, <br />which provides only ashort-term and not a permanent solution; and <br />WHEREAS, slip lining segments of the sanitary sewer main for their full <br />length from manhole to manhole will provide a permanent solution for root control; and <br />WHEREAS, the approved budget for 2009 includes funding for slip lining <br />of sanitary sewer mains; and <br />WHEREAS, the 2009-2010 Street and Utility Improvement Project <br />provides an opportunity for performing the sanitary sewer slip lining in coordination with <br />the improvements being made to the City utility and street infrastructure; and <br />WHEREAS, the construction contract for the 2009-2010 Street and Utility <br />Improvement Project includes non-intrusive sanitary sewer maintenance work, including <br />spot repairs within several segments of sanitary sewer as well as slip lining for one full <br />length segment of sanitary sewer; and <br />WHEREAS, slip lining additional segments of sanitary sewer would <br />eliminate the need for spot repairs in those segments, resulting in a cost savings; and <br />WHEREAS, the unit price for the slip lining in the construction contract for <br />the 2009-2010 Street and Utility Improvement Project can be lowered if the volume of <br />the slip lining work in increased; and <br />WHEREAS, Change Order No. 1 to the construction contract for the <br />2009-2010 Street Improvement Project has been successfully negotiated with the <br />contractor, North Valley Inc., to allow for the increased slip lining work; and <br />WHEREAS, including the slip lining work for additional segments of <br />sanitary sewer to the 2009-2010 Street Improvement Project provides a cost effective, <br />efficient, and coordinated method of performing the slip lining work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.