My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 2007/01/22
MoundsView
>
Commissions
>
City Council
>
Minutes
>
2000-2009
>
2007
>
Minutes - 2007/01/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 9:23:45 AM
Creation date
7/20/2010 9:30:22 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
1/22/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council January 22, 2007 <br />Regular Meeting Page 9 <br />• Ms. Murlowski commented that Medtronic will have a wellness center and they will be using a <br />lot of the techniques that she plans to do so this should be addressed by the City. <br />Ayes - 5 Nays - 0 Motion carried. <br />C. County Road 10 Trailway Project: Segments 9& 10 - Review of Boardwalk <br />Bump Out <br />Public Works Director Lee explained that the bump out is estimated to cost $4,900 and to change <br />the plans and specs and bid documents would be approximately $1,200 to $1,500. He then asked <br />Council for direction to either continue moving forward with Option One to keep the bump out <br />or to move forward with Option Two amending the plans and specs to remove the bump out. <br />Mayor Mariy said that he would like to word the bids in the future so that there is not a fee to <br />change the bid like is happening in this instance. <br />Public Works Director Lee said that he does not know a way around getting the bid without the <br />bump out without amending the plans. <br />Mayor Marty said that it does not seem very complicated to do this and the fee to change the <br />plans seems a little high. <br />~ City Attorney Riggs explained that there must be bid standards to allow the contractors to bid <br />this competitively. <br />Public Works Director Lee explained that this bump out has been engineered with footings and <br />pilings and if there is just a straight boardwalk it needs to be determined whether those footings <br />are to be included or removed by the engineers. <br />Council Member Mueller asked whether the Council determined to ask for the bid with the bump <br />out. <br />Public Works Director Lee explained that it came from the Consultant from direction to include <br />things to make this project appealing to pedestrians to get them to use the trailway. <br />Council Member Flaherty said that he likes the bump out and feels it is a nice amenity for <br />residents. He then said that this was in the original feasibility report. <br />City Administrator Ulrich indicated that throughout the County Road 10 corridor project there <br />are a number of pocket parks and bump outs so there would be opportunities to scale down if <br />that is the desire of Council. <br />Mayor Marty indicated that he would like to leave it in especially since it would cost money to <br />• redo the plans to remove something from the p1an. He then said that perhaps Staff could ask the <br />contractors if they can do it without the bump outs when that time comes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.