My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-29-2007
MoundsView
>
Commissions
>
City Council
>
Minutes
>
2000-2009
>
2007
>
05-29-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 9:24:28 AM
Creation date
7/20/2010 9:46:05 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
5/29/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council May 29, 2007 <br />Regular Meeting Page 8 <br />Ayes - 4 Nays - 0 Motion carried. • <br />G. Resolution 7090, Approving a Service Contract for the City Hall <br />Elevator <br />Director Lee explained that City Hall has an elevator and there are several requirements and one <br />of them is to have the elevator inspected on a monthly basis. <br />Acting Mayor Stigney said that Metro is $15.00 per month less. <br />Council Member Flaherty asked what the benefits of All City would be over another contractor. <br />Director Lee indicated that the City has been contracting with All City and Staff is familiar and <br />comfortable with them. He then said that All City has been involved with the City's elevator <br />previously. <br />Council Member Mueller said that there is an emergency backup call provided in the contract. <br />Council Member Flaherty asked whether emergency call coverage is included in the Metro bid. <br />MOTION/SECOND: Mueller/Flaherty. To Postpone Resolution 7090, to the Next Council <br />Meeting to Allow Staff Time to Clarify the Bid Information. • <br />Ayes - 4 Nays - 0 Motion carried. <br />9. JUST AND CORRECT CLAIMS <br />Council Member Flaherty asked for information on the City Hall project expenditure. He then <br />said that he was told that this is the second to the last payment. <br />Director Lee explained that this would be the second to the last payment. <br />Council Member Flaherty asked about the Hillview Road matter. <br />Director Lee explained that this was one needed repair to the sewer system. <br />Council Member Mueller asked on Page 10 where the playground equipment was installed. <br />Director Lee indicated that this was for padding on the indoor equipment at the Mounds View <br />Community Center. <br />Acting Mayor Stigney asked about the webstreaming charge of $57738 because he was under <br />the impression that the City was trying something on a trial basis. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.