Laserfiche WebLink
VI. PUBLIC WORKS RELATED FEES <br /> CALL -OUT RATE SCHEDULE (used for all hourly -based fees in this chapter) <br /> Normal Business Hours for Call -out Rates 7:00 a.m. to 3:00 p.m., Monday thru Friday <br /> After -Hours for Call -out Rates 3:00 p.m. to 7:00 a.m., Monday thru Thursday <br /> Weekend and Holiday Hours for Call -outs 3:00 p.m. Friday to 7:00 a.m. Monday Holidays <br /> Standard Call -out Rate: Specified time $39 50 per hour specified <br /> conducted entirely within normal business <br /> hours <br /> After -Hours Call -out Rate: Specified time $69 85 per hour specified <br /> conducted entirely within or partially during <br /> after -hours <br /> Weekend /Holiday Call -out Rate: $99 120 per hour specified <br /> Specified time conducted during weekend <br /> and holiday hours <br /> RIGHT -OF -WAY MANAGEMENT FEES (Chapter 910) <br /> Registration Fee (Annually) $25 <br /> Excavation Permit Fees:* <br /> Hole Fee $125 per hole excavated <br /> Trench Fees (requires Hole Fee) $50 per 100 lineal feet of trenching beyond hole <br /> Trenchless Fees (req. Hole Fee) $25 per 100 lineal feet of utility installed using <br /> trenchless methods (HDD, etc.) <br /> Obstruction Permit Fees:* <br /> Obstruction Base Fee $50 per obstruction <br /> Lineal Obstruction Fee $7 per 100 lineal feet obstructed (in -line w/ traffic) <br /> (requires Obstruction Base Fee) per each week of obstruction <br /> Permit Extension Fee $20 <br /> Delay Penalty $10 per day <br /> Restoration Cost Security: Determined on <br /> a permit -by- permit basis by the PW Director Minimum security amounts: <br /> Hole Excavation $1,000 per hole excavated <br /> Trench Excavation $1,000 per 100 lineal feet of trenching beyond <br /> Trenchless Excavation hole <br /> $500 per 100 lineal feet of utility installed using <br /> trenchless methods (HDD, etc.) <br /> *Additional fees may be required for legal and consulting engineering costs incurred by the City <br /> 26 <br />