My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7700
MoundsView
>
Commissions
>
City Council
>
Resolutions
>
07500 - 07999 (2009-2012)
>
Resolution 7700
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 10:09:46 AM
Creation date
12/3/2010 3:50:59 PM
Metadata
Fields
Template:
MV City Council
City Council Document Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSTRUCTION SITE AND LAND DISTURBANCE FEES (Ord. 804 /Chapter 1303) <br /> Land Disturbance Permit Fees:* 50 cubic yards or less ............................$29 <br /> 51 to 100 cubic yards ............................$44 <br /> 101 to 1000 cubic yards $44 <br /> for the first 100 cubic yards, plus $21.00 for each <br /> additional 100 cubic yards or fraction thereof. <br /> 1001 to 10,000 cubic yards ......................$226 <br /> for the first 1000 cubic yards, plus $18.00 for each <br /> additional 1000 cubic yards or fraction thereof. <br /> 10,001 to 100,000 cubic yards ...................$377 <br /> for the first 10,000 cubic yards, plus $78.00 for each <br /> additional 10,000 cubic yards or fraction thereof. <br /> 100,001 cubic yards or more ...................$1,064 <br /> for the first 100,000 cubic yards, plus $44.00 for each <br /> additional 100,000 cubic yards or fraction thereof. <br /> *Additional fees may be required for legal and consulting engineering costs incurred by the City <br /> OTHER MISCELLANEOUS PUBLIC WORKS FEES <br /> (Actual time is rounded up to the nearest full hour) <br /> Overweight/Oversize Permit Fees $50 daily per vehicle <br /> $7-5 150 weekly per vehicle <br /> $300 seasonally peF vehic-le- <br /> $599 11000 annually per vehicle <br /> Emergency Utility Locates No charge if durinq business hours, otherwise <br /> actual time at call -out rate <br /> Call -out Charge for Contractor Negligence Actual time at Call -out Rates <br /> (lack of maintenance, traffic signs, etc.) <br /> Street Sweeping Charges Actual time at Call -out Rates $100 per hour <br /> Tree Removal/Trimming Contact City Forester <br /> Water Tower Communications Fees: <br /> Registration Fee (Annually) No charge <br /> Water Tower Access Fee No charge if during normal business hours, <br /> otherwise 1 hour at Call -out Rate per visit <br /> Plan Review and Inspection Fees Actual City, legal, and consulting engineering costs <br /> ($2,000 minimum) <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.