Laserfiche WebLink
NAME OF BIDDER ST,GE PRICE <br />Well Bids: <br />Bergerson- Caswell 1 36,975.00 <br />Minneapolis, Minnesota 2 300.00 <br />McCarthy Well Co. 1 <br />St. Paul, Minnesota 2 <br />Tri State Drilling Co. 1 42,456.00 <br />Keys Well Drilling Co. <br />St. Paul, Minnesota <br />Thein Well Co. <br />Clara City, Minnesota <br />Layne Minnesota Co, <br />Minneapolis, Minnesota <br />1 <br />2 <br />1 <br />2 <br />Schedule A Watermains and appurtenances, outside loop, north of <br />Highway #10. <br />Schedule B Watermains and appurtenances, inside loop, north of <br />Highway #10 and including highway crossings. <br />Schedule C Watermains south of Highway #10. <br />Well Bids: <br />Stage 1 <br />Stage 2 <br />Completion of well per specifications. <br />Development of well and payment for each 50 gpm <br />additional after initial test. <br />Alternate Water Mains Deduction for use of slip on joint pipe. <br />were tabled for future consideration. <br />S 32,950.00 <br />500.00 <br />2 750.00 <br />31,448.00 <br />500.00 <br />30,886.50 <br />500.00 <br />1 38,338.00 <br />2 400.00 <br />Upon motion duly made, seconded and carried the above bids <br />