Laserfiche WebLink
0J0O55 <br />PROCEEDINGS OF THE VILLAGE COUNCIL <br />VILLAGE OF MOUNDS VIEW <br />RAMSEY CCUNTY, MINNESOTA <br />The regular meeting of the Mounds View Village Council <br />was called to order by Acting Mayor Hodges at 8:10 P.M., <br />April 23 1962, at 2401 Highway #10. <br />Present were: <br />Acting Mayor: <br />Clerk• <br />Trustees: <br />Donald Hodges <br />Lloyd J. Blanchard <br />Perry Malvin <br />John L. Sullivan <br />Engineer: Les Knutson <br />Attorney: Richard Meyers <br />Treasurer: Irene Edberg <br />Adm. Deputy Clerk: Paul E. Boog <br />Public Works Walter Skiba <br />Absent: <br />Mayor: Allan B. Crane <br />(excused while in hospital) <br />Acting Mayor, Hodges opened the Woodale Drive Thoroughfare, <br />Public Hearing. <br />The Attorney explained the Council had ordered this hearing <br />to enable them to reserve or designate the North 30 feet of <br />this road and to be able to legally control the building of <br />any structures in this area. Designation of this 30 feet will <br />not give the Village right of way, but will assure the Village <br />of not having to purchase buildings for future road construction. <br />Mr. Grande, 5165 Long Lake Road who presently owns <br />this 30 feet as the Southern 30 feet of his property made <br />the following request: <br />"I respectfully request the Village to postpone action <br />on this hearing, es I have at the present time, a prospective <br />purchaser that would rather have the road through the center <br />of this property, so he may build on two sides of the proposed <br />road. If the Council dedicated this thoroughfare, it may well <br />stop this purchaser from buying." <br />After much discussion, the following action was taken: <br />Motion by Sullivan to continue this hearing until <br />May 2$, 1962, at 8:00 P.M. Seconded by Hodges. 4 Ayes <br />Mr. Sullivan requested Mr. Grande to have the <br />prospective purchaser present some type of proposal for this <br />property by the next regular meeting and the Council could <br />have the Village Planner study this and give his recommendations. <br />He further recommended thatthe Village request the Planner to <br />study this area and make road recommendationsto the Village. <br />There being no further action to be taken at this time, the <br />Acting Mayor declared the hearing closed. <br />Bids for water project 1962 -1 were opened and read. <br />After the Acting Mayor called 3 times for further bids, the <br />-4 bids received were then opened and read as follows: <br />Name Security Bid Comp. Time <br />RariNIT Brothers 5 Bond $27175700 as specified <br />Herbst Construction 5% Bond $2349.00 40 Cal. days <br />Horbal Construction 5 Bond $3379.00 as specified <br />