My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 1963/12/12
MoundsView
>
Commissions
>
City Council
>
Minutes
>
1960-1969
>
1963
>
Minutes - 1963/12/12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:56:49 PM
Creation date
2/7/2011 2:21:29 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
12/12/1963
Description
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
to try to hook up through the 'win City Arsenal, but that did not materialize <br />and we were ultimately so advised by letter from them in May of 1962. In <br />Feb. of 1960 our Village Engineer had been negotiating with Minneapolis through <br />the Arsenal system and there was no progress at that time with the City of <br />Minneapolis. We tried to secure funds and a loan was applied for to Chicago <br />but turned down. In July of 1960 the Engineering Committee of the N.S.S.S.D. <br />submitted a plan for drainage- -five different methods were actually proposed, <br />and we accepted the first one -that of Minneapolis sewer collection. <br />Mr. Meyers pointed out that we have been making progress and the contract <br />has been submitted with N.S.S.S.D. It has not been signed by the Village as <br />yet. We are now in process of holding a series of hearings for the internal <br />system, these hearings being required by law. Sewer improvement has to be <br />ordered by the Council, Mr. Meyers stated, There was the question raised in <br />the last meeting of referendum and Mr. Meyers explained that this can not be <br />done, according to law. <br />The hearing on December 5, 1963 was held for discussions on the proposed <br />main: interceptor system. This is the portion of the system the laterals are <br />hooked onto. The main part of the system is to be assessed area -wide throughout <br />the Village. The Council has six months from the hearing date in which to decide <br />whether or not improvements are to be ordered. <br />The areas for this hearing, December 12, are Pinewood, north of County <br />Rd. H2, Arden Avenue over to Long Lake Road and the area known as the "Twelve <br />Oaks" area north of County Road H. The hearing at this time is specifically <br />for laterals. Properties are to be assessed by the front foot for this particular <br />improvement. Mr. Meyers stated that if the Council decides there is enough <br />interest, as evidenced by these hearings and letters sent in, they would have <br />-i- <br />
The URL can be used to link to this page
Your browser does not support the video tag.