My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 1964/01/14
MoundsView
>
Commissions
>
City Council
>
Minutes
>
1960-1969
>
1964
>
Minutes - 1964/01/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:56:07 PM
Creation date
2/7/2011 2:21:34 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
1/14/1964
Description
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
by map would outlet at two specific points: Along County Road H <br />extended, immediately west to Trunk Highwy 10 and secondly, along <br />County Road H between Pleasant View and Knollwood. <br />Certain of the construction features proposed for sanitary <br />sewer construction are as follows: <br />1. Backcasting of the excavations. This makes it easier <br />to maintain traffic and the safety features are esp- <br />ecially attractive. <br />2. Alignment of the sewer lines, where it is necessary, <br />has been laid to conform with future street patterns <br />which the Council has unofficially adopted. <br />3. The matter of restoration of County roads and streets <br />is also included and the cost is considered. Restor- <br />ation of boulevards disturbed by the construction is <br />also proposed and this would mean grading, spreading <br />of top soil and seeding with grass -type seed. <br />Mr. Knutsen again stressed the fact that the intent of <br />the sanitary sewer improvement is to provide a minimum maintenance <br />utility at the lowest possible cost. <br />He continued the discussion with an explanation of the <br />manner in which the Village proposed to restore street surfacing <br />after the work is completed. It will be similar to that in <br />Richfield, but going one stop further in that the blacktop surface <br />would be sealcoated to provide a slightly more dense surface. He <br />stated that the streets should be allowed to condition for one <br />season before final surfacing and the County roads for two seasons. <br />This would provide a much better quality street and road and be <br />more economical for the Village. Restoration of the County roads <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.