Laserfiche WebLink
3 <br />Eigenheer addition bids were reviewed by Engineer Boehm. Irregularity <br />with Suburban Sewer and Water's bid having 5% instead of required 10%. <br />Low bid for clay and for plastic pipe noted. <br />M /S /P (Austad /Malvin) Accept base bid 01 by Morettini (low bid) for <br />clay pipe in amount of $94,373.00. <br />Comments on favoring plastic over clay and problem with bidding were <br />made by the Suburban representative. 5 Ayes <br />M /S /P (Johnson /Lang) To adjourn 9:07 Y.M. 5 Ayes <br />Respectfully submitted, <br />Ro ert_�A Wa ls er eer <br />Village Clerk <br />