Laserfiche WebLink
4- <br />Engineer Boehm reported on his review of the use of plastic pipe in buildings <br />of the Village. The Engineer feels Village action can authorize this use, <br />subject to recommended types and use considerations. <br />Mayor; Rustad requested the Engineer draft an amendment to the building code <br />permitting use of plastic pipe. <br />Engineer Boehm proposed that the Edgewood lift staion be replaced with gravity <br />line to new main line. <br />M /S /P. (Rustad /Lang) To direct Engineer to prepare preliminary report and cost <br />estimate on gravity, line installation. <br />M /S /P (Rustad /Lang) To prepare the final plans and specifications for the test <br />well program- HUD grant. <br />Plotting of lots between Groveland and Spring Lake Road and South of County Road I <br />was discussed. Only requirement will be to provide an abstract. <br />Charles Larson of the Planning Commission is setting up hearings on streets in <br />the northwest area of the Village. <br />M /S /P (Johnson /Walser) To adjourn at 9:58 P.M. <br />Respectfully submitted, <br />Robert A. Walser, <br />Village Clerk <br />