Laserfiche WebLink
3 <br />SCHEDULE D <br />500,000 GALLON ELEVATED WATER TANK <br />LUMP SUM BID ALTERNATE PROPOSAL <br />.HOLDER BID SURETY BASE PROPOSAL DEDUCT REMARKS <br />Pittsburgh -Des Moines Steel Co. 5% Bid Bond $163,000.00 No Bid #1 Add. <br />1015 Tuttle Street <br />Des Moines, Iowa 50308 <br />Chicago Bridge Iron Co. 5% Bid Bond $158,830.00 No Bid #1 Add. <br />332 South Michigan Avenue <br />Chicago, Illinois 60604 <br />Universal Tank Iron Works 5% Bid Bond $147,890.00 $151,875.00 #1 Add. <br />Rural Route 8, Box 360 <br />Indianapolis, Indiana 46231 <br />Bidder altered proposal form and inserted a lump sum bid on the alternate proposal. <br />SCHEDULE F <br />TWO PUMP HOUSES <br />PLANHOLDER BID SURETY LUMP SUM BID REMARKS <br />Petersen- Templin, Inc. 5% Bid Bond $101,113.00 #1 #2 Add. <br />Crystal, Minn. <br />Orvedahl Construction Inc. 5% Bid Bond $112,900.00 #1 Add. <br />''11 Country Club Drive <br />ieapolis, Minnesota 55427 <br />eberg Construction 5% Bid Bond $109,443.00 #1 #2 Add. <br />3092 North Rice Street <br />St. Paul, Minn. 55113 <br />DeDolph Construction Co. 5% Bid Bond $122,000.00 #1 #2 Add. <br />771 West 7th Street <br />St. Paul, Minnesota 55102 <br />Dupre Construction Company 5% Bid Bond $123,000.00 #1 #2 Add. <br />535 East Cottage <br />St. Paul, Minnesota 55101 <br />PLANHOLDER <br />Petersen Templin, Inc. <br />Crystal, Minnesota <br />Acton Construction <br />Route 1 Box 256A <br />Hugo, Minnesota 55038 <br />'enberg Construction <br />1 Marshall Avenue <br />Paul, Minnesota 55104 <br />SCHEDULE G <br />TWO WATER TREATMENT PLANTS APPURTENANCES <br />BID SURETY LUMP SUM BID REMARKS <br />5% Bid Bond $302,777.00 #1 #2 Add. <br />5% Bid Bond $312,218.00 #1 #2 Add. <br />5% Bid Bond $324,600.00 #1 #2 Add. <br />210 Days <br />