My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 1975/08/25
MoundsView
>
Commissions
>
City Council
>
Minutes
>
1970-1979
>
1975
>
Minutes - 1975/08/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 1:47:54 PM
Creation date
2/7/2011 2:24:13 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
8/25/1975
Description
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 <br />August 25, 1975 <br />Attorney Meyers said that in order to do correction of any defect.if any, <br />in the city hall construction the city will authorize these change order <br />but not in the normal sense of a change order in addition or subtraction <br />of the building that would normally be handled by Change Order. <br />Councilman Baumgartner questioned Change Order #4. He said he recalled <br />that the report from Twin City Testing calls for certain materials to <br />be used around drain tiles. He did not see that in the material list. <br />Mr. Walijarvi said the drawing that goes with it should be attached <br />to the change order. <br />Councilman Baumgartner said he noted that the vertical cast iron pipe <br />is now perforated, is this part of the change? <br />Mr. Walijarvi said it will be installed. This was part of the mechanical <br />contractor's job and he should have completed this is the first place. <br />Councilman Shelquist commented on change order No. 3 that in addition to <br />the dewatering charges listed here that future change orders would <br />probably request additional charges. He said Change Order #4, second <br />sentence did not include additional dewatering located in the basement <br />and questioned if it was dry enough to make changes with the amount of <br />water flowing at the present time. <br />Mr. Walijarvi said that B -E and Twin City Testing indicated the work <br />called for in change orders No. 3 and 4 could be done with the existing <br />dewatering system on the exterior of the building. He said that once <br />the work begins they might find out otherwise but at present they <br />don't expect any localized dewatering inside the basement. <br />ASP (Baumgartner- Hodges) to accept change order No.3 and No. 4 and <br />accept Attorney Meyers qualifying statements. <br />Administrator Achen asked Engineer Bearden to talk to Orfie and Sons on <br />the cost problem B -E has with them. <br />Mr. Walijarvi said they had told him it would be $350 a day for one <br />month but when they were contracted for it was $700 a month after the <br />wells were pit in. <br />Shelquist Aye <br />Pickar Aye <br />Baumgartner Aye <br />Hodges Aye <br />Johnson Aye <br />Mayor Johnson asked why change order No. 5 was necessary. <br />Administrator Achen said under specifications there is no security for the <br />police department in the evenings when the city is open for public meetings, <br />etc. Mayor Johnson asked if the plans called for a grill. Administrator <br />Achen said, "No, it was contemplated but according to the architect it was <br />removed from the plan at the city's request." <br />
The URL can be used to link to this page
Your browser does not support the video tag.