My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
gr00090_000006_pg75-2
MoundsView
>
Commissions
>
City Council
>
Minutes
>
MNHistoricalSocietyFiles (CC Minutes page-by-page 1958-1981)
>
gr00090_000006
>
JPG
>
gr00090_000006_pg75-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 12:39:57 PM
Creation date
4/12/2011 8:51:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINNEAPOLIS OFFICE <br />1446 County Road ".I" <br />Minneapolis 21, Minnesota <br />TEL. SUnset 4-9346 <br />COMSTOCK & DAVIS, INC. <br />CONSULTING ENGINEERS <br />June 12, 1961 <br />Honorable Mayor and Village Council <br />c/o 7r. John Blanchard, Clerk <br />Village of 7ounds View <br />5499 Adans St. N. E. <br />New Bright on 12, 7 inne s ot a <br />Gent le men : <br />CERTIFICATE OF TEE ENGINEER <br />ST. PAUL OFFICE <br />R.F.D. 2 <br />Rosemount, Minnesota <br />TEL. ST. PAUL <br />Glenview 4-2557 <br />We hereby submit Estimate No. 5 for Herbst Construction Company, <br />8180 Eastwood Drive, Minneapolis 21, Minnesota for work completed <br />and materials on hand, this date, for the construction of <br />Waternaln Improvement Project No. 1960-3, according to contract. <br />Completed Work and Materials on Hand: <br />3,5E1 <br />29,471 <br />46 <br />3,994 <br />280 <br />280 <br />2 <br />55 <br />6 <br />48 <br />Lin. Ft. 8" GIP <br />Lin. Ft. 6" CIP <br />Fire Hydrants <br />1" Copper Water Services <br />Corporation Cocks <br />Stop Cocks and Boxes <br />8" Gate Valves and Boxes <br />6" Gate Valves and Boxes <br />8 x 8 x 6" Tees <br />6 x 6 x 6" Tees <br />3 8 x 8 x 6 x 6" Crosses <br />10 6 x 6 x 6 x 6" Crosses <br />5 8" Plus <br />22 6" Plugs <br />27 6" 45° Bends <br />11 6" 22 1A° Bends <br />5 8" 22 1/2° Bends <br />Total Completed Work and Materials <br />Less: 1C4 retained <br />Amount Earned to Date <br />Less: Estimate No. 1 <br />Estimate No. 2 <br />Estimate No. 3 <br />Estimate No. 4 <br />Total Paid to Date <br />AMOUNT Nai DUE <br />33,909.03 <br />86,599.80 <br />1,920.60 <br />_L 1:).80 <br />aa. ,. 6 <br />"Nmenwall=WAW <br />130,348.23 <br />on Hand <br />• • . • • • • • • • • <br />CC: Herbst Construction Co. <br />a <br />a <br />4.50 <br />3.50 <br />230.00 <br />2.00 <br />8.00 <br />20.00 <br />130.00 <br />100.00 <br />50.00 <br />45.00 <br />58.00 <br />48.00 <br />12.00 <br />10.00 <br />30.00 <br />30.00 <br />30.00 <br />$ 16,141.50 <br />103,148.50 <br />100580.00 <br />17,988.00 <br />2,240.00 <br />5,600.00 <br />260.00 <br />5,500.00 <br />300.00 <br />2,160.00 <br />174.00 <br />480.00 <br />60.00 <br />220.00 <br />810.00 <br />330.00 <br />150.00 <br />166,142.00 <br />16 614 20 <br />0_49,527.80 <br />130,648.23 <br />. . . . i 18,879.57 <br />Respectfully submitted, <br />COT,FSTOCK & <br />INC. <br />E. <br />9.01.,srseugtan.11e. <br />Comstock, <br />E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.