Laserfiche WebLink
2.. <br />June 26th $ 1961 meeting continued - <br />3. The Turbomatic Co. has nest built a unit of this nature. Conse- <br />quently they have no service record of the performance of this <br />unit which they propose. <br />00007? <br />4. In water treatment and sanitary sewer plant engineering* it is <br />not uncommon to investigate the possibility of the use of egip- <br />ment other than that which is originally proposeds However* in <br />a circumstance of this nature there is generally a pilot plant <br />history to be relied upon in considering the performance of a <br />new unit. In the case of the Turbomatic proposal there is no <br />pilot plant data available, as no pilot plant has ever been con- <br />structed or tested to our knowledge. <br />5. There have been instances where untested equipment has been <br />installed in a sewage treatment plant. In one case the munici- <br />pality was allowed to operate the equipment for a period of three <br />years before payment was required. This permitted the accumula- <br />tion of a sufficient operational history to determine the satis- <br />factory operation of the unit. <br />Another in.s t anb e was an arrangement whereby a guarantee was pro • <br />vided the municipality f"or a type of equipment which was less <br />expensive than that originally proposed* This equipment was <br />not considered to be equal to the originally proposed item and <br />after a period of attempted operation for two years, it was dis- <br />covered that the bid item did not perform the job intended. <br />After the two year period the equipment was removed. In this <br />instance the municipality never did obtain the originally pro- - <br />posed equipment and the operation of the then substituted equip- <br />ment was more costly than the municipality would have paid for <br />the operation of the originally specified equipment. <br />The equipment on the second bid by the Layne-Minnesota Co. has <br />had a successful operational history over a period in excess <br />of 10 years. One feature of the unit that is more favorable <br />is that it can be back washed with raw water while the unit is in <br />service. <br />The sum of ,2k , 250 difference in the low bid of the Turbomatic Co. <br />and the second bid of the Layne - Minnesota Co. is extremely attractive <br />however, we cannot concientiously advise the village to accept the lo. <br />bid in view of the fact that there is no similar unit in operation no_: <br />any pilot plant data. Recently, C-is bid differential has occurred <br />in four previous instances. In each case a different engineering fir: ~, <br />firm was involved. The recommendation of the engineering firm <br />in each case was that the Turbomatic bid should not be considered <br />for numerous . stated reasons. Therefore., ye believe that our <br />statement cannot be altered favoring the low bid. <br />