Laserfiche WebLink
-2- OdOOi7 <br />The Mayor read the Police Report for May and it was placed <br />on file. <br />Motion by Crane to appoint John Sullivan to the Governor's <br />Committee on Metropolitan Problems. Seconded by Hodges. 4 Ayes <br />Sullivan abstaining. <br />Mr. Hodges reported that the backstop hoods and the <br />playground equipment should be erected within the next two weeks. <br />The drainage problem of Mr. A. Trelstad at 7761 Eastwood <br />Road was referred to Mr. Sullivan and the Village Engineer <br />for study and recommendation. <br />The Clerk was instructed to request the Highway Department <br />to construct a barricade, possibly of guard posts and cable at <br />the intersection of T.H. #10 and St. Stephens Street, and County <br />Road H -2, west corner, where automobiles are crossing in back <br />of thru stop sign. <br />Letter to go to Mr. E.J. Mc Cubrey, District Engineer, Dis- <br />trict 9, 1246 University Avenue, St, Paul, Minnesota. <br />Mr. Skiba was instructed to pick up easements for the <br />drainage through the Terrace Drive Pinewood Area. <br />Mr. Sullivan will contact Mr, Ketter of Ramsey County <br />to insist on immediate action on Pinewood Drive. <br />Mr. Knutson is to contact the Northern States Power <br />Gas Company regarding the sodding and seeding of Terrace Drive <br />after complaints received from citizens. <br />Motion by Sullivan to set an informal hearing on June 25 <br />for a throughfare plan in the area bounded by Spring Lake Park <br />Road, Groveland Road T.H. #10 and County Road "I ". Notice to <br />be mailed to the property owners affected and to the Council <br />of Spring Lake Park. Seconded by Crane. 5 Ayes <br />Motion by Crane to approve change order #1 on water <br />project 1961 -1, an addition of $411.00 as recommended by the <br />Engineer. Seconded by Hodges. 5 Ayes <br />Motion by Crane to accept Engineer's recommendation and <br />make final payment on well #2 in the amount of $6,559.23. <br />Seconded by Malvin. 5 Ayes <br />The Engineer was instructed to request information regarding <br />the building of zeds over the St. Paul water line. <br />The drainage problem at Greenfield and Greenfield Place <br />was referred to John Sullivan for action. <br />Mr. Sullivan reported on a meeting that he and Milt Stole, <br />Planning Commission Chairman, had with Mr. H. Dahlgren of Midwest <br />Planning regarding a bill submitted by the consulting firm. <br />Motion by Sullivan to pay bill dated May 8, 1962, less the <br />amount of $240.00,(time spent on correcting land use map), on the <br />basis that this work was covered under a previous contract. <br />The net bill will be $593.75. Seconded by Malvin. 5 Ayes <br />The Clerk was instructed to mark check as full and complete <br />payment as of April 17, 1962. <br />