My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
gr00090_000010_pg132-007
MoundsView
>
City Council
>
City Council
>
Minutes
>
MNHistoricalSocietyFiles (CC Minutes page-by-page 1958-1981)
>
gr00090_000010
>
gr00090_000010_pg132-007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 1:13:45 PM
Creation date
4/12/2011 8:57:26 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
He emphasized the point that this is not a complete storm sewer <br />system, but would convey surface waters from road surfaces and <br />road ditches and successfully drain all low areas in the community. <br />He pointed out the system as proposed would serve the needs <br />of the community at present and in the future. The capacity is <br />adequate to provide for additional development, residential and <br />commercial. It is of sufficient depth to permit lateral lines to <br />be connected to the interceptor. <br />Another feature of the proposed construction is the probability <br />that when trenches are opened the contractor will close them as soon <br />as possible to provide use for traffic, etc., with as little incon- <br />venience as possible. <br />There is the question of restoration of county roads and village <br />streets. The proposal is to restore all disturbed by this constructi,.n. <br />Boulevards will be restored with suitable lawn grass. The intent is <br />to provide for minimum maintenance with least possible cost. <br />Maintenance and future construction is of the type which can <br />be handled by Village forces with a minimum of equipment. He pointed <br />out that street surfacing cannot follow right away as time should, be <br />allowed for the fill to settle and be packed down by use for a year. <br />Then the complete resurfacing of roads can be done if the Council so <br />agrees. This plan will save the Village money and result in ultimate- <br />ly better quality. During the course of construction some of the <br />County roads will be disturbed. This matter will have to be resolved <br />with Council and the County. <br />The Council instructed that estimates be prepared on certain <br />types of equipment for repairing breaks in lines, etc., and he <br />--4-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.