My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
gr00090_000016_pg139
MoundsView
>
City Council
>
City Council
>
Minutes
>
MNHistoricalSocietyFiles (CC Minutes page-by-page 1958-1981)
>
gr00090_000016
>
gr00090_000016_pg139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 2:00:08 PM
Creation date
4/12/2011 9:04:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Motion by Malvin to concur with the Engineer's recommendation <br />and award the contract for Water Improvement Project 1965 -3 to <br />Walbon Excavating Company. Bid was $7,000.00. Seconded by La Vaque. <br />5 Ayes. <br />The Engineer reported that there would probably be a three <br />week delay in the actual awarding of this contract due to some <br />problems with Chies Brothers Construction doing work on Silver Lake <br />Road project under the Ramsey County Contract. <br />After complaints from residents regarding the condition of <br />Raymond Avenue due to heavy equipment abuse by National Funds Contractor <br />the Attorney was directed to contact Mr. Foss and inform him that this <br />equipment would no longer be allowed on Village roads. The Engineer <br />was instructed to examine Raymond Avenue for possible serious damage <br />due to this equipment: <br />The Engineer presented the preliminary report for Sanitary <br />Sewer Project 1965 -5, the Long Lake Road Extension. <br />Motion by Blanchard to accept the preliminary report on <br />Sanitary Sewer Project 1965 -5 and call a public hearing on the improvement <br />for October 11, 1965 at 9:00 P.M. Seconded by Hodges. 5 Ayes. <br />The Mayor opened the Public Hearing called for this night <br />at 9 :00 P.M. - Mueller Rezoning. <br />The Clerk read the legal notice published and mailed. Mr. <br />Mueller stated that some of the uses for this land were for a service <br />station} meat market and a dairy store. <br />The Mayor called for objectors and they are as follows: <br />1. Mr.. Joe Walker - 2736 County Road H -2 - object to service stations. <br />There were no other objectors. <br />Five persons spoke in favor of the proposal. <br />The Mayor closed the hearing @ 9:25 P.M... <br />Motion by Malvin to grant the rezoning request for tracts <br />G and F, Register Land Survey # 153 and the West 180 feet of Lot # 4 <br />Block # 1 Mueller Addition. Section # 7, Township # 30, Range # 23 <br />from R -3 to B -3 and R -3 subject to the application and approval <br />of a building permit. Seconded by Hodges. 5 Ayes. <br />Mr. E. Dropps proposal for his property on County Road H -2 <br />was referred to the Planning Commission. <br />Irri file) <br />Mr.. Rustad read the August Police and Animal Control reports. <br />Mr.. Skiba was directed to keep a close check on the replacement <br />of street signs after sewer installation. <br />Mr. La Vaque read the water report for August_. <br />Motion by La Vaque to send a work order to N.S.P. for <br />a 6000 lumen street light to be installed at the intersection of <br />Sherwood and Johnson Road.. Seconded by Rustad. 5 Ayes. <br />The Planning Commission minutes for August wei read and <br />filed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.