My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
gr00090_000017_pg58
MoundsView
>
City Council
>
City Council
>
Minutes
>
MNHistoricalSocietyFiles (CC Minutes page-by-page 1958-1981)
>
gr00090_000017
>
gr00090_000017_pg58
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 2:07:32 PM
Creation date
4/12/2011 9:06:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.) 3 X66 — <br />GOPHER ELECTRIC CONTRACTORS, INC. <br />COMMERCIAL • INDUSTRIAL • RESIDENTIAL <br />1410 COON RAPIDS BLVD., MINNEAPOLIS, MINN. 55433 <br />Phone: 755 -1930 <br />June 8, 1966 <br />Moundsview Village Council <br />2401 Highway 10 <br />Moundsview, Minne sota <br />Gentlemen; <br />This letter is a follow up of your request at the meeting of June .6, 1966 <br />with regards to our services and charges. I believe we discussed the extent <br />that our electrical service can be of value. <br />The following is our schedule of hourly rates and also when overtime hours <br />come into effect: <br />Hourly rate <br />Monday through Friday <br />Monday through Friday <br />Monday through Friday <br />Saturday and Sunday <br />$11.00 per hour <br />8:00 - 4:30 Straight time <br />4 :30 - Midnight Time and one half <br />Midnight - 8 :00 Double time <br />Double time <br />On all calls the time begins from the hour dispatched until return. Material <br />direct from the factory or distributor is billed at 15% above our actual <br />invoice cost. Material from our stock is billed at 15% above low book pricing. <br />We discussed that evening the availability of a three phase generator. W'e <br />do not have a unit of our own, but Minnesota Onan, the local distributor of <br />Onan Company, has available a 30 KW three phase four wire generator.for rent <br />at the following fee schedule: Two days - $75.00; weekly - $150.00; <br />monthly - $450.00. In an emergency we are not always sure that their rental <br />unit will be available or at this point whether the unit is large enough to <br />the load of your sites. These are some of the problems that should <br />be checked into prior to an emergency condition presenting itself. <br />As I mentioned, I would personally like to familiarize myself with the job <br />sites and their electrical systems so there is some prior knowledge as to <br />location and probable needs. <br />If your office sees fit to call on Gopher Electric for this maintenance <br />service or any other electrical needs, we will be pleased to be oriented <br />by your Engineer or department head. If there are any further questions we <br />may answer, please do not hesitate to call us. <br />Yours very truly, <br />GOPHER ELECTRIC CONTRACTORS, INC. <br />Gib <br />Carl H. Gau4e, Jr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.