Laserfiche WebLink
- 4 - <br />Engineer Boehm's Report <br />Engineer Boehm presented list of bids from bid opening at 12 noon today. <br />PLANHOLDER <br />Layne- Minnesota Company <br />3147 California Street N.E. <br />Minneapolis, Minnesota 55418 <br />Thein Well Company, Inc. <br />Box 429 <br />Clara City, Minnesota 56222 <br />Mueller Bros. Well Company <br />Gaylord,Minnesota 55334 <br />Keys Well Drilling Company <br />413 North Lexington Parkway <br />St. Paul, Minnesota 55104 <br />Bergerson- Caswell, Inc. <br />13120 Wayzata Blvd. <br />Minnetonka, Minnesota 55343 <br />BID DEPOSIT LUMP SUM BID <br />Bond 10% <br />Bond 10% <br />Cert.Check <br />$ 1,250.00 <br />Bond 10% <br />$ 8,480.00 <br />$ 5,620.00 <br />$ 9,753.10 <br />$ 7,790.00 <br />Bond 5% $ 6,845.00 <br />MSP (Blanchard /Johnson) To accept the low bid of Thein Well Company, Inc. <br />for $5,620.00 for repair of Well #1. <br />MSP (Malvin /Hodges) To authorize Attorney to return the certified check <br />for $1,250 from Mueller Bros. Well Company. <br />Engineer reported that test well drilling should be complete in a week to ten <br />days. <br />Council recommended the Engineer attend a meeting at the Golder Valley Highway <br />Headquarters on federal aid for streets. <br />5 Ayes <br />5 Ayes <br />MSP (Malvin /Hodges) To adjourn at 9:43 P.M. 5 Ayes <br />- espectfully Submitted, <br />Dennis S. Zy11a, <br />Clerk- Administrator <br />