My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
gr00090_000022_pg30
MoundsView
>
City Council
>
City Council
>
Minutes
>
MNHistoricalSocietyFiles (CC Minutes page-by-page 1958-1981)
>
gr00090_000022
>
gr00090_000022_pg30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 2:27:11 PM
Creation date
4/12/2011 9:11:18 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />Councilman Blanchard's Report <br />Councilman Blanchard asked if signs were put up on Ardan Avenue. Walter Skiba <br />said they weren't needed because road was dry. <br />Attorney Meyers' Report <br />Attorney Meyers stated he had some papers on a highway easement for Robert <br />Eigenheer. We in turn are rescinding an existing easement on Lot 14 Block 2 <br />Greenfield Addition. Referred to the Engineer for study. <br />Ordinance #164, passed March 10, was presented by Attorney Meyers. <br />Engineer Boehm's Report <br />Engineer Boehm presented and read the preliminary report and cost estimate for <br />Water and Sewer Improvement Project 1969- 3(midway between Woodlawn and Edgewood <br />from County Road I to Hillview). Estimated total cost $61,150.00. Front foot <br />costs: sewer $6.06, water $5.30, street and drainage $9.75. <br />Some discussion on proposed project by Harstad, Gustafson and Lund. <br />MSP (Blanchard /Rustad) To accept the preliminary report. <br />MSP (Blanchard /Rustad) To set the improvement hearing for Project 1969 -3 <br />for April 21 at 7:00 P.M. <br />Engineer reported that we should have one good well on Edgewood and Bronson <br />and possibly another. <br />Commenting on the complaints about drainage on Long Lake Road between Sherwood <br />and Hillview Engineer Boehm stated he had met with the County and as soon as <br />the snow melts they will meet with the Council to discuss cost participation. <br />Thein Well Company moved in today to begin the repair of Well #1. <br />Walter Skiba was authorized to begin checking into replacing street signs. <br />MSP (Johnson /Hodges) To adjourn at 8:53 P.M. <br />Respectfully Submitted, <br />Dennis S. Zyll <br />Clerk- Administrator <br />4 Ayes <br />4 Ayes <br />4 Ayes <br />
The URL can be used to link to this page
Your browser does not support the video tag.