My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
gr00090_000023_pg077
MoundsView
>
Commissions
>
City Council
>
Minutes
>
MNHistoricalSocietyFiles (CC Minutes page-by-page 1958-1981)
>
gr00090_000023
>
gr00090_000023_pg077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 2:30:05 PM
Creation date
4/12/2011 9:12:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Present: <br />Mayor Rustad <br />Councilman Malvin <br />Councilman Johnson <br />Councilman Hodges <br />Councilman Blanchard <br />Also Present: <br />Clerk- Administrator Zylla <br />Attorney Meyers <br />Engineer Boehm <br />Inspector Skiba <br />Mr. William Werner, 2101 Sherwood Road, desired information on whether any of <br />his land would be taken for Fairchild Avenue next to Eigenheers 4th Addition. <br />Engineer Boehm stated that the project was feasible without disturbing Mr. <br />Werner's property. Discussion on street width ensued. Mr. Werner has a <br />wildlife refuge on the north side of his property that he wants preserved. <br />MSP (Blanchard /Johnson) That the Village Council of Mounds View will not <br />authorize the taking, touching, or disturbing of Mr. Werner's property in <br />any way for Project 1969 -4 and the related street project, nor will they <br />seek permanent or temporary easements. <br />Engineer Boehm reported bids were opened at 12 noon on Project 1969 -4. <br />Engineer stated that the low bid was about 1/3 higher than estimated but <br />he felt his estimate was a little low. He also felt to readvertise would <br />cause the bids to be higher the second time if the bidders felt they <br />bidded in good faith the first time. <br />MSP (Blanchard /Hodges) To accept the bids for Project 1969 -4 and to award <br />the bid to the lowest responsible bidder, Randall Brothers $59,000.00. <br />PLANHOLDER SURETY LUMP SUM BID <br />Walbon Excavating Company St. Paul $76,601.00 <br />3242 Highway #8 Farmers & Mech. <br />Minneapolis, Minn. 55418 10% <br />Lametti & Sons, Inc. Federal Ins. <br />2560 North Cleveland Avenue 10% <br />St. Paul, Minn. 55113 <br />Randal Bros., Inc. <br />3400 Silver Lake Road <br />Minneapolis, Minn. 55418 <br />$72,307.20 <br />Certified Check $59,000.00 <br />$5,900.00 <br />Sandstrom & Hafner, Inc. The Home Indemnity $64,100.00 <br />7400 Highway #65 Company <br />Minneapolis, Minn. 55432 107 <br />MSP (Malvin /Johnson) To adjourn at 7:40 P.M. <br />spectfully Submitted, <br />1/4, i4AWG <br />Dennis S. Zyllbv, <br />Clerk- Administrator <br />5 Ayes <br />5 Ayes <br />5 Ayes <br />
The URL can be used to link to this page
Your browser does not support the video tag.