Laserfiche WebLink
- 4- <br />Engineer Boehm's Report <br />Engineer Boehm reported on a sewer problem at Woodcrest and Long Lake Road. It <br />appears that a riser has settled into the pipe which is 28 feet deep. <br />MSP (Rustad /Blanchard) To authorize American Pipe Services to inspect and <br />repair the damaged pipe. <br />Inspector Skiba is to check the cost of having Clark and Moores do some digging <br />at the break on behalf of the Village, rather than tying up our crew for assistance <br />in the repair. <br />MSP (Rustad /Hodges) To accept the final plans and specifications for Sanitary <br />Sewer and Water Projects 1971 -1 and 1971 -la. <br />MSP (Blanchard /Hodges) To set the bid date for Sanitary Sewer and Water Projects <br />1971 -1 and 1971 -la for June 21st at 12 noon. <br />MSP (Neisen /Rustad) To adjourn at 10:02 P.M. <br />Respectfully Submitted, <br />Dennis S. Zylla, <br />Clerk- Administrator <br />5 Ayes <br />5 Ayes <br />5 Ayes <br />5 Ayes <br />