Laserfiche WebLink
Engineer Bearden informed the Council that he had prepared a plan for Smith <br />Transfer for the storm sewer extension and submitted it to Rice Creek Watershed <br />District and as far as the grades he had been asked to check in Red Oak Estates <br />#2 the profiles of the three existing ditches have been checked and the <br />information can be given to the developer to get his response. Mayor Neisen <br />said instead of just giving it to him he hoped the Engineer would call him <br />and set up a meeting with him on the site and ask him to give dates of when <br />this will take place and get it back to the Council before the next meeting, <br />Darcie Bosell wanted to know if this had anything to do with the open sewer <br />pipe and if it had been checked at all. She wondered if that was ever going <br />to be screened. Mayor Neisen thought it was in the motion from the last meeting for <br />the Engineer to check it. He also thought one should be in :he project, and <br />should be brought up to Mr. Harstad. Engineer Bearden said he would bring <br />it to Mr. Harstad's attention. <br />Darcie Bosell also wondered if the grade was followed correctly by the developer <br />so that the drainage is proper. Mayor Nelsen replied that it is a little high <br />in one or two spots and low in some and said that it would have to be corrected, <br />She said that persons north of her had some standing water in their yards and <br />Mayor Neisen said there was more grading to be done to the north. <br />Frank Gabrysh asked what was happening with the Pastor Enterprises project and <br />Mayor Neisen replied that they informed Councilman Johnson they would be going <br />by the 15th of July. Councilman Johnson stated that they were having a problem <br />with the financing and the financers are making him document everything. <br />MSP (Pickar- Hodges) To adjourn at 10:46 P.M. 5 Ayes <br />Respectfully Submitted, <br />Ce c.J h/ . <br />Maridelle Wamhoff, <br />Administrative Secretary <br />