My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
gr00090_000034_pg096
MoundsView
>
Commissions
>
City Council
>
Minutes
>
MNHistoricalSocietyFiles (CC Minutes page-by-page 1958-1981)
>
gr00090_000034
>
gr00090_000034_pg096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 3:35:12 PM
Creation date
4/12/2011 9:38:05 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-3- <br />Mr. Gum, 7770 Greenwood Drive asked what the City intended to do with the existing <br />police station. Mayor Neisen said it would become storage, and maintenance repair <br />shop. <br />Mayor Neisen explained that the proposed building is planned so that it could be <br />expanded in the future if there ever is a need, but Council does not anticipate <br />any further need at this time. <br />Mr. Russell Paul, 7940 Greenfield Avenue, asked if it wouldn't be cheaper to <br />build two stories instead of spreading out. <br />Mayor Neisen explained that this would not pertain to public buildings for <br />various reasons, such as handicapped persons, fireproofing, elevators, etc. <br />A representative from Earl Weilke & Sons asked if this bid was being let <br />just on base bid and alternate #1. <br />Mr. Walijarvi listed the different alternatives and explained what they were. <br />He recommended that the Council take the base bid and the lower level. <br />MSP (Neisen - Pickar) To draw up contracts subject to posting of bonds with <br />B & E Enterprises, (General Construction), bid price $221,310. with Alternates <br />Al (lower level), A2 (Plaza), and A3 (Rm. #119). C ®O. Carlson Air Conditioning, <br />bid price $109,578 with alternates M1 and M3, Maurie St. Martin Electric (Electrical) <br />bid price $37,965 with alternate El (lower level). 5 Ayes <br />MSP (Johnson- Baumgartner) To amend original motion to include alternate E2 <br />(Plaza Lighting) for $3,808. Pickar Aye <br />Baumgartner Aye <br />Johnson Aye <br />Hodges Aye <br />Neisen Aye <br />Roll call was taken on original motion. <br />Pickar Aye <br />Baumgartner Aye <br />Johnson Aye <br />Hodges Aye <br />Neisen Aye <br />Completion date will be sometime around May of 1975. <br />MSP (Hodges - Pickar) To adjourn at 9:15 P.M. 5 Ayes <br />Mayor Neisen called the special meeting on the semiphore installation on Highway <br />#10 to order. <br />Mayor Neisen introduced Glen Van Wormer, District 9, Minnesota Highway Department. <br />Mr. VanWormer stated that their basic proposal was to install two additional <br />signals along Highway #10, one on County Rd. H2 and Highway #10 and one on County <br />Rd. I and Highway #10. <br />
The URL can be used to link to this page
Your browser does not support the video tag.