-5- <br />July 14, 1975 <br />MSP(Baumgartner - Hodges) to approve the lot split as currently presented <br />(100 X 150, 88.11 X 150, 100 X 150). <br />Baumgartner Aye <br />Hodges Aye <br />Shelquist Naye <br />Pickar Aye <br />Johnson Naye <br />Meeting recessed at 10:15 p.m. <br />Mayor Johnson called the meeting back to order at 10:32 p.m. <br />Mayor Johnson announced the Mr. Herbst was present to request a building <br />permit for Perkins Cake and Steak restaurant. <br />Mr. Kasma, engineer for Perkins Cake and Steak, handed out a report of <br />work to be done at the request of the City per memo dated July 14, 1975. <br />Mr. Kasma explained the present and future requests and recommendations <br />listed in the letter. He said he spoke to State of Minnesota District 9 <br />hydraulic engineer and he agreed it is the State's responsiblity to put <br />in an open -end flare section on the north side of the street under- <br />ground and they will resolve the problem. <br />Mr. Kasma is hoping to keep the ditches open with a catch basin and swale <br />because they have more storage capacity. <br />Mr. Herbst will maintain sewer and water lines until the street is <br />dedicated. <br />Mr. Kasma suggested they use only a 12" pipe which is the minimum allowable <br />for storm sewer because no other property will drain into the 12" catch <br />basin. <br />Engineer Bearden said the 12" catch basin is sufficient. <br />Mr. Kasma said they will have inside storage of trash. <br />MS (Baumgartner- Hodges) to approve Perkins Cake and Steak building <br />permit upon Mr. Herbst agreeing to the development contract. Attorney <br />Meyers to draw up development contract encompassing all of future require- <br />ments agreed to by Mr. Herbst in the letter of Toltz, King, Duvall, <br />Anderson F Assoc., Inc. dated July 14, 1975. <br />a. construct through street from TH 10 to County Road H <br />to City standards including 44 foot street with concrete <br />curb and gutters. <br />b. construct "looped" water system including connection <br />to existing 6 -inch watermain along TH 10. <br />c. construct storm sewer in conjuntion with street to <br />serve entire Herbst property. <br />d. construct sanitary sewer line to serve property including <br />extra depth to extend sanitary sewer to eliminate the sewage <br />pumping station located near the northwest corner of Herbst <br />property. <br />