Laserfiche WebLink
December 21, 1976 Page 5 <br />MSP (Pickar-Baungartner) to authorize ti a Administrator to hire <br />someone for the temporary position of clerk-typist through the end <br />of January and make a selection for a permanent employee to begin <br />February 1, 1977. <br />5 ayes <br />Administrator Achen stated he will be on vacation from tonnorow evening <br />through the evening of December 29, 1977. <br />clCINEE9 ruppi\ro's PsEPOP,T Engineer Hubbard stated that he has looked <br />into the cost of a preliminary design of the base in connection with <br />the LAWC1N grant. The City has received a bid, with a cost not to <br />exceed 61,1'1, to provide a preliminary plan if the City provides a two <br />foot contour map. A two foot countour nap would cost about 6911. The <br />maximum cost would then be C1,511. <br />Administrator Achen reviewed the history of this grant application. <br />The land survey will help us determine Oat land should be used for <br />storm water detention. <br />Councilmember Shelquist asked where these funds would come from. <br />Administrator Achen stated that they could temporarily come from <br />the General Fund but recommended these funds be accounted for separately <br />as an inprovement project fund. In the future if the Council doesn't <br />go forward with the storm project they could be absorbed in the general <br />fund. Otherwise the costs could be charged to the project and assessed. <br />'1SP (Shelquist-Hodges) to authorize the Staff to proceed to expend <br />n,51'1 for a two foot interval countour map for the Scottl and detention <br />area. The money is to be takeri from the General Fund and an account <br />set up to approve these costs for future assessments against the <br />drainage project. 5 ayes <br />Engineer Hubbard stated that since the police car which will be purchased <br />will require unleaded fuel, the water department pickup could have a <br />smaller engine. The reason for having a 151 V1 engine in the specifications <br />is because it is the smallest V9 which still requires regular gas. The <br />61 amp alternator is needed because hydraulic equipment is used off the <br />battery. The chrome bumper is specified because of rust resistance and <br />it adds to resale value. <br />Mayor Pickar stated he felt the snaller VI is more economical and suggested <br />the specifications be changed. <br />!799l7Y "EYE1'9 97P1DT Attorney 'ieyers gave Administrator Achen a <br />copy of the decision in the case of Laois vs the City of law Hope. The <br />case concerns money and withdrawal riahts. <br />91UlCIL'IC:1179 C!'ELDUIST had nothing to report. <br />C0UlCILMT71DE !ODGES had nothing to report. <br />