My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
gr00090_000047_pg185
MoundsView
>
Commissions
>
City Council
>
Minutes
>
MNHistoricalSocietyFiles (CC Minutes page-by-page 1958-1981)
>
gr00090_000047
>
gr00090_000047_pg185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 6:25:07 PM
Creation date
4/12/2011 10:46:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
July 10, 1978 Page 4 <br />Excavating <br />Brighton Excavating Company <br />1920 Highway 96 <br />Balfany Contractors <br />5500 France Ave. N. <br />Sign Erection <br />Gold Metal Beverage <br />553 N. Fairview Ave. <br />Western Outdoor Advertising <br />4000 Grant St. <br />Brede Inc. <br />2211 Broadway N.E. <br />Fence Installation <br />Able Fence <br />229 Sherburne Ave. <br />Montgomery Ward <br />1400 University Ave. <br />Sewer & Water <br />Schulties Plumbing Co. <br />4549 175th Ave. N.W. <br />Waalen & Sabby Inc. <br />9082 Polk St. N.E. <br />Lawrence Signs <br />945 Pierce Butler Route <br />Naegele Outdoor Advertising <br />1700 W. 78th St. <br />A -1 Fence Co. <br />141 - 104th Lane N.E. <br />Mayor Pickar recessed the regular meeting and opened the first public hearing. <br />PROJECT 1978 -4 - MOUNDS VIEW INDUSTRIAL PARK NO. 2 <br />Engineer Hubbard reported that Project 1978 -4 was designed for the implementation <br />of the Mounds View Industrial Park #2, which includes lots 1, 2 and 3 at the west <br />end of Mustang Drive. It would include the extension of sanitary sewer, water <br />main, additional storm sewer and street. The estimated cost of the project is <br />$118,650. Engineer Hubbard broke down the cost of the various improvements and <br />proposed assessments. He added that Mustang Lane was proposed to provide additional <br />access to the area in case of an emergency. <br />MSP (Pickar - Hodges) to order the improvement and the plans and specs for the extension as <br />required by Staff, and provide that 100% of the assessments be assessed to the <br />owners, as described. The specs will be prepared by Short, Elliott and Hen- <br />drickson. <br />Mayor Pickar closed the public hearing and reopened the regular meeting. <br />COUNTY ROAD H -2 - SPEED LIMIT REDUCTION <br />Mayor Pickar reported that a resolution had been prepared requesting a lower speed <br />limit for County Road H2, as a result of a request from the citizens along H2. <br />Mayor Pickar read the resolution. <br />5 ayes <br />
The URL can be used to link to this page
Your browser does not support the video tag.