My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
gr00090_000052_pg017
MoundsView
>
City Council
>
City Council
>
Minutes
>
MNHistoricalSocietyFiles (CC Minutes page-by-page 1958-1981)
>
gr00090_000052
>
gr00090_000052_pg017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 7:30:21 PM
Creation date
4/12/2011 11:11:33 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNDS VIEW CITY COUNCIL Regular Meeting <br />Page 3 January 14, 1980 <br />Dan Boxrud of S.E.H. explained the <br />proposed installation of water services <br />(Project 80 -1) and possible methods of <br />financing. <br />Walter Skiba, 7841 Silver Lake Road, <br />pointed out a possible problem since the <br />apartments have paid for improvements in <br />the past. Attorney Meyers explained that <br />anyone previously assessed may be due a <br />credit, should the project go through. <br />A discussion took place regarding whether <br />the system would provide adequate fire <br />protection. The Fire Marshal has pre- <br />viously indicated it would not. <br />Glenn Karlen, affected property owner, <br />wants the improvements, but not at $66 <br />per sq. ft. Genevieve Dahlberg, 8605 <br />Baltimore St., affected property owner, <br />felt it was time for the lots to be <br />developed, but thought the cost sounded <br />rather unreasonable. Mrs. Hansen, 7767 <br />Groveland, feels that since her lot is <br />83' wide - -too narrow to build double <br />dwellings similar to those around her and <br />not desirable to build a single family next <br />to double dwellings - -it may be unmarketable <br />and therefore not worth the high cost of <br />water installation. Craig Zuidema, 2809 <br />County Road I, does not want and would <br />not accept the $66 /sq. ft. assessment- - <br />he has recently dug a new well. <br />7. SILVER LAKE ROAD <br />IMPROVEMENTS <br />The Mayor closed the Public Hearing and re- <br />opened the Regular Meeting at 9:00 PM. <br />McCarty moved to deny Project 80 -1 because <br />it is not economically feasible. It was <br />seconded by Ziebarth. <br />The motion carried. <br />5 ayes <br />0 nays <br />Ziebarth moved that this water improvement <br />project be considered for the Capital <br />Improvement Plan when it is considered. <br />It was seconded by McCarty. <br />4 ayes <br />The motion carried. 1 nay <br />(Nay vote: Hodges) <br />Repair of Silver Lake Road has been <br />delayed because of recent cold weather. <br />A 2 ft. settlement of the pipe has been <br />found. The City will clean out the main <br />and determine the damage. <br />9. ENGINEER'S REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.